Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC C 101 ADG P CHENNAI | L1 | Accepted-AOC Lowest bid value | |
| 2 | L2₹16.7 L+₹1.8 L (12.3%)Rejected-AOC SY NO 17 580 30TH MAIN BSK 3RD STAGE BANGALORE 560085 | BANGALORE | BANGALORE | KARNATAKA | 560085 | L2 | Rejected-AOC Higher bid value | |
| 3 | L3₹21.4 L+₹6.5 L (43.4%)Rejected-AOC | L3 | Rejected-AOC Higher bid value |
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
1 Aug 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) BANGALORE
GE (AF) BANGALORE, HQ TC AIR FORCE , BANGALORE 560006
PROVISION OF AUTOMATIC METER READING BILLING AND INSTALLATION OF TAMPER PROOF METER AT HQTC BANGALORE
2022_MES_532340_1
8872/GE/39
Open Tender
Civil Works
Works
180 days
GE (AF) BANGALORE
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
GE (AF) BANGALORE
₹29,000
Yes
19 Sept 2022
20 Jun 2022
4 Aug 2022
20 Jun 2022
1 Aug 2022
18 Jul 2022
21 Jun 2022 - 27 Jun 2022
Amount
Taking down energy meter fixed in panels of any capacity after carefully disconnecting electrical connections, complete all as specified and directed. Note:- Quoted rate shall deemed to be inclusive of following:- (a) Meter reading record shall be submitted before and after replacement duly signed by the contractor rep and MES rep. (b) Meter should be handed over to MES store. (c) Any rejoining of wires/cables shall be done using suitable PVC wire of existing size/ ferule/ Cable connectors after removal of meter. (d) The cost of making good of disturbed surfaces & matching to the existing surface is deemed to be included in the quoted rates.
Supply, install, testing & commissioning of Microprocessor based single phase tamper proof electronic static prepaid cum postpaid with AMR based facility engery meter rating 240 Volts, 50 HZ, of range 10-60 Amps, confirming to IS 16444: 2015 (Reaffrimed 2020) with LED display and parameters like Voltage, Current, Frequency, Power, Power factor, KWh/KVA, default /in built dual source, inbuilt / add on module ,long range (LORAWAN) Communication suitable only for outdoor LoRa data accumulator and also compatible for EB & DG Measurement , prepaid and post paid online energy monitoring billing system disconnection /reconnection through existing remote software / data export to ERP, complete all as specified and directed Make :Elmeasure , Model :PE5121, NSOFT or equivalent in L&T/ Secure/HPL Note : (i) Warrenty for energy meter shall be 4 years from the date of completion of phase I. (ii) Prepaid/ postpaid online energy monitaring billing system will commence from the date of completion of phase I. The hosting, GPRS charges is for one year from date of completion of phase I and the rate is deemed to include for the same. (iii) Defects if any noticed shall be carried out by the contractor without extra cost to the department during the warrenty period of 4 years from the date of completion of phase I.
Supply and fix IP 51 rated Data Concentrator Unit (DCU) complete for remote automatic meter reading (AMR) solution and cable of communicating with the static energy meter in the corresponding frequency band and with the data server through GPRS and shall have minimum data transfer rate of 9600bps, internal memory for storage data of 50 modules for six months period and shall be based on static energy meter mesh 865-867 MHz Mesh network within 50 mtrs range complete all as specified and as directed. Make L&T, Cyantech, Capital.
Supplying, Fixing, Commissioning and testing of configuration of server Hosted multi user web based software with following modules: (i) Meter Data Management Module: The meter data management module would be responsible for collecting the data from the data concentrator and make the data available to the billing system. The system would support offline meter data entry. The meter data management system would capture and provide the follwing data: (a) 30min instantaneous data from all the meters for seven parameters- Cumulative Energy,Power, Current, Voltage, Power factor, Frequency and KWH/KVAH. (b) Monthly and quarterly billing survey data for cumulative energy and max demand (ii) Billing Module: The billing module would collect the data from the meter data management module, calculate billing determinant and make energy data/ billing data available to admin and end users. (iii) Occupation and vacation Module: The System would support occupation/ vacation based on the unit categories. The system would support automatic data capture on occupation and vacation events. (iv) Customer portal: The system would include a customer portal for the resident/ occupant to log in and view their own energy / billing data. (v) Energy Accounting Module: The system would include features of energy accounting. the system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available. (vi) Communication module: The system should provide communication of energy data and bills via print, email and sms methods (vii) Meter Master Data : The system would support meter data repository. The system should support meter replacment process. (viii) Excel Export : The system would support export of metering and billing data in excel format Make:Elmeasure , Model :Elnet or equivalent
M&L for hosting, GPRS charge for the following :-
One year (ie after completion of 1 year from the date of completion of phase I.
All as per item No 5.01 above but for the next year (2nd year)
All as per item No 5.01 above but for the next year (3rd year)
All as per item No 5.01 above but for the next year (4th year) Note for 5.01 to 5.04: (i) Any defects noticed any during warranty period shall be made serviceable at NO extra cost to the department and the quoted rate is deemed to include for the same. Make : Airtel, Jio, Vodafone or any service provider
All as per item No 5.01 above but for the next year (5th year) including repairs/Maint for energey meters and the system complete all as directed by the Engr-in-Charge
NSOFT INDIA SERVICES PRIVATE LIMITED
RASI AND COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .