| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 CrAdmitted-Finance HOUSE NO 91 NEAR HARJAN CHOUPAL BAJGHERA GURUGRAM HARYANA 122017 | GURUGRAM | GURUGRAM | HARYANA | 122017 | -38.19% | ₹5.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.2 Cr+₹40.0 L (6.84%)Admitted-Finance AD 128 B SHALIMAR BAGH DELHI 110088 | NORTH | DELHI | 110088 | -33.96% | ₹6.2 Cr+₹40.0 L (6.84%) | L2 | Admitted-Finance |
| 3 | L3₹6.7 Cr+₹89.1 L (15.3%)Admitted-Finance E 2 124 SECTOR 11 ROHINI NEW DELHI 110085 | NORTH WEST | DELHI | 110085 | -28.76% | ₹6.7 Cr+₹89.1 L (15.3%) | L3 | Admitted-Finance |
| 4 | L4₹9.0 Cr+₹3.1 Cr (53.7%)Admitted-Finance | -5.00% | ₹9.0 Cr+₹3.1 Cr (53.7%) | L4 | Admitted-Finance |
Tender Value
₹9.4 Cr
EMD Value
₹18.9 L
Closing Date
16 Feb 2026, 3:00 pmClosed
EXecutive Engineer
O/o the Executive Engineer, PWD Division West Road-2/M-112N, Road No. 43, Sainik Vihar, Delhi-110034
Road Restoration of various roads under division WR-2 During 2025-27 (SH Road Restoration of various roads under Sub Division WR-21, WR-22, WR-23, WR-24 and WR-25).
2026_PWD_285934_1
42/SE/WMC/PWD/2025-26(R) (30/EE/PWD/M-112N/2025-26(R)
Open Tender
Civil Works
Percentage
730 days
WR-21, WR-22, WR-23, WR-24 and WR-25
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹18.9 L
Yes
27 Feb 2026
30 Jan 2026
16 Feb 2026
30 Jan 2026
16 Feb 2026
30 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and for all lift,as directed by Engineer-in-Charge. | |||||
| 1.1 | All kinds of soil. | 15,400 | cum | 177.5 | ₹27,33,500 |
| 2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and for all lift,as directed by Engineer-in-Charge. With medium setting bitumen emulsion. | |||||
| 2.1 | On W.B.M / W.M.M. @ 0.4kg/sqm | 35,000 | sqm | 21.2 | ₹7,42,000 |
| 2.2 | On bituminous surface @ 0.25kg/sqm | 35,000 | sqm | 14.05 | ₹4,91,750 |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 5,250 | cum | 2,914.3 | ₹1,53,00,075 |
| 4Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | |||||
| 4.1 | With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 | 7,000 | cum | 2,784 | ₹1,94,88,000 |
| 5Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level : | |||||
| 5.1 | Concrete of M10 grade with minimum cement content of 220 kg /cum | 190 | cum | 8,835.15 | ₹16,78,678.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.50 MB
BOQ_378457.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .