| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.4 LAccepted-AOC NO 99 A VILAPAKKAM ROAD ARUMBAKKAM VILLAGE MANNAVEDU POST TIRUVALLUR DISTRICT 602 021 | ARUMBAKKAM | TIRUVALLUR | TAMIL NADU | 602021 | L1 | Accepted-AOC L1 | |
| 2 | L2₹79.6 L+₹3.2 L (4.16%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Dis Qualified |
Tender Value
₹82.2 L
EMD Value
₹83,000
Closing Date
25 Jun 2025, 3:00 pmClosed
Project Director Joint Director DRDA Tiruvallur
Project Director Joint Director DRDA Tiruvallur
Strengthening of BT Road from Chittambakkam to Monnavedu Pettai Road Poondi Block km 0/0 1/260 (R-172) NABARD XXXI pack 07
2025_RDTN_567571_1
DIPR/2866/Tender/2025
Open Tender
Civil Works
Item Rate
180 days
Poondi Block
Refer Tender Documents
5 documents required · 5 mandatory
₹0
₹83,000
Yes
DRDA Tiruvallur
21 Jul 2025
12 Jun 2025
25 Jun 2025
12 Jun 2025
25 Jun 2025
16 Jun 2025
16 Jun 2025
Amount
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking BT Surface Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Carted Earth Filling collection and supply of carted earth from the approved quarry including cost and conveyance of conveyed earth all materials to site anf labour charges , including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Gravel Shoulders Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Laying of Wet Mix Macadam(WMM) Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Slow Setting Emulsion (SS-1) 7.00 Kg Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Rapid Setting Emulsion (RS-1) 2.5 Kg Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous macadam 50mm Thick Providing and laying 50mm Compacted thick Bituminous macadam using 26.50-11.2mm graded metal and 0.10 cum of 13.20-2.36mm grade metal with 37.00kgs of VG30/VG40 for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP asper clause 507 of MORTH Rev-5
Providing and laying Bituminous Concrete 25/30/40mm Thick (Grade-II) Using VG30 Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.3 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for KM Stone
Provision for HM Stone
Supply and fixing of Sign boards as per specification
Road Marking/ Road Stud with lens reflector
Construction of Hardbed @ ch: 0/530 - 0/550
Earth work excavation and depositing on bank with in initial lead including cost of conveyance etc,..completed
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
P SENTHILKUMAR (BID ID -1377970)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .