Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Approved |
| 2 | Accepted-Technical | Accepted-Technical Approved |
| 3 | Accepted-Technical | Accepted-Technical Approved |
| 4 | Accepted-Technical KH 161 2ND FLOOR H BLOCK KAVI NAGAR GHAZIABAD UTTAR PRADESH 201002 | GHAZIABAD | UTTAR PRADESH | 201002 | Accepted-Technical Approved |
Tender Value
₹1.7 L
EMD Value
₹3,500
Closing Date
4 Aug 2026, 12:00 pmClosed
Executive Engineer
ECTD 220 KV Substation Sector 20 Noida
Civil works at various SubStations in Bulandshahr under jurisdiction of ETC Greater Noida
2026_UPCTL_1168008_1
02/ECTD/GBN/2026-27
Open Tender
Civil Works
Percentage
30 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
UPPTCL, ECTD Gautambudh Nagar
₹3,500
19 Aug 2026
9 Jul 2026
4 Aug 2026
9 Jul 2026
4 Aug 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 SqM on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | - | CuM | 134.12 | - |
| - | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | SqM | 13.3 | - |
| - | Providing and laying in position cement concrete of 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level. | - | CuM | 6,302.41 | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 with 40 mm Stone ballast. | - | CuM | 4,925.5 | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | - | SqM | 296.31 | - |
| - | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) | - | CuM | 5,389.18 | - |
| - | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | Kg | 101.02 | - |
| - | Steel reinforcement for R.C.C. work Thermo-Mechanically Treated bars of grade Fe-500D or more including straightening, cutting, bending, placing in position and binding all complete plinth/above level. | - | Kg | 81.49 | - |
| - | 12 mm cement plaster (IN COARSE SAND) of mix 1:4 (1 cement: 4 coarse sand) | - | SqM | 270.02 | - |
| - | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement with 40 mm thick with 20 mm nominal size stone aggregate. | - | SqM | 464.09 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
PQR02.pdf
Tender Documents • 0.66 MB
BOQ_2190621.xls
BOQ • 0.33 MB
DateExtend02.pdf
PDF • 0.99 MB
DateExtendNotice.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .