| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC | L1 | Accepted-AOC L-1 Bidder | |
| 2 | L2₹10.8 L+₹4,339.40 (0.40%)Rejected-Finance | L2 | Rejected-Finance The L2 Bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical PQC Not Qualified |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
22 Sept 2022, 4:00 pmClosed
S E EMCC III PTEP Panki Kanpur
Office of S E EMCC III PTEP Panki Kanpur
Maintenance of Tubewells Rewinding and Repairing of submersible pumps Motors Maintenance overhauling of Various Pumps and motors installed at various sites of PTEP Replacement repairing of NRV and valves and Maintenance work of departmental Air Condi
2022_RVUNL_719975_1
ET03PTEPEMCCIIIEMCDVIII202223
Open Tender
Pumps/Motors
Fixed-rate
365 days
Kanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,416
Dy CAO CFA BO PTEP Panki Kanpur
₹24,000
19 Oct 2022
8 Aug 2022
23 Sept 2022
8 Aug 2022
22 Sept 2022
8 Aug 2022
8 Aug 2022 - 22 Sept 2022
Amount
Work of soil filling in tube well pit/ down ward area of tube well. (as per scope of work 1)
Work of flooring for tube wells. (as per scope of work 2)
Work of cement plaster of tube well’s floor with apron. (as per scope of work 3)
Work of cleaning bore by boggie. (as per scope of work 4)
Work of Cleaning of tubewell casing to remove clogging/Cavity development with help of O.P. unit/Compressor unit. (as per scope of work 5)
Testing of Water. (as per scope of work 6)
Work of clamping of tube wells. (as per scope of work 7)
Work of taking out of old casing from tube wells. (as per scope of work 8)
Work of Repairing of 200 mm dia old M.S. casing (with mesh or without mesh) for tube wells. (as per scope of work 9)
Work of filling of GRAVIL around the casing of tube well. (Gravil will be provided by the contractor at his own cost.) (as per scope of work 10)
Work of connection of 80 mm discharge line of tube wells to main Water line. (as per scope of work 11)
Work of laying of underground 50 mm/80 mm/100 mm GI pipe for connection of discharge line of tube well to main water line. (as per scope of work 12)
Work of laying of 50/65 mm GI pipe for connection of pump discharge line of tube well to main water line. (as per scope of work 13) (GI pipe will be arranged by the contractor at his own cost.)
Work of laying of 80 mm GI pipe for connection of pump discharge line of tube well to main water line. (as per scope of work 14) (GI pipe will be arranged by the contractor at his own cost.)
Welding of G I FLANGE (including supply of flange) (as per scope of work 15) 50 MM
Welding of G I FLANGE (including supply of flange) (as per scope of work 16) 80 MM
Welding of G I FLANGE (including supply of flange) (as per scope of work 17) 100 MM
Replacement of each teen sheet (8 feet X 2.75feet X 3 mm thickness) of shed of Tube Wells or shed of sub station. (as per scope of work 18)
Pulling out of damaged pump of tube wells and insertion of repaired/new pump (02HP–15 HP) inside PTPS and its residential colonies. (as per scope of work 19)
Cleaning of overhead tanks inside PTPS & residential colonies. (As per scope of work 20)
Replacement of nipples with new one of pump sets. (As per scope of work 21)
Cleaning work of Tubewell Cabin/Booster Pump room and Adjoining Area. (As per scope of work 22).
Survey work for dry/low yield tubewell/hydrofracturing of tubewell for detection of fracture zones in tubewell using hole camera with monitor including transportation and providing CD & Photographs. (As per scope of work 23).
Primary inspection of submersible motor of 10/7.5/5 HP rating (As per scope of work 24).
Dismantling & Assembling of submersible motor of 10/7.5/5 HP rating (As per scope of work 25).
Rewinding of submersible motor 10 HP rating (As per scope of work 26).
Rewinding of submersible motor 7.5 HP rating (As per scope of work 26).
Rewinding of submersible motor 5 HP rating (As per scope of work 26).
Replacement of 02 No. Gun metal bush including Machining & grinding for fitting of Gun Metal Bush of Submersible Motor of 10 HP rating (new parts will be arranged by the contractor at his own cost) (As per scope of work 27).
Replacement of 02 No. Gun metal bush including Machining & grinding for fitting of Gun Metal Bush of Submersible Motor of 7.5 HP rating (new parts will be arranged by the contractor at his own cost) (As per scope of work 27).
Replacement of 02 No. Gun metal bush including Machining & grinding for fitting of Gun Metal Bush of Submersible Motor of 5 HP rating (new parts will be arranged by the contractor at his own cost) (As per scope of work 27).
Replacement of water seal pair of motor (new parts will be arranged by the contractor at his own cost) (As per scope of work 27).
Replacement of damaged Motor thrust plate of gun metal (complete Set i.e. thrust bearing + thrust pad + thrust fiber + segment piece) with new one of 10 HP Submersible Motor (new parts will be arranged by the contractor at his own cost) (As per scope of work 27).
Replacement of damaged Motor thrust plate of gun metal (complete Set i.e. thrust bearing + thrust pad + thrust fiber + segment piece) with new one of 7.5 HP Submersible Motor (new parts will be arranged by the contractor at his own cost) (As per scope of work 27).
Replacement of damaged Motor thrust plate of gun metal (complete Set i.e. thrust bearing + thrust pad + thrust fiber + segment piece) with new one of 5 HP Submersible Motor (new parts will be arranged by the contractor at his own cost) (As per scope of work 27).
Rewinding of motors of Submersible pumps 1 HP rating (As per scope of work 28).
Rewinding of motors of Submersible pumps 2 HP rating (As per scope of work 28).
Overhauling of single phase Submersible Motor 1 HP rating (As per scope of work 29).
Overhauling of single phase Submersible Motor 2 HP rating (As per scope of work 29).
Complete overhauling of 3 phase 1 hp submersible Motor (As per scope of work 30).
Complete overhauling of 3 phase 2 hp submersible Motor (As per scope of work 30).
complete overhauling of 01 hp pumps (As per scope of work 31).
complete overhauling of 02 hp pumps (As per scope of work 31).
Rotor Grinding work of submersible Motor of 10/7.5/5 HP rating (As per scope of work 32).
Dismantling& Assembling of submersible Pump of 10 HP rating (As per scope of work 32).
Dismantling& Assembling of submersible Pump of 7.5 HP rating (As per scope of work 32).
Dismantling& Assembling of submersible Pump of 5 HP rating (As per scope of work 32).
Replacement of damaged Neck ring with new one of submersible of 10/7.5/5 HP rating (As per scope of work 32).
Replacement of damaged 02 No. Gun metal bush and 02 No. Rubber bush with new one including Machining & grinding for fitting of Gun Metal Bush for 4/5 stage submersible pump of 10 HP rating (As per scope of work 32).
Replacement of damaged 02 No. Gun metal bush and 02 No. Rubber bush with new one including Machining & grinding for fitting of Gun Metal Bush for 4/5 stage submersible pump of 7.5 HP rating (As per scope of work 32).
Replacement of damaged 02 No. Gun metal bush and 02 No. Rubber bush with new one including Machining & grinding for fitting of Gun Metal Bush for 4/5 stage submersible pump of 5 HP rating (As per scope of work 32).
Replacement of damaged Pump sleeve with new one of submersible Pump of 10/7.5/5 HP rating (As per scope of work 32).
Replacement of damaged Pump impeller (bronze) with new one of submersible Pump of 10 HP rating (As per scope of work 32).
Replacement of damaged Pump impeller (bronze) with new one of submersible Pump of 7.5 HP rating (As per scope of work 32).
Replacement of damaged Pump impeller (bronze) with new one of submersible Pump of 5 HP rating (As per scope of work 32).
Replacement of damaged Pump shaft with new one of submersible Pump of 10 HP rating (As per scope of work 32).
Replacement of damaged Pump shaft with new one of submersible Pump of 7.5 HP rating (As per scope of work 32).
Replacement of damaged Pump shaft with new one of submersible Pump of 5 HP rating (As per scope of work 32).
Replacement of damaged Rubber ‘O’ Ring with new one of submersible Pump (As per scope of work 32).
Replacement of damaged Drain Plug with new one of submersible Pump (As per scope of work 32).
Complete overhauling of 35 HP 4UP3 Kirloskar make pump and UP80/38 Kirloskar make (25 HP) Pump (As per scope of work 33).
Dismantling and shifting of 35 HP 4UP3 Kirloskar make pump and UP80/38 Kirloskar make (25 HP) from foundation to nearby suitable place. (As per scope of work 33).
Shifting and installation of repaired assembled pump 35 HP 4UP3 Kirloskar make pump and UP80/38 Kirloskar make (25 HP) Pump along with its alignment with motor from nearby suitable place to its foundation. (As per scope of work 33).
Replacement of damaged shaft of pump with new one of 35/40 HP 4UP3 Kirloskar make booster pump/ Pump and UP80/38 Kirloskar make (25 HP) (shaft will be provided by the department free of cost) (As per scope of work 34).
Replacement of damaged impeller of pump with new one of 35/40 HP 4UP3 Kirloskar make booster pump/ Pump and UP80/38 Kirloskar make (25 HP) (impeller will be provided by the department free of cost) (As per scope of work 34).
Replacement of damaged bearing of DE or NDE side with new one of 35HP 4UP3 Kirloskar make booster pump and UP80/38 Kirloskar make (25 HP) Pump (bearing will be provided by the department free of cost) (As per scope of work 34).
Replacement of damaged bearing of DE or NDE side with new one of 35 HP 4UP3 Kirloskar make booster pump and UP80/38 Kirloskar make (25 HP) Pump (bearing will be arranged by the contractor at his own cost) (As per scope of work 34).
Replacement of damaged shaft sleeve with new one of 35 HP 4UP3 Kirloskar make booster pump and UP80/38 Kirloskar make (25 HP) Pump (shaft sleeve will be provided by the department free of cost) (As per scope of work 34).
Replacement of damaged shaft sleeve with new one of 35 HP 4UP3 Kirloskar make booster pump Pump and UP80/38 Kirloskar make (25 HP) Pump (shaft sleeve will be arranged by the contractor at his own cost) (As per scope of work 34).
Repairing of bearing house of DE or NDE side of 35 HP 4UP3 Kirloskar make booster pump and UP80/38 Kirloskar make (25 HP) Pump (As per scope of work 34).
Replacement of damaged stuffing box bush with new one of 35 HP 4UP3 Kirloskar make booster pump and UP80/38 Kirloskar make (25 HP) Pump (bush will be provided by the contractor at his own cost) (As per scope of work 34).
Replacement of damaged rubber star for coupling with new one of 35 HP 4UP3 Kirloskar make booster Pump and UP80/38 Kirloskar make (25 HP) Pump (rubber star will be provided by the department free of cost) (As per scope of work 34).
Replacement of damaged rubber star for coupling with new one of 35 HP 4UP3 Kirloskar make booster Pump and UP80/38 Kirloskar make (25 HP) Pump (Rubber star will be arranged by the contractor at his of cost) (As per scope of work 34).
Replacement of damaged gland with new one of 35 HP 4UP3 Kirloskar make booster Pump and UP80/38 Kirloskar make (25 HP) Pump (As per scope of work 34).
Major Repairing of foundation of 4UP3 Kirloskar make pump & motor (35 HP) and UP80/38 Kirloskar make pump & Motor (25 HP) (As per scope of work 35).
Minor Repairing of foundation of 4UP3 Kirloskar make pump & motor (35 HP) and UP80/38 Kirloskar make pump & Motor (25 HP) (As per scope of work 36).
Work of attending leakage of gland of valve of tubewell/booster pump of different size. (As per scope of work 37).
Fabrication of brass spindle with nut of different size and replacement of the same with old one of 80/100 mm valve (As per scope of work 38).
Fabrication of brass spindle with nut of different size and replacement of the same with old one of 150 mm valve (As per scope of work 38).
Replacement of non return valve with new one of 80/100 mm size (NRV will be provided by the department free of cost) (As per scope of work 39).
Replacement of non return valve with new one of 150 mm size (NRV will be provided by the department free of cost) (As per scope of work 39).
Replacement of non return valve with new one of 80 mm size (NRV will be arranged by the contractor at his own of cost) (As per scope of work 40).
Replacement of non return valve with new one of 100 mm size (NRV will be arranged by the contractor at his own of cost) (As per scope of work 40).
Replacement of non return valve with new one of 150 mm size (NRV will be arranged by the contractor at his own of cost) (As per scope of work 40).
Replacement of Gate Valve with new one of 80/100 mm size (gate valve will be provided by the department free of cost) (As per scope of work 41).
Replacement of Gate Valve with new one of 150 mm size (gate valve will be provided by the department free of cost) (As per scope of work 41).
Replacement of Gate Valve with new one of 80 mm size (gate valve will be arranged by the contractor at his own cost) (As per scope of work 42).
Replacement of Gate Valve with new one of 100 mm size (gate valve will be arranged by the contractor at his own cost) (As per scope of work 42).
Replacement of Gate Valve with new one of 150 mm size (gate valve will be arranged by the contractor at his own cost) (As per scope of work 42).
Repairing of non return valve of 80 mm size (As per scope of work 43).
Repairing of non return valve of 100 mm size (As per scope of work 43).
Repairing of non return valve of 150 mm size (As per scope of work 43).
Repairing of Gate Valve (ISI mark) of 80 mm size (As per scope of work 43).
Repairing of Gate Valve (ISI mark) of 100 mm size (As per scope of work 43).
Repairing of Gate Valve (ISI mark) of 150 mm size (As per scope of work 43).
Work of cleaning of valve’s pit (As per scope of work 44).
Replacement of spindle gutka of supply valve/drain valve with new one. (Spindle gutka will be arranged by the contractor at his own cost) (As per scope of work 45).
Replacement of spindle clamp of gate valve with new one of 100 mm size (As per scope of work 46).
Replacement of spindle clamp of gate valve with new one of 150 mm size (As per scope of work 46).
Work of machining of shaft of 4UP3 booster pump of Kirloskar make. (As per scope of work 47).
Overhauling of 10 HP Kirloskar make Effluent Pump (As per scope of work 48).
Overhauling of Kirloskar make Oil & grease Pump, I HP. (As per scope of work 48).
Overhauling of Kirloskar make Sludge Pump (SP-2H), 3 HP. (As per scope of work 48).
Overhauling of Kirloskar make Self Priming Sewrage Transfrer Pump (SP-3L+/SP-3A), 5 HP. (As per scope of work 48).
Overhauling of Sludge Pump Roto make, 7.5HP/5 H.P. (As per scope of work 48).
Overhauling of Lubricating mono block motor pump set, (1 H.P). (As per scope of work 49).
Overhauling of Kirloskar make Raw sewrage excess flow 3 phase, 5 HP mono block Self Priming Motor Pump Set (As per scope of work 49).
Overhauling of Kirloskar make excess flow sum agitation 3 phase, 3 HP mono block motor pump set/Filter Press Feed Mono Block Self Priming Motor Pump Set (As per scope of work 49).
Overhauling of 3 HP, 3-Phase mono block motor pump set (for drinking water). (As per scope of work 49).
Overhauling of 2 HP, 1- Phase mono block motor pump set (for drinking water). (As per scope of work 49).
Overhauling of 0.5 HP, 1-Phase mono block motor pump set (for drinking water). (As per scope of work 49).
Overhauling of Dozing Pump (model V-13 Miltron Roy India) Max o/p 120LPM. (As per scope of work 49).
Overhauling of KDT-1050++ (monoblock pump motor set), 7.5KW/10H.P. (As per scope of work 49).
Overhauling of 3 phase, 3 HP Induction Motor (As per scope of work 50).
Overhauling of 3 phase, 7.5 HP Induction Motor (As per scope of work 50).
Overhauling of 3 phase, 5 HP Induction Motor (As per scope of work 50).
Overhauling of 3 phase, 10 HP Induction Motor (As per scope of work 50).
Overhauling of 3 phase, 30/40 HP Induction Motor (As per scope of work 50).
Overhauling of 3 phase, 22/25 HP Induction Motor (As per scope of work 50).
Overhauling of CG make vertical IM Motor (As per scope of work 50).
Overhauling of 3 phase,12.5 H.P. induction motor (As per scope of work 50).
Work of overhauling of Single Stage Speed Reducer, Gear Ratio 20/1. Greave make. (As per scope of work 51).
Work of overhauling of Single Stage Speed Reducer, Gear Ratio 10/1, Allroyd make. (As per scope of work 51).
Work of overhauling of fan blade of Aerator as per scope of work mentioned hereunder (As per scope of work 52).
Threading of shaft of Aerator. (As per scope of work 52).
Machining and making hole in coupling of Aerator of required size. (As per scope of work 52).
Rewinding of 10 HP, 950 RPM, 3 phase, Vertical Induction Motor/10 HP, 1440 RPM, 3 phase Horizontal Induction Motor (As per scope of work 53).
Rewinding of 01 HP, 1480/2800 RPM, 3 phase Horizontal Induction Motor (As per scope of work 53).
Rewinding of 0.5 HP, Single phase mono block motor (As per scope of work 53).
Rewinding of 7.5HP, 1440 RPM, 3 phase Induction Motor (As per scope of work 53).
Rewinding of 3 HP, 2900 RPM, 3 phase Induction Motor (As per scope of work 53).
Rewinding of 2HP, 3 phase,1415RPM induction moter (As per scope of work 53).
Rewinding of 5 HP, 1450/2870 RPM, 3 phase Induction Motor (As per scope of work 53).
Rewinding of 3 phase, 22/25 HP Induction Motor (As per scope of work 53).
Rewinding of 35 HP, 1450 RPM, 3 phase Induction Motor (As per scope of work 53).
Rewinding of 3 HP 1450RPM, 3 phase induction moter (As per scope of work 53).
Rewinding of CG make vertical IM Motor (As per scope of work 53).
Rewinding of 3 phase, 12.5 H.P. induction motor 1440 rpm (As per scope of work 53).
Supply & Fixing of Shaft Sleeve (311) of Kirloskar make 10 HP Effluent Pump (model no.HS-100.32, Discharge 125 cubic mtr. per hour). (As per scope of work 54).
Supply & Fixing of Shaft (180) of Kirloskar make 10 HP Effluent Pump (model no. HS-100.32, Discharge 125 cubic mtr. per hour). (As per scope of work 54).
Supply & Fixing of Rubber bearing Set of Kirloskar make 10 HP Effluent Pump (model no. HS-100.32, Discharge 125 cubic mtr per hour). (As per scope of work 54).
Supply & Fixing of Impeller of kirloskar make 10 HP effluent pump (model no. HS-100.32) (As per scope of work 54).
Supply & Fixing of Centre Support ring of Sludge pump (Rotomac-make, model no-SAP 052010105R1A100). (As per scope of work 54).
Supply & Fixing of Oil seal of gear box surface airator (Greaves make, type U 400/U 600, ratio 20/1). (As per scope of work 54).
Supply & Fixing of Chain of gear box Clarifire ratio 10/1). (As per scope of work 54).
Supply & Fixing of Oil seal of gear box of clarifier ratio 10/1). (As per scope of work 54).
Supply & Fixing of MCB 3 phase, 200 Amp. (As per scope of work 54).
Supply & Fixing of MCB 3 phase, 63 Amp. (As per scope of work 54).
Supply & Fixing of MCB 3 phase, 40 Amp. (As per scope of work 54).
Supply & Fixing of MCB 3 phase, 25 Amp. (As per scope of work 54).
Supply & Fixing of Thermal Over Load Realy, Range 20 to 30 amp. with start, off and reset. (As per scope of work 54).
Supply & Fixing of Thermal Timer, Type GT 200 operation 500V, 50 Hz. Range 5 to 18 Sec. (As per scope of work 54).
Supply & Fixing of Stuffing box bush of Kirlosker make dewatering pump (SP3L+/SP2H/ SP3A) (As per scope of work 54).
Supply & Fixing of Shaft sleeve of Kirlosker make dewatering pump (SP3L+/SP2H/ SP3A) (As per scope of work 54).
Supply & Fixing of Water seal of monoblock moter pump set (0.5 HP to 2 HP ) (As per scope of work 54).
Supply & Fixing of Water seal of monoblock moter pump set (3 HP) (As per scope of work 54).
Supply & Fixing of Rubber Star L-095 (As per scope of work 54).
Supply & Fixing of Rubber Star L-099 (As per scope of work 54).
Supply & Fixing of Rubber Star L-225 (As per scope of work 54).
Servicing /overhauling of air conditioners (window/split type of capacity 1.5/2.0 ton) make BlueStar/Voltas/LG/Carrrier/Videocon/ Daikin. (As per scope of work 55).
Servicing/overhauling of water coolers (capacity 40 to 150 liters). Make: Blue Star/Voltas/LG/Carrrier/Videocon/Godrej. (As per scope of work 56).
Periodic cleaning of tank & filter of water coolers (capacity 40 to 150 liters) Make: BlueStar/Voltas/LG/Carrrier/Videocon/kirloskar. (As per scope of work 57).
Periodic cleaning filter (plastic wire mesh) of air conditioner (window/split type of capacity 1.5/2.0 ton). Make: BlueStar/Voltas/ LG/Carrrier/Videocon/Daikin. (As per scope of work 58).
Replacement of damaged compressor unit for 1.5 ton / 2 ton air conditioner/Water cooler with new one (new compressor will be provided by the department free of cost and damaged compressor will be the property of department) (As per scope of work 59).
Replacement of damaged compressor unit for 1.5 ton Air conditioner (window/split type) with new one. New compressor will be provided by contractor at his own cost and damaged compressor will be property of department. Reciprocation type compressor (As per scope of work 59).
Replacement of damaged compressor unit for 1.5 ton Air conditioner (window/split type) with new one. New compressor will be provided by contractor at his own cost and damaged compressor will be property of department. Rotary type compressor (As per scope of work 59).
Replacement of damaged type compressor unit for 2 ton Air conditioner (window/split type) with new one. New compressor will be provided by contractor at his own cost and damaged compressor will be property- Reciprocation type compressor (As per scope of work 59).
Replacement of damaged type compressor unit for 2 ton Air conditioner (window/split type) with new one. New compressor will be provided by contractor at his own cost and damaged compressor will be property of department. Rotary type compressor (As per scope of work 59).
Replacement of damaged compressor unit for water cooler capacity 40 to 150 liters/Refrigerator capacity 40 to 190 liters with new one of (new compressor will be provided by the contractor at his own cost and damaged compressor will be the property of the department) (As per scope of work 60).
Replacement of condenser coil of 1.5/2.0 ton air conditioner. New condenser coil will be provided by contractor at his own cost. (As per scope of work 61).
Repairing of condenser coil of 1.5/2.0 ton air conditioner/water coolers capacity 40 to 150 liters/Refrigerators capacity 40 to 190 liters. (As per scope of work 62).
Fabrication & Installation of outer metallic cover frame of the air conditioner. (As per scope of work 63).
Denting, welding and repairing and painting of water coolers capacity 40 to 150 liters/Refrigerators capacity 40 to 190 liters. (As per scope of work 64).
Transportation charges for shifting of air conditioner (window/split type of capacity 1.5/2.0 ton)/ water cooler (capacity 40 to 150 liters) from one place to another place within premise of PTEP, Panki. (As per scope of work 65).
Gas charging for air conditioner (window/split type) of 1.5 ton capacity. (As per scope of work 66).
Gas charging for air conditioner (window/split type) of 2.0 ton capacity. (As per scope of work 66).
Gas charging for water cooler/Refrigerator. 40 liter to 190 liter. (As per scope of work 67).
Rewinding of blower motor of single speed AC (window/split (type). (As per scope of work 68).
Rewinding of blower motor of variable speed (window/split ac) (As per scope of work 68).
Rewinding of fan motor of water coolers. 40 liter to 190 liter. (As per scope of work 69).
Replacement of electronic PCB of 1.5/2.0 ton window/Split type air conditioner by new one. (As per scope of work 70).
Deployment of 01 AC technician and 1 helper for attending the complaint of AC/water cooler/Refrigerator during emergency visit of VIP at PTEP, Panki, Kanpur. (As per scope of work 71).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Running capacitor, 220/440V (As per scope of work 72).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Starting relay/overload relay SR-1622 or equivalent. (As per scope of work 72).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Thermostate. (As per scope of work 72).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Filter (Plastic wire mesh). (As per scope of work 72).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Metal tap for water cooler. (As per scope of work 72).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Fan Blade. (As per scope of work 72).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Water supply pipe for water cooler. (As per scope of work 72).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Float valve for water cooler. (As per scope of work 72).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Blower fan motor shaft. (As per scope of work 72).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Blower fan motor bush. (As per scope of work 72).
Replacement of various damaged parts with new one (of reputed make) of AC/water cooler/Refrigerator Front grill of window AC. (As per scope of work 72).
Work of overhauling of automatic stabilizer 4 KVA/3KVA installed at VIP Guest House, VIP Residence and GM Building and in premises of PTEP, PANKI & Dispensary, Inter college. (As per scope of work 73)
Work of replacement of damaged parts with new one of automatic voltage stabilizer 4KVA/3KVA installed at VIP Guest House, VIP Residence and GM building, in premises of PTEP, (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department.) Main transformer of 3/4 KVA, AVS (Automatic Voltage Stabilizer, single Phase 220 V, 50 HZ.) (As per scope of work 73)
Work of replacement of damaged parts with new one of automatic voltage stabilizer 4KVA/3KVA installed at VIP Guest House, VIP Residence and GM building, in premises of PTEP, (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department.) (As per scope of work 73) Relay of 4KVA/3KVA, AVS
Work of replacement of damaged parts with new one of automatic voltage stabilizer 4KVA/3KVA installed at VIP Guest House, VIP Residence and GM building, in premises of PTEP, (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department.) (As per scope of work 73) Single Change Over contactor 30 amp. of 4KVA/3KVA,AVS.
Work of replacement of damaged parts with new one of automatic voltage stabilizer 4KVA/3KVA installed at VIP Guest House, VIP Residence and GM building, in premises of PTEP, (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department.) (As per scope of work 73) Time delay circuit of 4KVA/3KVA, AVS.
Work of replacement of damaged parts with new one of automatic voltage stabilizer 4KVA/3KVA installed at VIP Guest House, VIP Residence and GM building, in premises of PTEP, (The damaged parts will be replaced with new one,new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department.) Main Electronic circuit of 4KVA/3KVA, AVS.
Work of replacement of damaged parts with new one of automatic voltage stabilizer 4KVA/3KVA installed at VIP Guest House, VIP Residence and GM building, in premises of PTEP, (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department.) (As per scope of work 73) Circuit Transformer (240 V/9V) of 4KVA/3KVA, AVS.
Work of replacement of damaged parts with new one of automatic voltage stabilizer 4KVA/3KVA installed at VIP Guest House,VIP Residence and GM building, in premises of PTEP, (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department.) (As per scope of work 73) ON/OFF Switch or 2way switch of 4KVA/3KVA, AVS.
Work of overhauling of geyser (25 litre), 220 V, single phase in guest house,V.I.P. Residence of officers colony PTEP (As per scope of work 74)
Replacement of following damaged parts with new one of geyser (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department. (As per scope of work 74) Heating coil 1500 watt ,250V
Replacement of following damaged parts with new one of geyser (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department. (As per scope of work 74) Heating coil 3000 watt , 250V
Replacement of following damaged parts with new one of geyser (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department. (As per scope of work 74) Thermostate
Replacement of following damaged parts with new one of geyser (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department. (As per scope of work 74) Indicator
Replacement of following damaged parts with new one of geyser (The damaged parts will be replaced with new one, new parts will be arranged by the contractor at his own cost and taken out damaged parts will be property of department. (As per scope of work 74) Glass Wool
Overhauling of Ceiling Fan/Cabin Fan. (As per scope of work 75)
Rewinding of ceiling fan along with overhauling. (Orient make) (As per scope of work 76)
Rewinding of ceiling fan along with overhauling. (Polar, Khaitan, Kedia, Bajaj, Usha, Havells make) (As per scope of work 76)
Rewinding of cabin fan along with overhauling. (As per scope of work 76)
Repairing of bearing housing. (As per scope of work 77)
S/F of following ball bearing of approved make 6201 (As per scope of work 78)
S/F of following ball bearing of approved make 6202 (As per scope of work 78)
S/F of following ball bearing of approved make 6203 (As per scope of work 78)
Conversion of bush housing into bearing assembly with machining of shaft of rotor. (As per scope of work 79)
Painting of ceiling fan. (Paint and material required for painting work will be arranged by the contractor at his own cost) (As per scope of work 80)
Work of numbering(15 mm to 20 mm size) on ceiling fan or cabin fan or exhaust fan.(Paint and material required for numbering will be arranged by the contract at his own cost) (As per scope of work 81)
Shifting of ceiling fan or cabin fan. (As per scope of work 82)
Shifting of air cooler. (As per scope of work 83)
Overhauling of Air Cooler Fan. (Kit Fan)/ 12”/18” Exhaust Fan with insulating varnish. (As per scope of work 84)
Rewinding of Air Cooler Fan (Kit Fan)/Exhaust fan single phase, 230V, 50Hz along with overhauling. (As per scope of work 85)
Replacement of shaft of Air Cooler Fan. or Exhaust Fan (As per scope of work 86)
Repairing of bearing housing of 12”/18” Exhaust Fan. (As per scope of work 87)
Replacement of capacitor of Air Cooler Fan (Kit Fan) or Exhaust Fan. (capacitor will be provided by the department free of cost) (As per scope of work 88)
Replacement of ply wood sheet of 3 mm thickness (ply wood will be arranged by the contractor at his own cost) (As per scope of work 89)
Replacement of electric wire for air cooler as per requirement (Wire will be provided by the department free of cost) (As per scope of work 90)
Replacement of wood wool pad with netting of a Air Cooler. (Wood wool pad will be arranged by the contractor as his own cost.) (As per scope of work 91)
Removal or Installation of cooler fan or 12”/18” Exhaust Fan. (As per scope of work 92)
Replacement of 12”/18” metallic frame of Exhaust fan with spokes. (As per scope of work 93)
Replacement of Arm set of kit fan with spokes. (As per scope of work 93)
Replacement of 12”/18” Exhaust fan/kit fan metallic blade. (As per scope of work 94)
Replacement of cabin fan blade. (As per scope of work 94)
Filling of water in water tank of air coolers installed in G M Building of PTEP, Panki. (20 No Cooler for 120 days) (As per scope of work 95)
Danting & Painting of Air Cooler -Removal of old paint, Preparation of surface, smoothening of surface & then painting of surface with one coat of red oxide & two cot of synthetic enamel paint. The above work carried out in the internal& external surface of the cooler. All required material for painting work shall be arranged by the contractor at his own cost. (As per scope of work 96)
Danting & Painting of Air Cooler-Preparation of surface and smoothening of surface of old cooler & then painting of surface with one coat of synthetic enamel paint. The above work carried out in the internal& external surface of the cooler (painting of internal surface of water tank of air cooler with Japanes black paint). All required material for painting work shall be arranged by the contractor at his own cost. (As per scope of work 96)
Danting & Painting of Air Cooler - Internal Surface of water storage tank with water resistance paint first quality paint. All required material for painting work shall be arranged by the contractor at his own cost. (As per scope of work 96)
Replacement & fixing of water storage tank with good quality/gauge GI sheet. All required material for this work shall be arranged by the contractor at his own cost. (As per scope of work 97)
S/F of Desert cooler steel body (GI sheet) Size: 800 X 810 X 1070 mm, without fan motor and pump. (cooler body should be made of good quality22 gauge sheet and height of tank must be 1 feet) (As per scope of work 98)
Repairing of water storage tank with M seal (As per scope of work 99)
Replacement & Fixing of water circulating pipe with elbo (As per scope of work 100)
Replacement of damage copper, flexible card, 3x 2.5 sqmm. (As per scope of work 101)
Replacement of damaged gun metal bush of ceiling fan/cabin fan. (As per scope of work 102)
Replacement of ceiling fan clamps including gentry nut-bolt with split pin. (As per scope of work 103)
Replacement of nut bolt with split pin for ceiling fan.(As per scope of work 103)
Replacement of rubber gutka of ceiling fan/Kit Fan/Exhaust Fan. (As per scope of work 104)
Replacement of capacitor (2.5/4.0 mfd) of ceiling/cabin fan. (As per scope of work 105)
Replacement of damaged gun metal bush of Air Cooler Fan (Kit Fan) with new one. (As per scope of work 106)
Replacement of 5 Amp. plug top. (As per scope of work 107)
Replacement of Water circulating pump for air cooler. (As per scope of work 108)
NARAYAN INDUSTRIAL WORKS
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .