| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.1 LAccepted-AOC | ₹39.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹39.5 LRejected-Finance | ₹39.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹40.0 LRejected-Finance TALUKA BARSHI DIST SOLAPUR MAHARASHTRA | ₹40.0 L | L3 | Rejected-Finance L3 |
Tender Value
₹39.1 L
EMD Value
₹40,000
Closing Date
10 Dec 2025, 5:00 pmClosed
E E WORKS DIV 01 Z P SOLAPUR
E E WORKS DIV 01 Z P SOLAPUR
Improvement to Ukkadgaon to Chorkahale raod VR 289 VR 4 CH 0/00 TO 2/00 Tal Barshi
2025_SOLAP_1254864_1
42/2025-26
Open Tender
Civil Works - Roads
180 days
Improvement to Ukkadgaon to Chorkahale raod VR 289
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹40,000
30 Mar 2026
3 Dec 2025
11 Dec 2025
3 Dec 2025
10 Dec 2025
3 Dec 2025
Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. C
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils.A)
Providing and laying cement concrete pipe of IS 458:2003 NP-2 class o600mm diametre in proper line,level and slope including providing and fixing collars in cement mortor 1:2 and curing etc complete.A
Providing earth work in embankment with approved materials obtained from other sources upto lead of 50 metres including all lifts, laying in layers of 20 centimetre to 30 centimetre thickness, breaking clods, dressing to the required lines, curves, grade and section, watering and compaction with vibratory roller with V-Sat attachment to achive not less than 97 percent of standard proctor density, excetra complete. (Material obtained from Other sources) B
Prov ing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Intelligent Compactor with compaction analyzer and V-Sat attachment. to the required density. Grading II (Using Screening Type B (11.2 mm) Aggregate) b
Providing and constructing 50mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of VG-30 @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of bitumen VG-10 at the rate of 0.30 Kg Sqm.(on existing bitumen surface.) B)
Providing and applying tack coat on the prepared surface, heating by flames in boiler and spraying bitumen with sprayer. On dry / hungry black topped surface at the rate of 3.0 killogram per 10 square metre. (Using VG-30 bulk bitumen) A)
Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site SSR P. No.with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction VG-30 Bitumen, including providing and laying seal coat sealing voids in a bituminious surface laid to the specified level and cross fall using Type A seal coat but excluding prime / tack coat. For Bitumen VG-30 bulk--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller .A )
Providing bituminous type-A liquid seal coat on bituminous surface including supplying all materials and bitumen of VG-30 grade, preparing existing road surface, heating and applying bitumen at the rate of 0.98 kilogram per square metre by mechanical means, spreading chips and rolling by static roller having weight 8 to 10 metric tonne, excetra complete. B)
Providing and lying in situ/redy mix cement concrete of M-20 proportion with trap/granite/quarzite/gneiss metal in foundation including necessary from work,compacting and curing etc complete(with reversible drum type mixer with SCADA with fine agreegates of required specifications (VSI sand finely washed etc) SSR 2020-21,P.No 81/11.02
Supplying hard murum/ kankar at the road site, including conveying and stacking complete.
Spreading hard murum for side width etc. complete
Add for Royalti Charges
Labouratory testing charges
Add For GST 18%
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
Tendernotice_2.pdf
PDF • 2.20 MB
BOQ_2163243.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid