| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.0 LAccepted-AOC | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹77.4 L+₹7.8 L (11.2%)Rejected-Finance LD 93 SECTOR D LDA COLONY KANPUR ROAD SECTOR D LDA COLONY KANPUR ROAD LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | L2 | Rejected-Finance Due to Higher Rates | |
| 3 | L3₹78.8 L+₹9.2 L (13.2%)Rejected-Finance N A | FARIDABAD | HARYANA | 121004 | L3 | Rejected-Finance Due to Higher Rates | |
| 4 | L4₹79.7 L+₹10.0 L (14.4%)Rejected-Finance LOWER GR FLOOR SHOP NO 2 JEEVAN PLAZA VIPUL KHAND 2 GOMTI NAGAR LUCKNOW U P | LUCKNOW | UTTAR PRADESH | 226001 | L4 | Rejected-Finance Due to Higher Rates | |
| 5 | L5₹81.2 L+₹11.5 L (16.6%)Rejected-Finance 134 SHANTI COLONY ETAWAH | L5 | Rejected-Finance Due to Higher Rates |
Tender Value
₹89.8 L
EMD Value
₹6.5 L
Closing Date
28 Mar 2026, 12:00 pmClosed
Superintending Engineer, 39th Circle, PWD. Lucknow
OFFICE OF Superintending Engineer 39th Circle, PWD, Lucknow
Construction work of Sanchi Toran Gate side to the entrance of Uttar Pradesh Public Service Commission Camp Office Lucknow
2026_PWDBL_1126630_1
554 /131(1)M-39/2026 Date. 06.03.2026
Open Tender
Civil Works - Buildings
Percentage
120 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.5 L
Yes
Superintending Engineer, 39th Circle, PWD. Lucknow
17 Oct 2026
18 Mar 2026
28 Mar 2026
18 Mar 2026
28 Mar 2026
18 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil (DSR No. 2.1.1) | 35.78 | Cum | 105 | ₹3,756.9 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (DSR No. 4.1.8) | 15.45 | Cum | 5,542 | ₹85,623.9 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) (DSR No 5.1.2) | 41.83 | Cum | 7,360 | ₹3,07,868.8 |
| 4 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete (DSR No. 2.27) | 16.12 | Cum | 1,727 | ₹27,839.24 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1 :1.5:3 (1 cement : 1.5 coarse sand(zone-111) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (DSR No. 5.2.2) | 10 | Cum | 8,830 | ₹88,300 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-machanically Treated bars of grade Fe-500D or more. (DSR No. 5.22.6) | 7,717.49 | kg | 87 | ₹6,71,421.63 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1 :4 (1 cement : 4 coarse sand)(DAR NO-6.4.1) | 6.92 | Cum | 7,603 | ₹52,612.76 |
| 8 | Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen plateforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base 1:4 cement mortar : 1 cement : 4 coarse sand, joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curring, moulding and polishing to edges to give high gloss finish etc. complete at all level. Granite stone slab of colour black, Cherry/Ruby red Area of slab over 0.50 sqm ( DSR- 8.2.2.2) | 46.89 | sqm | 4,179 | ₹1,95,953.31 |
| 9 | Providing and laying Polished Lakha Red Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18(+/-2) mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. (A/R) | 52.56 | Sqm | 4,957 | ₹2,60,539.92 |
| 10 | Supply and fixing of desingner iron chain(Grade 70) including supply of all materiais labour T&P etc required for the proeper Completion of the work. As per dirction or E/I (Q/R) | 60 | mtr. | 600 | ₹36,000 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
T2.pdf
Tender Documents • 0.98 MB
BOQ_2101031.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .