Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-AOC | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹3.5 L+₹2,552.60 (0.74%)Rejected-AOC | 2 | Rejected-AOC Not Lowest Bidder | |
| 3 | 3₹3.7 L+₹21,270.98 (6.15%)Rejected-AOC | 3 | Rejected-AOC Not Lowest Bidder |
Tender Value
₹3.2 L
EMD Value
₹6,400
Closing Date
21 Aug 2020, 2:00 pmClosed
Executive Engineer Karnal WS Division Karnal
Executive Engineer Karnal WS Division The Mall Road Karnal
Repair of damaged Bridges on various Channels in Karnal W/S Division Karnal
2020_HRY_139599_2
No.7587-7601/53M dated 11/08/2020
Open Tender
Civil Works
Item-rate/Agreement basic
30 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Irrigation and Water Resources Department Haryana
₹6,400
Yes
28 Aug 2020
14 Aug 2020
21 Aug 2020
14 Aug 2020
21 Aug 2020
14 Aug 2020
Amount
Works Details
Dismantling of brick work in cement mortar 1:3 including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge , as per approved drawing/ design supplied by the department & as per PWD specifications. HSR 8.5 (b)
First class brick work laid in cement sand mortar 1:4 in foundation and plinth including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge , as per approved drawing/ design supplied by the department & as per PWD specifications. HSR No. 11.4
Cement concrete 1:3:6 with stone aggregate 20mm nominal size in foundation and plinth (For coping) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge , as per approved drawing/ design supplied by the department & as per PWD specifications. HSR No. 10.40
12mm thick Cement plaster 1:4 on walls including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge , as per approved drawing/ design supplied by the department & as per PWD specifications. HSR No. 15.5
Preparation of plastered or concrete surfaces for painting, including sand papering the surface, applying once coat of linseed oil and filling with approved quality filler, consisting of white lead, linseed oil, varnish and chalk mitti including finishing surface to the required finish, complete including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge , as per approved drawing/ design supplied by the department & as per PWD specifications HSR Item No.16.24
Applying priming coat with cement primer in all shades on newly plastered for concrete surface complete in all respect including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge , as per approved drawing/ design supplied by the department & as per PWD specifications. (HSR item No.16.25)
Painting two coats with ready mixed exterior paint in all shades on newly plastered for concrete surface of walls including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge , as per approved drawing/ design supplied by the department & as per PWD specifications (HSR item No. 16.26).
Cement concrete 1:1.5:3 with stone aggregate 20mm nominal size in foundation and plinth including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge , as per approved drawing/ design supplied by the department & as per PWD specifications HSR No. 10.42
Credit of Bricks.
The Aashish Co op
Creative Vision
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .