Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
3 Dec 2026, 5:30 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
MS PRIYANKA SHARMA(DFLT)
CHIEF ENGINEER ( TENDER CELL)
NIT 1226 PMGSY Road Renewal Maintenance PKG No CG-07-M 106 District- Jashpur
204206
NIT 1226 PMGSY Road Renewal Maintenance PKG No CG-07-M 106 District- Jashpur
RESTRICTED TENDER
WORKS
PERCENTAGE
6 days
CHIEF ENGINEER ( TENDER CELL)
Required Past Technical Experience: As per Tender document
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
15 documents required · 15 mandatory
Panchayat and Rural Development (PARD)
WORKS
MS PRIYANKA SHARMA(DFLT)
RESTRICTED TENDER
PERCENTAGE
A B C
CHIEF ENGINEER ( TENDER CELL)
TENDER CELL
CGRRDA RAIPUR
90
06
No
1
204206
3 Dec, 2026 5:30:00 PM IST
7 Dec, 2026 6:05:46 PM IST
18 Nov, 2026 7:30:00 PM IST
NIT 1226 PMGSY Road Renewal Maintenance PKG No CG-07-M 106 District- Jashpur
NIT 1226 PMGSY Road Renewal Maintenance PKG No CG-07-M 106 District- Jashpur
207000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
10369000.00
2
7 Dec, 2026 5:30:33 PM IST
10369000
AS PER NIT
AS PER NIT
As per Tender document
5000.00 INR
14d 21h 29m
15 documents required · 14 mandatory · 1 optional
₹5,000
₹2.1 L
18 Nov 2026
18 Nov 2026
7 Dec 2026
18 Nov 2026
7 Dec 2026
90 days
Initial Rehabitation Work's A
Part-B Maintenance of Road (For 5 Years)
Renewal Work's C
Add 18 % GST
Total Cost ( e/c GST)
Assistant Engineer
PIU, No.-01, CGRRDA, Jashpur
Technical Report and Specification
Length of Road (Km):-
Add GST 18%
Total Cost
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
uohuhdj.k gsrq izLrkfor lM+d dk Lfky fujh{k.k fjiksVZ
Lohd`fr o"kZ %&
iqy iqfy;k dk fooj.k %&
jktLo laHkkx ds vuqlkj Ø-@ftyk vuqlkj Øekad@ihvkbZ;w vuqlkj Øekad
mi vfHk;ark
N-x-xzk-l-fo-v-
ifj-fØ;k-bdkbZ-Ø-&01
ftyk&t'kiqj ¼N-x-½
Detail of Maintenance Work's Package
Formate -
Project Implimentation Unit-01,Jashpur (C.G.)
Initial Rehabitation Work's A
Total
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
Detail of Maintenance Work's Packagewise Abstract
Formate -
Project Implimentation Unit-01,Jashpur (C.G.)
Initial Rehabitation Work's A
Total
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
Formate -B-1
Details of the package of maintenance work
Project Implimentation Unit-01,Jashpur (C.G.)
Name of Block:-
Initial Rehabili tation Work's (Part-I)
Annual Routine Maintenance (Part-II)
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
Formate -B-2
Details of road, package completing 10 year maintenance contract
Project Implimentation Unit-01,Jashpur (C.G.)
Name of Block:-
Protection Work
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
Total:
M.P.R.R.D.A. PIU-1, Betul
Annexure "A"
Initial Rehabilitation work
Name of Road:-
Say in Lacs
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
M.P.R.R.D.A. PIU-1, Betul
Part C - Detailed Estimate for Renewal road year 2025-2026
Name of Road:-
Length of Road:-
Block :-
Pacakge No.:-
1.Pavement Renewal
TOTAL
TOTAL
1. Cost of Pavement Renewal
2. Surface Renewal
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Only For Patch
TOTAL
Only For Patch
TOTAL
1.0 % extra for curve and extra widening
TOTAL
1.0 % extra for curve and extra widening
TOTAL
1.0 % extra for curve and extra widening
TOTAL
TOTAL
2 % extra for curve and extra widening
TOTAL
2. Cost of Surface Renewal
Total Cost ( 1+2 )=
Sub Engineer
PIU No. 01 CGRRDA, Jashpur
Jashpur
Part A - Detailed Estimate for Renewal road year 2025-2026
Name of Road:-
Length of Road:-
Block :-
Pacakge No.:-
3.Road Furmiture
3. Total Cost of Road Furmiture
4.Cross Drainade & Protection Work Maintenance
For Np3 Pipe RD
Toe Wall At RD 700 m - 900m
DRAIN RD 800m - 850m
TOTAL
For Np3 Pipe RD
Toe Wall At RD 700 m - 900m
DRAIN RD 800m - 850m
TOTAL
C.C. Shoulder RD 100m - 200m
C.C. Shoulder RD 2500m - 2600m
C.C. Shoulder RD 2400m - 2500m
Toe Wall At RD 700 m - 900m
DRAIN RD 800m - 850m
TOTAL
Toe Wall At RD 700 m - 900m
TOTAL
Toe Wall At RD 700 m - 900m
TOTAL
For Existing S/C 4 X 8.0m at RD 1380m
TOTAL
For Dismentaling of Existing HPC At RD 880 m
4. Total Cost
Total Cost ( 3+4 )=
Total Cost ( 1+2+3+4 )=
Add 18 % GST
Total
Sub Engineer
PIU No. 01 CGRRDA, Jashpur
Jashpur
DETAILED ESTIMATE OF R.C.C. SLAB CULVERT OF 1.50 Mtr. SPAN
Abutment
Wing wall
Nallah bed
Returns
Abutment
Wing wall
Returns
Abutment
Wing wall
Nallah bed
Abutment
Wing wall
Returns
Abutment Cap
DIRT WALL
END PILLAR
Wing wall
Returns
Main Reinforcement (Bottom)
Main Reinforcement (Top)
Distribution (Bottom)
Distribution (Top)
Cap & Dirt Wall(Main Bars)
Cap & Dirt Wall(Stirrups)
Kerb (Main Bars)
Kerb (Stirrups)
Temprature Reinforcement, (Vertical Direction)
Temprature Reinforcement, (Horizontal Direction)
Up To GL
Behind Abutment
Behind Returns
Total
Say (Rs in Lacs ) :
Sub Engineer
PIU No. 01 CGRRDA
Jashpur
DETAILED ESTIMATE OF R.C.C. SLAB CULVERT OF 1.50 Mtr. SPAN
Abutment
Wing wall
Nallah bed
Returns
Abutment
Wing wall
Returns
Abutment
Wing wall
Nallah bed
Abutment
Wing wall
Returns
Abutment Cap
DIRT WALL
END PILLAR
Wing wall
Returns
Main Reinforcement (Bottom)
Main Reinforcement (Top)
Distribution (Bottom)
Distribution (Top)
Cap & Dirt Wall(Main Bars)
Cap & Dirt Wall(Stirrups)
Kerb (Main Bars)
Kerb (Stirrups)
Temprature Reinforcement, (Vertical Direction)
Temprature Reinforcement, (Horizontal Direction)
Up To GL
Behind Abutment
Behind Returns
Total
Say (Rs in Lacs ) :
Sub Engineer
PIU No. 01 CGRRDA
Jashpur
HALF TOP & HALF BOTTOM PLAN
END PILLER
RETURN
RETURN
Abutment
SECTION AA'
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
Name of Road-
1.Toe Wall
2.Toe Wall
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
Name of Road-
20 cm Thick -CC Pavement M 30
Granular Material
GSB 20 cm Thick
CC Pavement
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
Name of Road:-
1.Length
1.Retaining Wall
2.Length
1.Toe Wall
Sub Engineer
PIU No. 01 CGRRDA
Jashpur
Name of Road:-
20 cm Thick -CC Pavement M 30
Granular Material
GSB 20 cm Thick
CC Pavement
Sub Engineer
PIU No. 01 CGRRDA
Jashpur
Part - II :- ESTIMATE OF ANNUAL ROUTINE MAINTENANCE WORK'S
Project Implimentation Unit-01,Jashpur (C.G.)
Name of Road:-
Carriage Way Width/Formation Width
(A) Rate applicable for rutine maintanance before B.T/seal coat renewal/strengthinh will be as under.
Traffic intensity T1 to T4 (Rs. Per km)
Total
(B) Rate applicable after B.T/seal coat renewal/strengthinh will be as under.
Traffic intensity T1 to T4 (Rs. Per km)
Total
(C) Rate applicable for rutine maintanance of cement concrete road entire contract period.
Carriageway/ Road way
Rate (Rs) per km/year(Entire contract period)
Renewal Part (A)
Length (In Km.)
Total
Total
Total
Total
Total
G.Total
Add 18% GST
Total
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
Strip Plan (As Per Work Status)
Name of Road:-
Total Length:-
River Gap-
Project Implimentation Unit-01,Jashpur (C.G.)
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
BAR CHART ( Part - II Annual Routine Maintenance )
Project Implimatation Unit -01 , Jashpur (C.G.)
Length -
1st Year
2nd Year
3rd Year
4th Year
5th Year
Renewal Length
FLOW CHART ( Part - II Annual Routine Maintenance )
TOTAL AMOUNT
1st Year
Total:
2nd Year
3rd Year
4th Year
5th Year
Add 18% GST
Total
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
PRADHAN MANTRI GRAM SADAK YOJANA
(Ministry of Rural Development, Govt. of India )
Detailed Estimate for Dismentaling of Existing Culverts
Name Of Road:- Badabanai To Khutitoli
(B) Cement Concrete
TOTAL
(c) Reinforced Cement Concrete
TOTAL
(A) Rubble Stone Masonry in Lime/Cement/mud mortar
TOTAL
TOTAL
Say Rs/--
DPR Consultant
PRADHAN MANTRI GRAM SADAK YOJANA
Estimate for construction of 1 Row 1000mm DIA NP3. & RD :- 880m
Name Of Road:- NH-43 Lodam To Pondi
S.No/SOR.No
(I) Ordinary Soil
i. Upto 3 m depth
Face wall
Below pipes & Existing road
Total
Foundation Concrete
Face wall
I. P.C.C grade M 15 (Nominal mix (1:2.5:5) cum 4031.00
Face wall
Number Pillers
Total
Deduction of opening of pipe
Net Qty.
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
For U/p Apron
For D/s Apron
Total
Say (lakh)
Sub Engineer Assistant Engineer EXECUTIVE ENGINEER (CGRRDA 01 Jashpur) (CGRRDA 01 Jashpur) (CGRRDA PIU 01 Jashpur)
DETILED DRAWING OF SINGLE ROW 1000 mm DIA NP-3 HUME PIPE CULVERT
HALF TOP & HALF BOTTOM PLAN
Shoulder
sub base
EARTHEN COUSION Minimum 300 mm
Thickness 115mm
U/s Boulder Apron
IRC SP-20-2002
SECTION AA'
BOQ FOR RENEWAL AND MAINTENANCE OF RURAL ROAD UNDER PMGSY
Name of Road :-
Length of Road :-
Pacakge No :-
Total Construction Cost (Rs.)
Sub Engineer Assistant Engineer
PIU No. 01 CGRRDA PIU No. 01 CGRRDA
Jashpur Jashpur
BOQ FOR RENEWAL AND MAINTENANCE OF RURAL ROAD UNDER PMGSY
Name of Road :-
Length of Road :-
Pacakge No :-
Total Construction Cost (Rs.)
Ist Year after renewal of CC
2nd Year after renewal of CC
3nd Year after renewal of CC
4 th Year after renewal of CC
5 th Year after renewal of CC
Total Maintenance Cost (Rs.)
Emergency Work 10%
G-Total Rs.
Add 18 % GST (Rs.)
Total Cost i/c GST (Rs.)
Say( In Lac.)
Sub Engineer Assistant Engineer
PIU No. 01 CGRRDA PIU No. 01 CGRRDA
Jashpur Jashpur
Design of Retaining Wall
Vertical Height
Height upto Footing top
Slope Ht.
Top width of R/W
Front batter
Back batter
Min depth of fill infront of R/Wall
Inner to inner width of retaing wall at bottom=
Bottom width of R/W
Zc/t of wall bottom
first offset
First offset height
Bottom width of footing
Density of back fill =
Angle of Repose
Angle of Friction
Angle of inclination of back
Active earth pressure coefficient for back fill=
Coefficent of friction
Grade of concrete( in t/m sq)
Density of Conc
Permissible compressive stress in concrete=
Permissible tensile stress in concrete=
Live load surcharge =
Dead load of track structure
Dispersion Width
Surcharge Pressure
Stabilizing forces
Wt of soil=
total =
TOTAL MOMENT DUE TO VER. LOADS AT EDGE OF FOOTING=
Destabilizing forces
due to back fill =
TOTAL MOMENT DUE TO HOR LOADS AT FOOTING TOP/BOTTOM=
Stress at top of footing
Calculation of forces
First footing
First footing
Total
Calculation of property
Area at BF
Z at BF
Bearing pressure
Total Stabilising moment
Total Destabilising moment
Net moment =
Sliding
Total Horizontal force
Frictional force
Passive resistance of SOIL IN FRONT
Over Turning
Total Destablizing moment
Stablising Moment
Sub Engineer
Sub Engineer
PIU No. 01 CGRRDA
Jashpur
CGRRDA,PIU-02,Pathalgaon.
Dist-Jashpur.
INDEX MAP ( NOT TO SCALE)
NH-43 Lodam To Pondi
Block
Start Point of Road 0.00 Km.
End Point of Road 2.70 Km.
VillagePondi
Sub Engineer
PIU No. 01 CGRRDA
Jashpur
DETAILED ESTIMATE OF R.C.C. SLAB CULVERT OF 1.50 Mtr. SPAN
Abutment
Wing wall
Nallah bed
Returns
Abutment
Wing wall
Returns
Abutment
Wing wall
Nallah bed
Abutment
Wing wall
Returns
Abutment Cap
DIRT WALL
END PILLAR
Wing wall
Returns
Main Reinforcement (Bottom)
Main Reinforcement (Top)
Distribution (Bottom)
Distribution (Top)
Cap & Dirt Wall(Main Bars)
Cap & Dirt Wall(Stirrups)
Kerb (Main Bars)
Kerb (Stirrups)
Temprature Reinforcement, (Vertical Direction)
Temprature Reinforcement, (Horizontal Direction)
Up To GL
Behind Abutment
Behind Returns
Total
Say (Rs in Lacs ) :
Sub Engineer
PIU No. 01 CGRRDA
Jashpur
CONSTRUCTION OF RURAL ROADS UNDER MATATENANCE (MP)
Estimate for construction of Road Furniture
Name of Road:-
For Chainage:
S.No/ SOR No
Road marking of 75%
Total
Say in lakh
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
HALF TOP & HALF BOTTOM PLAN
END PILLER
RETURN
RETURN
Abutment
SECTION AA'
Sub Engineer
PIU No. 01 CGRRDA
Jashpur
uohuhdj.k gsrq izLrkfor lM+d dk Lfky fujh{k.k fjiksVZ
Lohd`fr o"kZ %&
jktLo laHkkx ds vuqlkj Ø-@ftyk vuqlkj Øekad@ihvkbZ;w vuqlkj Øekad
mi vfHk;ark
N-x-xzk-l-fo-v-
ifj-fØ;k-bdkbZ-Ø-&01
ftyk&t'kiqj ¼N-x-½
TECHNICAL REPORT
Cost of Maintenance Rs :-
Cost of GST Rs :-
Total
Sub Engineer
PIU No.01 CGRRDA PIU No.01 CGRRDA PIU No.01 CGRRDA
Jashpur
ROAD FEATURES
1. Previous Detail (History)
2. Present Condition
TR07 to Benjora Road is constructed under phase 2015-16 package No 07- 87. Date of completion of work is 31-03-2018. Defect liability period has expired on 31-03-2023. This road is in regular use . Due to lapse of more than 5 years after Renewal , Road has damaged which requires re-execution . RCI survey has also been conducted by this office. . To prevent further damage of this road renewal work is urgently required.
(ii) Provision in Estimate :-
1.Restoration of Rain Cuts . . 2.Maintenance of Earthen shoulder . 3. Maintenance of WBM road. 4. Repair to pot holes . 5. Maintenace of bituminous surface road. 6. Providing B.T(0-10500M) (BM+OGPC+ Seal Coat), Remaining (10500-17220m) only (OGPC+ Seal Coat) 7.Providing New 1.5 m CD at RD 11850 m . 8. Providing Toe Wall at all Side of SC and HPC. 9. Providing Retaning Wall And CC Shoulder at Required section. 10.CC Pavement At RD 4350-4550.0 m
Sub-Engineer,
PIU No.01 CGRRDA
Jashpur
Patch Repair Estimate for Over five year Completed Road
Name of Road :-
Package No. : -
Block : -
S.No/ S.O.R.
(i) 5th Kilometre stone (Precasst)
(II) Ordinary Kilometer Stone (Precast)
(III) 200 m stone (precast)
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Patch Repair Estimate for Over five year Completed Road
Name of Road :-
Package No. : -
Block : -
S.No/ S.O.R.
(i) 5th Kilometre stone (Precasst)
(II) Ordinary Kilometer Stone (Precast)
(III) 200 m stone (precast)
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No.:-
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
Repair Estimate for Routine Maintanance of Over five year Completed Road
Name of Road :-
Package No. -
S.No/ S.O.R.
Total
Say Rs
Sub Engineer
PIU-01, CGRRDA,
Jashpur (C.G.)
PRADHAN MANTRI GRAM SADAK YOJANA
Part-B Maintenance of Road (For 5 Years)
ABSTRACT
NAME OF Road
Length Km
Total Rs.
Add 18 % GST
Total
Sub Engineer
PIU No. 01 CGRRDA
Jashpur
PRADHAN MANTRI GRAM SADAK YOJANA
ABSTRACT
Name of Road :-
District :-
Length :-
G-Total
Assistant Engineer
PIU No.01 CGRRDA
Jashpur
DETAILED ESTIMATE OF R.C.C. SLAB CULVERT OF 3 Mtr. SPAN
(II) Ordinary rock (not requiring blasting) i. Upto 3 m depth
Total
Say (Rs in Lacs ) :
Details of Proposed Renewal Works, Year 2023-24
Length in Km
Total
Assistant Engineer
PIU No.01, CGGRDA
Jashpur
PART - III :- ESTIMATE OF RENEWAL OF BITUMINOUS SURFACE
Project Implimentation Unit-01,Jashpur (C.G.)
Chainage (In M)
Total
Chainage (In M)
Total
Chainage (In M)
Total
Chainage (In M)
Total
Chainage (In M)
Total
Chainage (In M)
Total WMM for Profile Correction 5%
Total
Chainage (In M)
Total
Chainage (In M)
Total
Chainage (In M)
2% Extra for Curve and Extra Widening
Total
Chainage (In M)
2% Extra for Curve and Extra Widening
Road Jointing Other Road
Total
Chainage (In M)
2% Extra for Curve and Extra Widening
Road Jointing Other Road
Total
Chainage (In M)
2% Extra for Curve and Extra Widening
Road Jointing Other Road
Total
Chainage (In M)
Total
Chainage (In M)
2% Extra for Curve and Extra Widening
Total
Total
Say in lakh
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
MTN-.066 Renewal of BT Road Period Wise
No renewal
M.P.R.R.D.A. PIU-1, Betul
ESTIMATE OF I.R. Work
Type of CD -
Name of Road :-
Particular
Shoulder
Total
Particular
Total
Particular
PCC for Wall
Shoulder
Total
Particular
Shoulder
Total
Total
Team Leader
Sai Enterprises, Camp Betul
ESTIMATE OF I.R. Work
Type of CD -
Name of Road :-
Particular
Total
Particular
Total
Particular
Total
Particular
Total
Particular
Total
Particular
Total
Particular
Total
Total
Team Leader
Sai Enterprises, Camp Betul
ESTIMATE OF I.R. Work
Type of CD -
Name of Road:-
Particular
Total
Particular
Protection wall (1.5+1.8)/2
Total
Particular
Protection wall
Total
Particular
Protection wall (1.2+0.4)/2
Total
Particular
Total
Particular
Total
Particular
Total
Particular
Total
Total
Sub Engineer
PIU,No.-01, CGRRDA, Jashpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
1588435723018103103_159177_1278507194557121433_80616_Guidelines to Bidders.pdf
NIT • 0.13 MB
4551538323828826809_204206_NIT 1226 Tender Document Renewal Maintenance.pdf
NIT • 1.77 MB
4789226469357643542_204206_Jashpur BOQ CG 07 M 106 NH-43 Lodam To Pondi.xlsx
BOQ • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .