| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC MADHAIPUR NATUNDANGA BURDWAN BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.8 L+₹21,081.03 (2.00%)Rejected-Finance SCRPI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | L2 | Rejected-Finance L2 | |
| 3 | L3₹10.8 L+₹26,456.69 (2.51%)Rejected-Finance S O PO PADAVESWAR PADAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713346 | PADAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance L3 |
Tender Value
₹10.5 L
EMD Value
₹13,200
Closing Date
8 Jul 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Construction of new tippler with chute and accessories at 9 No. Pit and New installation Construction of new tippler with chute and accessories at Laskarband unit under Madhaipur Colliery, Pandaveswar Area
2025_ECL_338560_1
GM-PND/EandM/25-26/66/302 dated 26/06/2025
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Madhaipur Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹13,200
4 Aug 2025
28 Jun 2025
9 Jul 2025
28 Jun 2025
8 Jul 2025
28 Jun 2025
28 Jun 2025 - 1 Jul 2025
Amount
Construction of new tippler with chute and accessories at 9 No. Pit . (Inclusive of EPF/CMPF)
Bottom Support Girder is to be removed by gas cutting of Bolts & Nuts and breaking of PCC concrete( Material Cost) -Oxygen
Bottom Support Girder is to be removed by gas cutting of Bolts & Nuts and breaking of PCC concrete( Material Cost) -DA
Bottom Support Girder is to be removed by gas cutting of Bolts & Nuts and breaking of PCC concrete( Labour Cost)
Bottom Support Girder is to be removed by gas cutting of Bolts & Nuts and breaking of PCC concrete( Labour Cost)
Fixing of Girder by PCC concrete( Material Cost)
Fixing of Girder by PCC concrete( Labour Cost)
Bottom support of tippler stand is to be removed by gas by cutting of bolts & nuts & fresh support 02 nos. to be fabricated from 65mmx365mm×6mm MS Angle with necessary gas holes & fixing the same with base frame by nuts & bolts( Material Cost) -Oxygen
Bottom support of tippler stand is to be removed by gas by cutting of bolts & nuts & fresh support 02 nos. to be fabricated from 65mmx365mm×6mm MS Angle with necessary gas holes & fixing the same with base frame by nuts & bolts( Material Cost) -DA
Bottom support of tippler stand is to be removed by gas by cutting of bolts & nuts & fresh support 02 nos. to be fabricated from 65mmx365mm×6mm MS Angle with necessary gas holes & fixing the same with base frame by nuts & bolts( Material Cost) - MS Nut & Bolts
Bottom support of tippler stand is to be removed by gas by cutting of bolts & nuts & fresh support 02 nos. to be fabricated from 65mmx365mm×6mm MS Angle with necessary gas holes & fixing the same with base frame by nuts & bolts( Labour Cost)
Bottom support of tippler stand is to be removed by gas by cutting of bolts & nuts & fresh support 02 nos. to be fabricated from 65mmx365mm×6mm MS Angle with necessary gas holes & fixing the same with base frame by nuts & bolts( Labour Cost)
Removal of 68 nos. nuts & bolts from both side stiffener plates affixed with both side plates. Fabrication of new stiffener plates from 10mm thick plates with required gas holes & fixed with tippler side plates using Bolts and Nuts( Material Cost) -Oxygen
Removal of 68 nos. nuts & bolts from both side stiffener plates affixed with both side plates. Fabrication of new stiffener plates from 10mm thick plates with required gas holes & fixed with tippler side plates using Bolts and Nuts( Material Cost) -DA
Removal of 68 nos. nuts & bolts from both side stiffener plates affixed with both side plates. Fabrication of new stiffener plates from 10mm thick plates with required gas holes & fixed with tippler side plates using Bolts and Nuts( Material Cost) -MS Nut & Bolts
Removal of 68 nos. nuts & bolts from both side stiffener plates affixed with both side plates. Fabrication of new stiffener plates from 10mm thick plates with required gas holes & fixed with tippler side plates using Bolts and Nuts( Labour Cost)
Removal of 68 nos. nuts & bolts from both side stiffener plates affixed with both side plates. Fabrication of new stiffener plates from 10mm thick plates with required gas holes & fixed with tippler side plates using Bolts and Nuts( Labour Cost)
New supports to be fabricated and fixed with tippler shaft & side plates by welding( Material Cost) -Oxygen
New supports to be fabricated and fixed with tippler shaft & side plates by welding( Material Cost) -DA
New supports to be fabricated and fixed with tippler shaft & side plates by welding( Material Cost) -Welding Rode
New supports to be fabricated and fixed with tippler shaft & side plates by welding( Labour Cost)
New supports to be fabricated and fixed with tippler shaft & side plates by welding( Labour Cost)
New stiffener (both side )to be fabricated & fixed at position (Material Cost) -Oxygen
New stiffener (both side )to be fabricated & fixed at position( Material Cost) -DA
New stiffener (both side )to be fabricated & fixed at position( Material Cost) -MS Nut & Bolts
New stiffener (both side )to be fabricated & fixed at position( Labour Cost)
New stiffener (both side )to be fabricated & fixed at position( Labour Cost)
Coal tub locking arrangements at the top of the tippler to be fixed. (Material Cost) -Oxygen
Coal tub locking arrangements at the top of the tippler to be fixed. (Material Cost) -DA
Coal tub locking arrangements at the top of the tippler to be fixed. (Material Cost)-Welding Rode
Coal tub locking arrangements at the top of the tippler to be fixed. (Labour Cost)
Coal tub locking arrangements at the top of the tippler to be fixed. (Labour Cost)
Both side plates of hopper to be fabricated from 5mm thick plate & erection at position & fixing by welding(Material Cost) -Oxygen
Both side plates of hopper to be fabricated from 5mm thick plate & erection at position & fixing by welding(Material Cost) -DA
Both side plates of hopper to be fabricated from 5mm thick plate & erection at position & fixing by welding(Material Cost)-Welding Rode
Both side plates of hopper to be fabricated from 5mm thick plate & erection at position & fixing by welding(Labour Cost)
Both side plates of hopper to be fabricated from 5mm thick plate & erection at position & fixing by welding(Labour Cost)
Both side approaching platform to be fabricated by 8 mm plate & erection at position & fixing by welding(Material Cost) -Oxygen
Both side approaching platform to be fabricated by 8 mm plate & erection at position & fixing by welding(Material Cost) -DA
Both side approaching platform to be fabricated by 8 mm plate & erection at position & fixing by welding(Material Cost)-Welding Rode
Both side approaching platform to be fabricated by 8 mm plate & erection at position & fixing by welding(Labour Cost)
Both side approaching platform to be fabricated by 8 mm plate & erection at position & fixing by welding(Labour Cost)
Two nos. rail supports below the bottom plate of the hopper to be fixed(Material Cost) -Oxygen
Two nos. rail supports below the bottom plate of the hopper to be fixed(Material Cost) -DA
Two nos. rail supports below the bottom plate of the hopper to be fixed-(Material Cost)-Welding Rode
Two nos. rail supports below the bottom plate of the hopper to be fixed(Labour Cost)
Two nos. rail supports below the bottom plate of the hopper to be fixed(Labour Cost)
Erection & dismantling of scaffolding below the hopper.(Material Cost)-Scaffolding material
Erection & dismantling of scaffolding below the hopper.(Labour Cost)
Erection & dismantling of scaffolding below the hopper.(Labour Cost)
Profit @10%(Material)
New installation Construction of new tippler with chute and accessories at Laskarband unit under Madhaipur Colliery. (Inclusive of EPF/CMPF)
Bottom support of tippler stand is to be removed by gas by cutting of bolts & nuts & fresh support 02 nos. to be fabricated from 65mmx365mm×6mm MS Angle with necessary gas holes & fixing the same with base frame by nuts & bolts ( Material Cost) -Oxygen
Bottom support of tippler stand is to be removed by gas by cutting of bolts & nuts & fresh support 02 nos. to be fabricated from 65mmx365mm×6mm MS Angle with necessary gas holes & fixing the same with base frame by nuts & bolts ( Material Cost) -DA
Bottom support of tippler stand is to be removed by gas by cutting of bolts & nuts & fresh support 02 nos. to be fabricated from 65mmx365mm×6mm MS Angle with necessary gas holes & fixing the same with base frame by nuts & bolts ( Material Cost) -MS Nut & Bolts
Bottom support of tippler stand is to be removed by gas by cutting of bolts & nuts & fresh support 02 nos. to be fabricated from 65mmx365mm×6mm MS Angle with necessary gas holes & fixing the same with base frame by nuts & bolts ( Labour Cost)
Bottom support of tippler stand is to be removed by gas by cutting of bolts & nuts & fresh support 02 nos. to be fabricated from 65mmx365mm×6mm MS Angle with necessary gas holes & fixing the same with base frame by nuts & bolts ( Labour Cost)
New supports to be fabricated and fixed with tippler shaft & side plates by welding( Material Cost) -Oxygen
New supports to be fabricated and fixed with tippler shaft & side plates by welding( Material Cost) -DA
New supports to be fabricated and fixed with tippler shaft & side plates by welding ( Material Cost) -Welding Rode
New supports to be fabricated and fixed with tippler shaft & side plates by welding( Labour Cost)
New supports to be fabricated and fixed with tippler shaft & side plates by welding( Labour Cost)
New stiffener (both side )to be fabricated & fixed at position.( Material Cost) -Oxygen
New stiffener (both side )to be fabricated & fixed at position.( Material Cost) -DA
New stiffener (both side )to be fabricated & fixed at position.( Material Cost) -MS Nut & Bolts
New stiffener (both side )to be fabricated & fixed at position.( Labour Cost)
New stiffener (both side )to be fabricated & fixed at position.( Labour Cost)
Coal tub locking arrangements at the top of the tippler to be fixed.( Material Cost) -Oxygen
Coal tub locking arrangements at the top of the tippler to be fixed.( Material Cost) -DA
Coal tub locking arrangements at the top of the tippler to be fixed.( Material Cost) -Welding Rode
Coal tub locking arrangements at the top of the tippler to be fixed.( Labour Cost)
Coal tub locking arrangements at the top of the tippler to be fixed.( Labour Cost)
Both side plates of hopper to be fabricated from 5mm thick plate & erection at position & fixing by welding( Material Cost) -Oxygen
Both side plates of hopper to be fabricated from 5mm thick plate & erection at position & fixing by welding( Material Cost) -DA
Both side plates of hopper to be fabricated from 5mm thick plate & erection at position & fixing by welding( Material Cost) -Welding Rode
Both side plates of hopper to be fabricated from 5mm thick plate & erection at position & fixing by welding( Labour Cost)
Both side plates of hopper to be fabricated from 5mm thick plate & erection at position & fixing by welding( Labour Cost)
Two nos. rail supports below the bottom plate of the hopper to be fixed( Material Cost) -Oxygen
Two nos. rail supports below the bottom plate of the hopper to be fixed( Material Cost) -DA
Two nos. rail supports below the bottom plate of the hopper to be fixed( Material Cost) -Welding Rode
Two nos. rail supports below the bottom plate of the hopper to be fixed( Labour Cost)
Two nos. rail supports below the bottom plate of the hopper to be fixed( Labour Cost)
Profit @10%(Material)
Total impact of GST for the purpose of CTC
HAREKRISHNA ENTERPRISE (BID ID -1166655)
PRASHANTA KABIRAJ (BID ID -1166664)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .