Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate | |
| 2 | L2₹14.6 L+₹1,600.88 (0.11%)Rejected-Finance | L2 | Rejected-Finance Above to Lowest Rate | |
| 3 | L2₹14.6 L+₹1,600.88 (0.11%)Rejected-Finance | L2 | Rejected-Finance Above to Lowest Rate |
Tender Value
₹14.6 L
EMD Value
₹1.5 L
Closing Date
5 May 2026, 1:00 pmClosed
Executive Officer
NPP MAU
WARD NO 45 RAGHUNATH PURA KALYAN SAGAR PUMP HOUSE KE SAAMNE ABUL HASANAT KE MAKAN SE HAFIZ WASI AHMAD KE MAKAN HOTE HUWE JAWED KE MAKAN, MASSJID UMME SALMA SE ANWAR AHMAD KE MAKAN WA SHAMSHAD AHMAD KE MAKAN SE NAUSHAD AHMAD KE MAKAN TAK IRFAN WA AINU
2026_DOLBU_1126188_1
65-44
Open Tender
Civil Works - Others
Percentage
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,560
Executive officer
₹1.5 L
8 Jun 2026
18 Mar 2026
5 May 2026
18 Mar 2026
5 May 2026
18 Mar 2026
Site Clerance including labour and matrials and including grass cutting and carrage of matrials by Head load
Dismenteling of Brick Work including Stacking of materials as directed by the Engineer-in-Charge with the distance of 60.00m. Work SI No. 692
E/W filling in embankment with cartage soil up to 8.00 km distances etc com.
E/W in Excavation in ordenery soil in foudation including labour and matrials and T/P with all com. Work SI No. 251
C.C. Work in 1:6:12 in cement, fine sand and 40 mm Gauge Brick Ballast including labour and matrials, T/P with all com. Work SI No. 273
M-150 B/W in 1:4 in cement and coar sand mortar including labour and matrials , T/P with all com. Work SI No.305 DEDUCTED TO OLD BRICKS & BATS RS. 43972.00
12mm thick Plaster work in 1:3 in cement and fine sand mortar including labour and matrials, T/P with all com. Work SI No.583
R.C.C. Work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials, T/P with all com. Work SI No.285
MS work in R.C.C. work including labour and matrials , T/P with all com. Work SI No.504
Construction of Granular sub base (GSB) by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, 401.
P/L of 80 mm thick rubber moulded Zig-Zag interlocking cement concrete Paver blocks,Work SI No .- NSI
P /L of 80 mm thick rubber moulded interlocking Colour cement concrete Paver blocks,Work SI No. 786(I)
S/F of 0.60X0.45X0.08 mm stone patiya included all comp work.
P.C.C. Work in 1:2:4 in cement, Coarse sand and 20 mm GaugeStone grit including labour and matrials, T/P with all com. Work SI No. 279(B)
Shifting of all material ,add to item 251-253 for every additional 30m .lead or part of 30m.or for every additional 1.50m lift or part of 1.50m .Work SI No-254 450 m distance
S/F of Granite Sign Board including labour and matrials T/P with all com. Work.
Add 18% GST
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_2099940.xls
BOQ • 0.26 MB
tech65.pdf
Tender Documents • 2.13 MB
corridate65.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .