| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-Finance | ₹3.7 L | L1 | Accepted-Finance Accpeted |
| 2 | L2₹3.9 L+₹21,725.32 (5.85%)Rejected-Finance NO 3 ESI HOSPITAL ROAD PERAVALLUR CHENNAI 600 011 | CHENNAI | CHENNAI | TAMIL NADU | 600011 | ₹3.9 L+₹21,725.32 (5.85%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹4.0 L+₹27,355.92 (7.36%)Rejected-Finance | ₹4.0 L+₹27,355.92 (7.36%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹4.0 L+₹28,936.45 (7.79%)Rejected-Finance | ₹4.0 L+₹28,936.45 (7.79%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹4.1 L+₹34,098.02 (9.18%)Rejected-Finance | ₹4.1 L+₹34,098.02 (9.18%) | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | PR VAITHILINGAM L4 | KALIMUTHU KANNAN L1 | D.VEERAPANDI L3 | V ARUMUGAM L2 | BALASUBRAMANI L5 | manoharan contractor L7 | AZHAGU L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF MINI CSC AT PUTHUKUDIYIRUPPU PU ELE SCHOOL IN MUDIKKARAI PANCHAYT | ||||||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 16.25 | m3 | 207.08 ₹3,365.05 | 211 ₹3,428.75 | 190 ₹3,087.5 Lowest | 211.55 ₹3,437.69 | 200 ₹3,250 | 226.85 ₹3,686.31 | 214.55 ₹3,486.44 |
| 3.00 | Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 2.45 | m3 | 1,758.05 ₹4,307.22 | 1,935 ₹4,740.75 | 1,750 ₹4,287.5 Lowest | 1,939.39 ₹4,751.51 | 1,800 ₹4,410 | 2,079.64 ₹5,095.12 | 1,960.45 ₹4,803.1 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bill | 4.42 | m3 | 4,922.17 ₹21,755.99 Lowest | 5,023 ₹22,201.66 | 5,000 ₹22,100 | 5,035.32 ₹22,256.11 | 5,000 ₹22,100 | 5,399.57 ₹23,866.1 | 5,040.82 ₹22,280.42 |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 2.83 | m3 | 479.6 ₹1,357.27 | 403 ₹1,140.49 | 350 ₹990.5 Lowest | 404.68 ₹1,145.24 | 400 ₹1,132 | 433.95 ₹1,228.08 | 424.34 ₹1,200.88 |
| 6.00 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site including cost of cement which will be supplied by departmental section store at Sivagnagai and the cost there of wil | 14.14 | m3 | 5,143.18 ₹72,724.57 | 5,078 ₹71,802.92 | 4,500 ₹63,630 Lowest | 5,090.18 ₹71,975.15 | 5,500 ₹77,770 | 5,458.3 ₹77,180.36 | 5,115.24 ₹72,329.49 |
| 7.00 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. | 46.19 | m2 | 433.88 ₹20,040.92 Lowest | 438 ₹20,231.22 | 500 ₹23,095 | 439.1 ₹20,282.03 | 500 ₹23,095 | 470.85 ₹21,748.56 | 448.6 ₹20,720.83 |
| 8.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site and including cost of cement which will be supplied and departmental section store attend the cost will be record from contractors bill at the rate of specifi | 6.18 | m3 | 8,106.26 ₹50,096.69 | 7,930 ₹49,007.4 Lowest | 9,000 ₹55,620 | 8,038.71 ₹49,679.23 | 8,000 ₹49,440 | 8,620.06 ₹53,271.97 | 8,220.12 ₹50,800.34 |
| 9.00 | Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered | 590 | kg | 75.52 ₹44,556.8 | 73.5 ₹43,365 Lowest | 91 ₹53,690 | 73.74 ₹43,506.6 | 90 ₹53,100 | 79.07 ₹46,651.3 | 78.45 ₹46,285.5 |
| 10.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 7.2 | m2 | 146.07 ₹1,051.7 | 116 ₹835.2 Lowest | 150 ₹1,080 | 145.37 ₹1,046.66 | 150 ₹1,080 | 155.89 ₹1,122.41 | 160.24 ₹1,153.73 |
Tender Value
₹4.8 L
EMD Value
₹4,830
Closing Date
7 Aug 2026, 3:00 pmClosed
Block Development Officer kalaiyar koil
Block Development Officer , kalaiyar koil
CONSTRUCTION OF MINI CSC AT PUTHUKUDIYIRUPPU PU ELE SCHOOL IN MUDIKKARAI PANCHAY
2026_RDTN_687698_1
CONSTRUCTION OF MINI CSC AT PUTHUKUDIYIRUPPU PU ELE SCHOOL IN MUDIKKARAI PANCHAY
Open Tender
Civil Works
Item Rate
Kalaiyar koil
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,830
Yes
19 Aug 2026
22 Jul 2026
7 Aug 2026
22 Jul 2026
7 Aug 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF MINI CSC AT PUTHUKUDIYIRUPPU PU ELE SCHOOL IN MUDIKKARAI PANCHAYT | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 16.25 | m3 | - | - |
| 3 | Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 2.45 | m3 | - | - |
| 4 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bill | 4.42 | m3 | - | - |
| 5 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 2.83 | m3 | - | - |
| 6 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site including cost of cement which will be supplied by departmental section store at Sivagnagai and the cost there of wil | 14.14 | m3 | - | - |
| 7 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. | 46.19 | m2 | - | - |
| 8 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site and including cost of cement which will be supplied and departmental section store attend the cost will be record from contractors bill at the rate of specifi | 6.18 | m3 | - | - |
| 9 | Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered | 590 | kg | - | - |
| 10 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 7.2 | m2 | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_826558.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
TenderDocument.pdf
Tender Documents • 0.09 MB
BOQ_826558.xls
BOQ • 0.56 MB
Document.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .