Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC 5 E B 607003 | CUDDALORE | TAMIL NADU | 607003 | ₹1.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 CrRejected-Finance | ₹1.8 Cr | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SRI SEMBAIYANAR CONSTRUCTIONS L2 | DEVI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications . | 12,940 | M2 | 30 ₹3.9 L | 29 ₹3.8 L |
| 2.00 | Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 647 | M3 | 10,845 ₹70.2 L | 10,840 ₹70.1 L |
| 3.00 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 389 | M2 | 12,500 ₹48.6 L | 11,395 ₹44.3 L |
| 4.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 61 | M3 | 5,750 ₹3.5 L | 5,641 ₹3.4 L |
| 5.00 | Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement | 716 | M3 | 7,450 ₹53.3 L | 7,395 ₹52.9 L |
| 6.00 | Providing Bitumen Pat 12mm thick for Expansion joint including cost and conveyance of all other labour and material charges to site etc., complete. | 144 | M2 | 500 ₹72,000 | 479 ₹68,976 |
Updated dates
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
28 Jan 2026, 3:00 pmClosed
Commissioner Vadalur municipality
Commissioner Vadalur municipality
RENEWAL OF BT ROAD AND RESTORATION OF CEMENT CONCRETE ROAD AT WARD NO 27 VENKATAKUPPAM MAIN ROAD 182027R546 WARD NO 06 THENKUTHU ROAD 182006R091 WARD NO 01 BHARATHIDHASAN NAGAR 4TH ROAD 182001R014 WARD NO 05 GOVINDASAMY NAGAR 10 TH ROAD 182005R08
2026_MAWS_642620_1
2374-1/2025/E1
Open Tender
Civil Works - Roads
Vadalur Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.1 L
Vadalur Municipality
10 Mar 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
28 Jan 2026
12 Jan 2026
14 Jan 2026
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications .
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Vibrated Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site form work and centering soft water labour charges for mixing, transporting, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for CC Pavement
Providing Bitumen Pat 12mm thick for Expansion joint including cost and conveyance of all other labour and material charges to site etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_769977.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid