Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC NEW ROAD OPP YAMAHA SHOWROOM PO PHUSRO DISTT BOKARO JHARKHAND 829144 | PHUSRO | BOKARO | JHARKHAND | 829144 | ₹13.1 L Quoted ₹11.1 L | L1 | Accepted-AOC Award Value Incl. GST |
| 2 | L2₹12.6 LRejected-Finance OLD BDO OFFICE DHORI PO DHORI PS BERMO DIST BOKARO JHARKHAND 825102 | BOKARO | BOKARO | JHARKHAND | 825102 | ₹12.6 L | L2 | Rejected-Finance As per Approved TCR |
| 3 | L3₹14.7 LRejected-Finance AT KASHMIR COLONY KURPANIA PO SUNDAY BAZAR DISTT BOKARO JHARKHAND 829127 | BOKARO | JHARKHAND | 829127 | ₹14.7 L | L3 | Rejected-Finance As per Approved TCR |
| 4 | L4₹14.9 LRejected-Finance 478 3 834004 | RANCHI | JHARKHAND | 834004 | ₹14.9 L | L4 | Rejected-Finance As per Approved TCR |
| 5 | L5₹15.8 LRejected-Finance | ₹15.8 L | L5 | Rejected-Finance As per Approved TCR |
Tender Value
₹37.2 L
EMD Value
₹46,600
Closing Date
4 Apr 2026, 4:00 pmClosed
Staff Officer (Civil), BnK Area
Staff Officer (Civil), BnK Area, Kargali P.O.-BERMO, DIST.-BOKARO (JHARKHAND)-829104
Preparation of monsoon by provision and repair of garland drain, cross drainage work, CTR road repair in Bokaro Colliery of BnK Area
2026_CCL_357460_1
SO(C)/BnK/E -Tender/25-26/05/201, dt 24.03.2026
Open Tender
Civil Works - Others
120 days
Bokaro Colliery
As per NIT
3 documents required · 3 mandatory
₹46,600
8 May 2026
24 Mar 2026
6 Apr 2026
25 Mar 2026
4 Apr 2026
25 Mar 2026
25 Mar 2026 - 30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) manually over areas (exceeding 30cm in depth 1.5 m in wall as 10 Sq.m on plan) including disposal excavated earth lead up to 50m and lift upto 1.5m disposed earth to be leveled and neatly dressed. All kind of soil | |||||
| 2Supplying and filling in plinth with Jamuna sand under floors, includingwatering, ramming, consolidating and dressing complete. | |||||
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 fine sand : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | |||||
| 4Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | |||||
| 5Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | |||||
| 6Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars | |||||
| 7Centering and shuttering including strutting, propping etc. and removal ofform for : Foundations, footings, bases of columns, etc. for mass concrete | |||||
| 8Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | |||||
| 9Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 1000 mm dia RCC pipes.(Laying by mannual/ machenical means) | |||||
| 10Carriage of materials by Manual labour including loading, unloading and stacking for lead less than 0.50 KM earth lead -50 M | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_370323.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.23 MB
BOQ_370323.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid