Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹2.1 L
Closing Date
22 Dec 2025, 3:00 pmClosed
Misc Track works in connection with pre & post attention with screening of shoulder ballast left by FRM over JAT Division.
58-2025-26-DRM-JAT~NR
58-2025-26-DRM-JAT
Open
Works - General
12 Months
Neemuch, Madhya Pradesh
₹0
₹2.1 L
22 Dec 2025
28 Nov 2025
8 Dec 2025
Item Breakup - A-USSOR ITEMS
200000.00 cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. Total 3420000.00 Item- 6 CHAPTER - 15 : Heavy Track Machines S No. Item Description of Item Unit Qty Rate Amount No JAMMU DIVISION-ENGINEERING/NORTHERN RLY
8000.00 FRM/SBCM where muck disposal on side slope is restricted due to platform, cutting, OHE mast etc. and disposing it beyond 5m from edge of cutting up to 3m deep or alternatively carting it up to 50m for disposing off beyond the end of cutting / platform and making up cess wherever low.
200000.00 dumping excess ballast in the cribs and shoulders including boxing/profiling as per IRPWM of track together with left over stretches at fixed structures/masts immediately after FRM work, leveling the muck for making up cess and side slopes including removing and re-fixing of traction bonds during line block with all contractors labour, tools, plant, all lead, lift, crossing of track etc. complete and as directed by the Engineer-in-charge. Providing lighting arrangements with halogen lamps on and around machine during machine working in night time blocks, with contractor's generator, consumables, all necessary electrical fittings, operators etc. Note: 1. Lighting arrangement is to be provided as per advance planning of Night Blocks and written communication. 2. In case lighting arrangement is made available but not used due to non- availability of block, payment @ 60% of the item rate shall be made. 3. In place of Halogen, LED lamps of equal lumen capacity may be used with the approval of Engineer -in-Charge. 4. If lighting arrangement fails during block, recovery shall be made twice the rate per day.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .