Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 194B 2ND FLOOR RAMESH MARKET EAST OF KAILASH NEW DELHI 110065 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110065 | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.5 Cr
EMD Value
₹3.6 L
Closing Date
17 Aug 2026, 1:00 pmClosed
MANOJ KUMAR
CE PTPS Panipat
Replacement of the UPS system of control room Unit-7 and 8, PTPS, Panipat with new-one.
2026_HBC_533499_1
2026E3309BA0 0EE8 4ECD 904E 200797084E6C713PGC
Open Tender
Civil Works
Works
300 days
ASSAN KHURD
As per tender document.
2 documents required · 2 mandatory
₹1,180
₹3.6 L
Yes
19 Aug 2026
3 Jul 2026
19 Aug 2026
3 Jul 2026
17 Aug 2026
3 Jul 2026
3 Jul 2026 - 8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of the UPS system of capacity 2x105KVA of control room Unit-7&8, PTPS, Panipat as per Annexure-IV (NIT). | 2 | Set | - | - |
| 2 | Erection, Testing & Commissioning of New UPS & dismantling of existing UPS for Unit # 7 & 8 as per Annexure-IV (NIT).
(Job Work) | 2 | Set | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_612572.xls
BOQ • 0.25 MB
corrigendum3.pdf
PDF • 0.20 MB
CorrigendumII.pdf
PDF • 0.23 MB
Technicaladdendum.pdf
PDF • 1.42 MB
Corrigendum2.pdf
PDF • 0.24 MB
Addendumfortechnicalspecfication.pdf
PDF • 1.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .