Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 CrAccepted-Finance NO 39 3RD KOVALAN STREET TEACHERS COLONY ERODE 638011 | ERODE | TAMIL NADU | 638011 | L1 | Accepted-Finance ACCEPT | |
| 2 | L2₹14.0 Cr+₹32.7 L (2.39%)Accepted-Finance 7 1 282 C 89 SREERAM NAGAR COLONY BALKAMPET SR NAGAR HYDERABAD 500 038 | HYDERABAD | HYDERABAD | TELANGANA | 500038 | L2 | Accepted-Finance ACCEPT | |
| 3 | Rejected-Technical 2 E FRONT BLOCK 283 OLD NO 188 B P H ROAD KILPAUK CHENNAI 600010 | CHENNAI | TAMIL NADU | 600010 | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | KONGU CONSTRUCTION AND CONTRACTORS H2 | Sri Balaji Constructions H1 |
|---|---|---|---|---|---|
| 1.00ENTRANCE ARCH | |||||
| 1.01 | Clearing scrub jungle growth | 300 | m2 | 6 ₹1,800 Lowest | 6 ₹1,800 Lowest |
| 1.02 | Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B | 133.95 | m³ | 230 ₹30,809.23 Lowest | 235 ₹31,478.99 |
| 1.03 | Filling with Gravel complying with standard specification for filling in foundation and basement | 27.62 | m³ | 350 ₹9,666.3 Lowest | 350 ₹9,666.3 Lowest |
| 1.04 | Anti- termite treatment | 27.62 | m² | 80 ₹2,209.44 Lowest | 85 ₹2,347.53 |
| 1.05 | Supplying and Filling with (Stone Sand) - M-Sand 15mm tk | 20.05 | m³ | 1,500 ₹30,067.88 Lowest | 1,525 ₹30,569.01 |
| 1.06 | Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers | 20.05 | m³ | 5,000 ₹1,00,226.25 Lowest | 5,200 ₹1,04,235.3 |
| 1.07 | Reinforcement Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification. | 72.03 | m³ | 8,500 ₹6,12,288.46 Lowest | 8,700 ₹6,26,695.24 |
| 1.08 | Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification . The binding wire will be supplied by the contractor as per clause MOST specification. | 8,283.05 | kg | 90 ₹7,45,474.88 Lowest | 95 ₹7,86,890.15 |
| 1.09 | Brick Work in Cement Mortar 1:5 using country bricks of size 8 3/4"x 4 1/4" x 2 3/4" including cost and conveyance of all materials at site ,labour charges, curing, etc.., complete and as directed by the department officers | 55.62 | m³ | 5,700 ₹3,17,041.78 Lowest | 5,800 ₹3,22,603.92 |
Tender Value
₹15.9 Cr
EMD Value
₹15.9 L
Closing Date
27 Jun 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Forest Office, Dindigul
District Forest Office, Dindigul
Establishing Slender loris conservation center at Sukkampatty village of Ayyalur Range in Dindigul Forest Division, Dindigul
2024_TNFD_449013_3
465/2024/D1
Open Tender
Civil Works - Buildings
Item Rate
450 days
Dindigul District, Vedasandur Taluk, Sukkampatti
Please refer Tender documents
8 documents required · 8 mandatory
₹0
₹15.9 L
9 Jul 2024
22 Jun 2024
28 Jun 2024
22 Jun 2024
27 Jun 2024
22 Jun 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ENTRANCE ARCH | |||||
| 1.01 | Clearing scrub jungle growth | 300 | m2 | 5.4 | ₹1,620 |
| 1.02 | Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B | 133.95 | m³ | 235.5 | ₹31,545.97 |
| 1.03 | Filling with Gravel complying with standard specification for filling in foundation and basement | 27.62 | m³ | 315.15 | ₹8,703.81 |
| 1.04 | Anti- termite treatment | 27.62 | m² | 85 | ₹2,347.53 |
| 1.05 | Supplying and Filling with (Stone Sand) - M-Sand 15mm tk | 20.05 | m³ | 1,509.08 | ₹30,249.89 |
| 1.06 | Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers | 20.05 | m³ | 4,707.2 | ₹94,357 |
| 1.07 | Reinforcement Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification. | 72.03 | m³ | 7,768.81 | ₹5,59,617.96 |
| 1.08 | Supplying and fabricating and placing inposition mild steel or Ribbed Tor Steel for all reinforced cement concrte works as per the design given incuding cost of steel and binding wire in all floor etc. complete complying with standard specification . The binding wire will be supplied by the contractor as per clause MOST specification. | 8,283.05 | kg | 89.6 | ₹7,42,161.66 |
| 1.09 | Brick Work in Cement Mortar 1:5 using country bricks of size 8 3/4"x 4 1/4" x 2 3/4" including cost and conveyance of all materials at site ,labour charges, curing, etc.., complete and as directed by the department officers | 55.62 | m³ | 5,734.02 | ₹3,18,933.85 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_543000.xls
BOQ Document • 0.48 MB
146716308.pdf
Tender Document • 0.10 MB
tenderdocument.pdf
Tender Document • 0.67 MB
Plan.pdf
Tender Document • 12.13 MB
146716312.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .