| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹2.9 L+₹5,609 (1.99%)Rejected-AOC | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | PPS AND CO L1 | R THANGARAJ L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 A | 44 | 1M3( One cubic metre) | 154 ₹6,776 Lowest | 170 ₹7,480 |
| 2.00 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 35.2 | 1M3( One cubic metre) | 67 ₹2,358.4 Lowest | 85 ₹2,992 |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement four Crushed stone Sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 7 | 1M3( One cubic metre) | 5,103 ₹35,721 Lowest | 5,140 ₹35,980 |
| 4.00 | Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm etc. complete complying with standard specification . | 109 | 1M2( One square metre) | 460 ₹50,140 Lowest | 480 ₹52,320 |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed stone Sand and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 20 | 1M3( One cubic metre) | 6,476 ₹1,29,520 Lowest | 6,490 ₹1,29,800 |
| 6.00 | Plastering with cement mortar (1:4) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 31 | 1M2( One square metre) | 547 ₹16,957 Lowest | 560 ₹17,360 |
| 7.00 | Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm etc. complete complying with standard specification . Culvert | 7 | 1M2( One square metre) | 613 ₹4,291 Lowest | 630 ₹4,410 |
| 8.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and half Crushed stone Sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 2 | 1M3( One cubic metre) | 8,725 ₹17,450 Lowest | 8,740 ₹17,480 |
| 9.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 200 | 1Kg( One Kilo gram) | 90 ₹18,000 Lowest | 95 ₹19,000 |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
21 Aug 2025, 3:00 pmClosed
Commissioner, Dharapuram Municipality
Dharapuram Municipality 207A, Park Road, Dharapuram 638656
Construction of Storm water Drain and culvert at Sivasakthi Nagar Cross street Ward no 14 in Dharapuram Muncipality
2025_MAWS_593704_1
3970/2025/E1
Open Tender
Civil Works
Works
90 days
Dharapuram Municipality
CLASS V AND ABOVE
3 documents required · 3 mandatory
₹0
₹3,500
3 Nov 2025
18 Aug 2025
21 Aug 2025
18 Aug 2025
21 Aug 2025
18 Aug 2025
18 Aug 2025 - 21 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_709010.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .