Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | -38.10% | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.1 LAdmitted-Finance | -30.30% | ₹2.1 L | L2 | Admitted-Finance |
| 3 | L3₹2.6 LAdmitted-Finance | -15.10% | ₹2.6 L | L3 | Admitted-Finance |
| 4 | L4₹2.8 LAdmitted-Finance | -5.50% | ₹2.8 L | L4 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
18 May 2026, 4:00 pmClosed
XEN REW Kathua
xenrew kathua
Constt. of CSC near Nau Greh Shani Mandir opposite CTM Kathua
2026_RDPR_309783_1
e-NIT No.24/REW/K of 2026-27 Dated 12/05/2026
Open Tender
Civil Works
30 days
Kathua
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹6,000
20 May 2026
12 May 2026
19 May 2026
12 May 2026
18 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Mechanical (Hydrulic Excavator)means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil. | 9.84 | Cum | 256.85 | ₹2,527.4 |
| 2 | Providing and lying in position cement concrete 1 cement:5 fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level. | 1.24 | cum | 4,826.5 | ₹5,984.86 |
| 3 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 3.55 | Cum | 5,733.6 | ₹20,354.28 |
| 4 | Providing and Laying of 30% Stone Boulders | 1.52 | Cum | 937.9 | ₹1,425.61 |
| 5 | Centering and shuttering including strutting, propping etc and removal of the formwork for Foundation, footings Etc | 27.65 | Sqm | 286.35 | ₹7,917.58 |
| 6 | Centering and shuttering including strutting, propping etc and removal of the formwork for Suspanded Floors. | 6.04 | Sqm | 718.2 | ₹4,337.93 |
| 7 | Centering and shuttering including strutting, propping etc and removal of the formwork for Edges of Slab. | 5.39 | rmt | 262.2 | ₹1,413.26 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 2 coarse sand : 4 graded stone aggregates 20mm nominal size. | 1.43 | Cum | 9,821.85 | ₹14,045.25 |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 127.5 | kg | 123.2 | ₹15,708 |
| 10 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:1cement : 6 coarse sand mortar. | 7.52 | Cum | 7,571.55 | ₹56,938.06 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.95 MB
BOQ_1002639.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid