| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC 69 1A DESHBANDHU ROAD EAST KOLKATA 700035 | KOLKATA | KOLKATA | WEST BENGAL | 700035 | ₹2.1 L | L1 | Accepted-AOC lowest bid |
| 2 | L2₹2.1 L+₹1,188 (0.56%)Rejected-Finance BAHIRTAFA JADURBERIA ULUBERIA HOWRAH | ULUBERIA | HOWRAH | WEST BENGAL | ₹2.1 L+₹1,188 (0.56%) | L2 | Rejected-Finance HIGH BID |
| 3 | L3₹2.1 L+₹1,951 (0.92%)Rejected-Finance | ₹2.1 L+₹1,951 (0.92%) | L3 | Rejected-Finance HIGHEST BID |
Tender Value
₹2.1 L
EMD Value
₹4,300
Closing Date
18 Jun 2026, 11:00 amClosed
Executive Engineer(Civil)
E/3 Circular Garden Reach Road, Kolkata ,700024
DESILTING OF DRAINAGE SYSTEM AT BAGDI PARA ROAD BYE LANES NEAR PR. NOS. Z-5/198/16, Z-5/212/B, ETC. IN WARD NO. 141, BR. XV.
2026_KMC_1026785_1
KMC/EE(C)/Br- XV/141/002/2026-2027/R
Open Tender
CIVIL WORKS
Percentage
180 days
Borough XV office
please prefer tender form
4 documents required · 4 mandatory
₹0
₹4,300
Yes
3 Aug 2026
9 Jun 2026
20 Jun 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR ETC.(C)-(I) MISCELLANEOUS 28.Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing thesludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing thesame by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin- Charge. (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside) | 75.9 | M3 | 289 | ₹21,935.1 |
| 2 | (C) III: Labour Rate for Sanitary and Plumbing 4.Methor Mazdoor NOTE:The above rates are exclusive of 10 % profit and 1% Labour welfare cess, which would be admissible to the Contractor, but contractual percentage will not be applicable on the above rates.Page 113 of 124 | 295 | EA | 296 | ₹87,320 |
| 3 | SUPPLYING INSTALLING &OPORATING THE PUMP SETS INCLUDING FUEL, STAFF, OIL, STORE, TRANSPORT, TEMPOTARY SHED, & ACCESSRIES COMPLETE. (A) 3" DIA | 1,440 | HR | 70 | ₹1,00,800 |
| 131 | Estimated amount | - | - | - | - |
| 134 | 1% LWC | - | LS | 2,443.73 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
BOQ_2522404.xls
BOQ • 0.29 MB
TENDER.pdf
Tender Documents • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .