Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.3 CrAccepted-AOC 280 ANOOP NAGAR INDORE | INDORE | INDORE | MADHYA PRADESH | L1 | Accepted-AOC AS PER ATTACHED CONCERN DIVISION LETTER | |
| 2 | L2₹22.1 Cr+₹4.7 Cr (27.4%)Rejected-Finance | L2 | Rejected-Finance Being L2 |
| Sl No | Description | Qty | Unit | SATYA LAKSHMI INFRACON L1 | GURDEEP SINGH CHANDI AND COMPANY L2 |
|---|---|---|---|---|---|
| 1.01 | Thick shrub jungle (area above 50% covered by shrubs) clearance involving removal of grass, shrubs, bushes and twigs including rooting out & disposal etc. complete with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer- | 1,78,510 | sqm | 2 ₹3,57,020 Lowest | 2.24 ₹3,99,862.4 |
| 2.01 | Excavation in all kind of soft/loose/hard/ dense soils, moorum & moorum mixed with boulders and mud including dressing, placing the excavated soil neatly in specified dump area or disposing off the same as directed, including cost of site clearance, all materials, machinery, labour and dressing etc. complete with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer-in-Charge. | 68,549 | cum | 38 ₹26,04,862 Lowest | 42.56 ₹29,17,445.44 |
| 3.01 | Excavation in soft/disintegrated/weathered rock including wet excavation, dressing, placing the excavated material neatly in specified dump area or disposing off the same as directed, including cost of site clearance, all materials, machinery, labour and dressing etc. Complete with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer- | 1,126 | cum | 81 ₹91,206 Lowest | 90.72 ₹1,02,150.72 |
| 4.01 | Excavation in hard rock of all toughness (blasting prohibited), placing the excavated rock neatly in specified dump area or disposing off the same as directed, including wet excavation,dewatering, cost of site clearance, all materials, machinery, labour etc. complete with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer- | 20,840 | cum | 310 ₹64,60,400 Lowest | 528.13 ₹1,10,06,120.83 |
| 5.01 | Earthwork for embankment (hearting/ casing) using selected soil from approved borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour and dressing, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting to achieve maximum dry density using sheep foot roller/vibratory compactors etc. Complete.with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer-in-Charge. | 43,080 | cum | 30 ₹12,92,400 Lowest | 33.6 ₹14,47,488 |
| 6.01 | Removing rock-toe/ boulder toe and filter layers below rock-toe/boulder toe including stacking all materials separately as directed etc. complete. and Re- constructing rock-toe, including filter media, below / behind rock-toe, consisting of 300 mm thick sand layer and 300 mm thick gravel/ metal layer, satisfying specified filter criteria laid in layers, using sand from approved quarry and stones and filter gravel/ metal obtained from rock- toe removed for reconstruction including cost of sand, labour, laying filter and stones to specified slopes, wedging with stone chips, finishing surface,uprooting of vegetations etc. complete with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer-in-Charge. | 21,356 | sqm | 362 ₹77,30,872 Lowest | 495.04 ₹1,05,72,074.24 |
| 7.01 | Providing filter blanket consisting Sand passing through
4.75 mm screen on inclined surface steeper than 1 in 5 and chimney filter , Including laying, spreading, packing etc. Complete in layers of required thickness but excluding excavation of foundation with all leads and lifts for all materials and machinery including all charges and as per drawing, specifications of MP WRD and as directed by Engineer-in-Charge | 4,950 | cum | 950 ₹47,02,500 Lowest | 1,367.52 ₹67,69,224 |
| 8.01 | Providing filter blanket consisting aggregate 40 mm nominal size on inclined surface steeper than 1 in 5 and chimney filter , Including laying, spreading, packing etc. Complete in layers of required thickness but excluding excavation of foundation.with all leads and lifts for all materials and machinery including all charges and as per drawing, specifications of MP WRD and as directed by Engineer-in-Charge | 3,300 | cum | 999 ₹32,96,700 Lowest | 1,118.88 ₹36,92,304 |
| 9.01 | Construction of rock toe with quarried stone (other than black trap, basalt or granite) in earthen embankments Including laying and hand packing, dressing, wedging and finishing over surface etc. complete with all leads and lifts for all materials and machinery including all charges and as per drawing, specifications of MP WRD and as directed by Engineer-in-Charge.. | 11,024 | cum | 806 ₹88,85,344 Lowest | 902.72 ₹99,51,585.28 |
| 10.01 | Removing and re-constructing 22cm to 45cm thick dry stone pitching, over 300 mm thick graded filter media consisting of sand and gravel satisfying specified filter criteria laid in layers of 150 mm thick each using sand from approved quarry and stones and gravel/metal obtain from removed pitching for re construction, including cost of sand, labour,laying filter and stones, to specified slopes, wedging with stone chips, finishing surface etc. complete. with all leads and lifts for all materials and machinery including all charges and as per drawing, specifications of MP WRD and as directed by Engineer-in-Charge.. | 49,079 | cum | 203 ₹99,63,037 Lowest | 272.16 ₹1,33,57,340.64 |
Tender Value
₹21.6 Cr
EMD Value
₹10.8 L
Closing Date
23 Dec 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. WRD. Khandwa
E.E. WRD. Khandwa
Rehabilitation and improvement of Sukta (Bhagwant Sagar) Project Khandwa under Drip-II
2022_WRD_233520_1
945/2022-23/e.t/Dt. 21.11.2022
Open Tender
Civil Works - Others
Item Rate
730 days
Khandwa
Please refer Tender documents.
22 documents required · 22 mandatory
₹50,000
Yes
₹10.8 L
Yes
BHOPAL
21 Jun 2023
24 Nov 2022
23 Dec 2022
24 Nov 2022
23 Dec 2022
1 Dec 2022
6 Dec 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Thick shrub jungle (area above 50% covered by shrubs) clearance involving removal of grass, shrubs, bushes and twigs including rooting out & disposal etc. complete with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer- | 1,78,510 | sqm | 2 | ₹3,57,020 |
| 2.01 | Excavation in all kind of soft/loose/hard/ dense soils, moorum & moorum mixed with boulders and mud including dressing, placing the excavated soil neatly in specified dump area or disposing off the same as directed, including cost of site clearance, all materials, machinery, labour and dressing etc. complete with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer-in-Charge. | 68,549 | cum | 38 | ₹26,04,862 |
| 3.01 | Excavation in soft/disintegrated/weathered rock including wet excavation, dressing, placing the excavated material neatly in specified dump area or disposing off the same as directed, including cost of site clearance, all materials, machinery, labour and dressing etc. Complete with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer- | 1,126 | cum | 81 | ₹91,206 |
| 4.01 | Excavation in hard rock of all toughness (blasting prohibited), placing the excavated rock neatly in specified dump area or disposing off the same as directed, including wet excavation,dewatering, cost of site clearance, all materials, machinery, labour etc. complete with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer- | 20,840 | cum | 471.54 | ₹98,26,893.6 |
| 5.01 | Earthwork for embankment (hearting/ casing) using selected soil from approved borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour and dressing, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting to achieve maximum dry density using sheep foot roller/vibratory compactors etc. Complete.with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer-in-Charge. | 43,080 | cum | 30 | ₹12,92,400 |
| 6.01 | Removing rock-toe/ boulder toe and filter layers below rock-toe/boulder toe including stacking all materials separately as directed etc. complete. and Re- constructing rock-toe, including filter media, below / behind rock-toe, consisting of 300 mm thick sand layer and 300 mm thick gravel/ metal layer, satisfying specified filter criteria laid in layers, using sand from approved quarry and stones and filter gravel/ metal obtained from rock- toe removed for reconstruction including cost of sand, labour, laying filter and stones to specified slopes, wedging with stone chips, finishing surface,uprooting of vegetations etc. complete with all leads and lifts for all materials and machinery including all charges and as per specifications of MP WRD and as directed by Engineer-in-Charge. | 21,356 | sqm | 442 | ₹94,39,352 |
| 7.01 | Providing filter blanket consisting Sand passing through
4.75 mm screen on inclined surface steeper than 1 in 5 and chimney filter , Including laying, spreading, packing etc. Complete in layers of required thickness but excluding excavation of foundation with all leads and lifts for all materials and machinery including all charges and as per drawing, specifications of MP WRD and as directed by Engineer-in-Charge | 4,950 | cum | 1,221 | ₹60,43,950 |
| 8.01 | Providing filter blanket consisting aggregate 40 mm nominal size on inclined surface steeper than 1 in 5 and chimney filter , Including laying, spreading, packing etc. Complete in layers of required thickness but excluding excavation of foundation.with all leads and lifts for all materials and machinery including all charges and as per drawing, specifications of MP WRD and as directed by Engineer-in-Charge | 3,300 | cum | 999 | ₹32,96,700 |
| 9.01 | Construction of rock toe with quarried stone (other than black trap, basalt or granite) in earthen embankments Including laying and hand packing, dressing, wedging and finishing over surface etc. complete with all leads and lifts for all materials and machinery including all charges and as per drawing, specifications of MP WRD and as directed by Engineer-in-Charge.. | 11,024 | cum | 806 | ₹88,85,344 |
| 10.01 | Removing and re-constructing 22cm to 45cm thick dry stone pitching, over 300 mm thick graded filter media consisting of sand and gravel satisfying specified filter criteria laid in layers of 150 mm thick each using sand from approved quarry and stones and gravel/metal obtain from removed pitching for re construction, including cost of sand, labour,laying filter and stones, to specified slopes, wedging with stone chips, finishing surface etc. complete. with all leads and lifts for all materials and machinery including all charges and as per drawing, specifications of MP WRD and as directed by Engineer-in-Charge.. | 49,079 | cum | 243 | ₹1,19,26,197 |
stage.html
html • 0.04 MB
techsummary_273577.pdf
PDF • 0.09 MB
BOQ Comparative Chart
xlsx • 0.02 MB
finsummary_273577.pdf
PDF • 0.22 MB
Bhagvantsagar032.pdf
PDF • 0.27 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_273577.xls
BOQ Document • 0.41 MB
109513456.pdf
Tender Document • 4.32 MB
SUKTADRIP2NDCALL.pdf
Tender Document • 7.34 MB
LETTEROFBIDSUKTADRIP2NDCALL.pdf
Tender Document • 0.25 MB
109513461.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .