Design, Supply, Erection, Testing & Commissioning of 2x25kV, 50Hz single phase a.c. traction overhead equipment with 65 sq.mm catenary and 107/150 sq.mm contact wire, LT supply transformer stations including modifications to the existing OHE in view of proposed doubling between Tadikalpudi-Bethampudi section with associated yard modifications on Dornakal - Bhadrachalam Road in Secunderabad Division of South Central Railway
E29CTrDSC_02-2026-27~SCR
E29CTrDSC_02-2026-27
Open
Works - General
9 Months
Bhadradri Kothagudem, Telangana
₹0
₹32.9 L
10 Jul 2026
9 Jun 2026
26 Jun 2026
A2-SOR: Foundation items (incl. Supply & Erection) 26544460.00 Below/P
E -Non-SOR- Provision of anti-climbing device in monkey prone area 606300.00 Below/P
Item Breakup - A1-SOR: OHE & PSI Items
Per Track Erection/Labour KM Total 501650.00 Item- 2 1(c) Preparation of Traction Working Rule Diagram along with Working Instructions S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 71214.00 Item- 3 1(d)Supply and Installation of Traction Working Rule Diagram Boards S No. Item Description of Item Unit Qty Rate Amount No
Square Erection/Labour Foot Total 183024.00 Item- 4 3(a)Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 554400.00 Item- 5 3(b)Erection of TTCs, Portals and Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 5038110.00 Item- 6 3(e)Supply and erection of Guy rod assembly. S No. Item Description of Item Unit Qty Rate Amount No SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY
Supply/Material
Erection/Labour Total 836080.00 Item- 7 3(g)Supply of steel reinforcement for RCC work. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 71717.00 Item- 8 4(a)(i)Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 9895500.00 Item- 9 4(a)(ii)Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 242850.00 Item- 10 6(a)Supply and Erection of Regulated Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Per Track Supply/Material KM
Per Track Erection/Labour KM Total 1380027.00 7(a)Erection/Stringing of Along Feeder (either All Aluminium 25 kV Feeder (single spider) or Copper Item- 11 Feeder wire) S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 144048.00 8(a) (v)Supply and Erection of Regulating Equipment With Counter-Weight assembly for Item- 12 Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 2088324.00 Item- 13 8(b)(ii) Supply (without Insulator) and Erection of Materials for Termination of Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 260988.00 8(b)(iii)Supply (without Insulator) and Erection of Materials for Termination of Along Feeder Item- 14 (Aluminium/Copper) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 105264.00 9(a)Supply (without Insulators) and Erection of Anti-creep with galvanized steel wire for Item- 15 Conventional OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Total 456696.00 10(a) Extra on item 6(a) or 6(c) for Supply and Erection of additional fittings required at a turnout, Item- 16 cross-over or over-lap etc S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 132677.00 Item- 17 11(a) (i)Supply (without Insulator) and Erection of 25 kV Solid Core Cut-in Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 257000.00 Item- 18 11(a) (ii)Supply (without Insulator) and Erection of 25 kV Solid Core Suspension Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 553520.00 Item- 19 11(b)Supply (without Insulator) and Erection of 25 kV Post Insulator S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 332080.00 12(a)Supply (without Insulators) and Erection of 25 kV Section Insulator Assembly for Conventional Item- 20 OHE S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 1100940.00 13(a)Supply (without Insulators) and Erection of 25 kV Single Pole Isolator without earth contact Item- 21 assembly S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 430190.00 Item- 22 13(d)Supply and Erection of an Interlocking device S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 4904.00 Item- 23 15(a)Supply and Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 141224.00 Item- 24 15(b)Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 437736.00 SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Item- 25 16(a)Supply and erection of structure bond S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 490047.00 Item- 26 16(b)Supply and erection of longitudinal bond. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 355590.00 Item- 27 16(c) Supply and erection of transverse and special bond S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 194104.00 Item- 28 16(aa)Drilling of Holes on Rails S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 165315.00 Item- 29 17(a)Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 194320.00 Item- 30 17 (b) Supply and erection of earth bus. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 52600.00 Item- 31 17(d)Supply and Erection of Copper Strips (25 x 3 mm) for Equipment Earthing S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 208800.00 Item- 32 26(a)(ii)Supply and erection of 18 mm Copper Bus-bar. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 1135704.00 Item- 33 27(a)Erection of 25 kV/240 V, 5/10/25/50 KVA Auxiliary Transformer S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 28936.00 28Supply (without insulators) and Erection of 25kV Drop out fuse switch for all oil type Auxiliary Item- 34 Transformer of all capacities S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Total 43128.00 Item- 35 30(b)(ii)Supply and Erection of Anti-climbing device for Auxiliary Transformer S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/labour Total 8712.00 31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal of Item- 36 Cantilever Assembly from old Mast or Support S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 486200.00 Item- 37 31(b)Provision of an additional bracket assembly / assemblies on a mast or support. S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 46320.00 Item- 38 31(c )Dismantling of Overhead Equipment S No. Item Description of Item Unit Qty Rate Amount No
Per Track Erection/labour KM Total 13957.00 Item- 39 31(e) Splicing and Extension of Anchored OHE S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 12790.00 Item- 40 31(f) Dismantling of Section Insulator S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 15732.00 Item- 41 31(g) Slewing and Putting back of OHE in original position S No. Item Description of Item Unit Qty Rate Amount No
Each Erection/labour Span Total 68580.00 Item- 42 31(h)Dismantling of an Isolator S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 10680.00 Item- 43 31(k)(i)Dismantlement of OHE mast or structure by cutting. S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 244960.00 Item- 44 31(k)(ii)Dismantlement of Upright of TTC/Portal by cutting. S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 201296.00 Item- 45 31(l)(i)Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Total 345600.00 Item- 46 31(n) Dismantling of guy rod S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 26200.00 31(o)Releasing of Multiple Cantilever Crossarm cantilever assemblies where single cantilever Item- 47 assembly is leftover S No. Item Description of Item Unit Qty Rate Amount No
Erection/labour Total 2620.00 Item- 48 31(p)Dismantlement of drop arms/ booms / temporary masts. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 192924.00 Item- 49 31(r)Dismantling of Cantilever assembly including insulators. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 91200.00 Item- 50 31(s)Dismantling of Fabricated Steel or Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 17016.00 31(t)(i)Dismantling of a regulating equipment (Three-pulley type) with counter weight assembly for Item- 51 Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 55924.00 Item- 52 31(t)(iii)Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 16280.00 Item- 53 31(t)(iv)Dismantling of all types of Copper Jumpers S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 7000.00 Item- 54 31(t)(v)Dismantling of Termination for Conventional type Overhead Equipment S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 11330.00 Item- 55 31(t)(ix)Re-adjustment of OHE Spans, including droppers S No. Item Description of Item Unit Qty Rate Amount No
Each Erection/Labour Span Total 743920.00 Item- 56 31(t)(x) Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 22620.00 SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY 32/3(a)Extra charges for Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Item- 57 Switching Stations under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 332640.00 Item- 58 32/3(b)Extra charges for Erection of TTCs, Portals and Small Parts Steel (SPS) under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 4030488.00 Item- 59 32/3(e)Extra charges for erection of Guy rod assembly under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 44800.00 32/4(a) (i)Extra charges for Erection of Single Cantilever assembly for Conventional OHE under Item- 60 power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 405000.00 Item- 61 32/6(a)Extra charges for Erection of regulated conventional OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
Per Track Erection/Labour KM Total 483620.00 32/7(a)Extra charges for Erection/Stringing of Along Feeder (either All Aluminium 25 kV Feeder Item- 62 (single spider) or Copper Feeder wire) under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 36012.00 32/8(a) (v)Extra charges for Erection of regulating equipment with counter-weight for Conventional Item- 63 OHE under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 56000.00 32/8(b) (ii)Extra charges for Erection of Materials for Termination of Conventional OHE under power Item- 64 block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 15680.00 32/9(a)Extra charges for Erection of anti creep with galvanised steel wire suitable for Conventional Item- 65 OHE under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 30348.00 32/10(a) Extra charges for Extra on item 6(a) or 6(c) for Erection of additional fittings required at a Item- 66 turnout, cross-over or over-lap etc under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 18750.00 Item- 67 32/11(a) (i)Extra charges for Erection of 25 kV solid core cut-in insulator under power block SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 35550.00 Item- 68 32/11(a) (ii)Extra charges for Erection of 25 kV solid core suspension insulator under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 34580.00 Item- 69 32/11(b)Extra charges for Erection of 25 kV Post Insulator under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 75264.00 32/12(a) Extra charges for Erection of 25 kV Section Insulator Assembly for Conventional OHE Item- 70 under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 62340.00 32/13(a)Extra charges for Erection of 25 kV Single Pole Isolator without earth contact assembly Item- 71 under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 28910.00 32/15(a)Extra charges for Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Item- 72 Jumper) under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 19580.00 32/15(b) Extra charges for Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) Item- 73 under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 34680.00 Item- 74 32/26(a)(ii) Extra charges for Erection of 18 mm Copper Bus-bar under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 31536.00 32/31(a) Extra charges for Transfer of Overhead Equipment from one Mast or Support to another, Item- 75 including removal of Cantilever Assembly from old Mast or Support under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 486200.00 32/31(b)Extra charges for Provision of additional bracket assembly / assemblies on a mast or Item- 76 support under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 46320.00 Item- 77 32/31(c) Extra charges for Dismantling of Over Head Equipment under power block. S No. Item Description of Item Unit Qty Rate Amount No
Per Track Erection/Labour KM SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Total 13957.00 Item- 78 32/31(e)Extra charges for Splicing and extension of anchored OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 12790.00 Item- 79 32/31(f) Extra charges for Dismantling of section Insulator under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 15732.00 Item- 80 32/31(g) Extra charges for Slewing and Putting back of OHE in original position under power block. S No. Item Description of Item Unit Qty Rate Amount No
Each Erection/Labour Span Total 68580.00 32/31(k)(i) Extra charges for Dismantlement of OHE mast or structure by cutting under power Item- 81 block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 244960.00 32/31(l)(i) Extra charges for Retrieval of traction masts, main mast of switching station, TTC Item- 82 uprights etc. under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 345600.00 Item- 83 32/31(n) Extra charges for Dismantling of guy rod under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 26200.00 32/31(o) Extra charges for Releasing of Multiple Cantilever Crossarm cantilever assemblies where Item- 84 single cantilever assembly is leftover under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 2620.00 32/31(r) Extra charges for Dismantling of Cantilever assembly including insulators under power Item- 85 block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 91200.00 32/31(s) Extra charges for Dismantling of fabricated steel or Small Parts Steel (SPS) under power Item- 86 block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 17016.00 32/31(t)(i) Extra charges for Dismantling of a regulating equipment (Three-pulley type) with counter Item- 87 weight assembly for Conventional OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 55924.00 SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY 32/31(t)(iii) Extra charges for Dismantling of anticreep with galvanized Steel wire or cadmium Item- 88 catenary wire under power block S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 16280.00 Item- 89 32/31(t)(iv) Extra charges for Dismantling of all types of copper jumpers under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 6860.00 32/31(t)(v) Extra charges for Dismantling of Termination for Conventional type Overhead Item- 90 Equipment under power block. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 11330.00 Item- 91 32/31(t)(ix) Extra charges for Re-adjustment of OHE Spans, including droppers under power block S No. Item Description of Item Unit Qty Rate Amount No
Each Erection/Labour Span Total 743920.00 Item- 92 34(j) Providing and Laying Pitching with Stone Boulders S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 1331800.00 Item- 93 36(a) Unloading of all types of Steel Structures. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 68600.00 Item- 94 36(b) Loading of all type of Steel Structures. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 117600.00 Item- 95 37(a) Unloading of all types of Copper & Aluminum conductors. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 660.00 Item- 96 37(b) Loading of all types of Copper & Aluminum conductors. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 660.00 Item- 97 38 Transportation of OHE structures / Materials / Equipments S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 139200.00 Item- 98 39(a) Erection of released guy rod. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 5600.00 SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Item- 99 39(b) Erection of released bracket assembly. S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 5930.00 Item- 39(d) Erection of released termination. 100 S No. Item Description of Item Unit Qty Rate Amount No
Erection/Labour Total 5600.00 Item- 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 101 S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 599000.00
Item Breakup - A2-SOR: Foundation items (incl. Supply & Erection)
Supply & Erection Total 200080.00 Item- 2 2(a)(ii)Concrete for foundations and plinth in Rocky Soil S No. Item Description of Item Unit Qty Rate Amount No
Supply & Erection Total 205180.00 Item- 3 2(b)Concrete for foundations and plinth in other than Hard and Rock Soil S No. Item Description of Item Unit Qty Rate Amount No
Supply & Erection Total 25844000.00 Item- 4 2 (i) Breaking of foundation up to 200 mm below track formation and drain / PF surface etc S No. Item Description of Item Unit Qty Rate Amount No
Supply & Erection Total 295200.00
Item Breakup - B1-SOR: Steel Supply
Supply/Material Total 21147840.00 Item- 2 3(bs)Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 33842500.00 3[cs]Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and Item- 3 Portals. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 11780480.00
Item Breakup - B2-SOR: Copper Supply
Supply/Material Total 275400.00 Item- 2 6(ds)Supply of 5 mm dia Hard Drawn Round Copper Dropper Wire S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 875000.00 Item- 3 7(cs)Supply of 130 sq.mm Cadmium Copper Large Span Wire S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 5600000.00 Item- 4 15(as)Supply of 50 sq.mm Annealed Stranded Copper Jumper Wire S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 378300.00 Item- 5 15(bs)Supply of 160 sq.mm Annealed Stranded Copper Jumper Wire S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 406500.00
Item Breakup - B3-SOR: Insulator Supply
Supply/Material Total 5629500.00 Item- 2 4(axx)Supply of Composite Stay and Bracket Insulators for Item No. 4(a)(i) / 4(a)(iv) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 3823.00 8(bx)Supply of Porcelain 9-ton Insulator for item no. 8(b)(i)/8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b) Item- 3 (ix)/9(a)/9(b)/9(c)/9(d)/11(a)(i)/11(a)(ii) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 1591680.00 8(bxx)Supply of Composite 9-ton Insulator for item no. 8(b)(i)/8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b) Item- 4 (ix)/9(a)/9(b)/9(c)/9(d)/11(a)(i)/11(a)(ii) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 1920.00 Item- 5 11(bx)Supply of Post Insulator for Item no. 11(b) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 1556240.00 Item- 6 12(ax)Supply of Sectioning and 9-ton Insulators for Item no. 12(a) S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 214360.00 Item- 7 13(ax)Supply of Post and Operating Rod Insulators for Item no. 13(a)/13(f). SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 142360.00 Item- 8 28(x)Supply of Post insulators for item no. 28 S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 44464.00
Item Breakup - B4-SOR: General Supply
Supply/Material Total 2755536.00 Item- 3 27(cs)Supply of 25 KVA, 25 kV/ 240 V Oil filled Auxiliary Transformer S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 529820.00 Item- 4 28(s)Supply of 25 kV Operating Rod For Drop Out Fuse Switch S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 16644.00
Item Breakup - D -SOR: 2X25 KV
Supply/Material
Erection/Labour Total 1477116.00 7(d) Supply and Erection of Buried Earth Conductor (BEC) with necessary accessories, fittings and Item- 2 fasteners. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 2018940.00 Item- 3 7(d)(i) Supply and Erection of TEE connector for BEC end and lug for connection. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 380400.00 8(a)(i) Supply and Erection of 3:1 type modified ATD with counter weight assembly for conventional Item- 4 OHE (regulated) 2400 kgf. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 1913400.00 13(h) Supply and Erection of DP Isolator complete with SPS, insulators and jumpering arrangement Item- 5 etc suitable for 2x25kV systems. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY Total 3395646.00
Item Breakup - E -Non-SOR- Provision of anti-climbing device in monkey prone area
Supply/Material
Erection/Labour Total 150500.00 Item- 2 Supply and erection of anticlimbing device etc., on OHE portals / TTCs (N/O/R/BFB/GU/TTU). S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material
Erection/Labour Total 455800.00
Item Breakup - F -Non-SOR: Tools and plants
Supply/Material Total 24000.00 Item- 2 Supply of insulator box along with locking arrangements S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 52500.00 Item- 3 Supply of Rail jumpers with both end clamps 3 mtrs 25Sq.mm High Insulated S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 49560.00 Item- 4 Supply of Rail jumpers with both end clamps 5 mtrs 25Sq.mm High Insulated S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 68440.00 Item- 5 Supply of Rail jumpers with both end clamps 10 mtrs 25Sq.mm High Insulated S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 114460.00 Item- 6 Supply of Rechargeable heavy duty LED torch S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 6269.75 Item- 7 Supply of electrical hand gloves class-4 (36000V),insulation aloves for electrical Works usage. S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 1440.00 Item- 8 Supply of Digital Screw gauge S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 14702.00 Item- 9 Supply of Digital vernier callipers SCR-CONST-HQ-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 23586.00 Item- 10 Supply of Glass-fibre reinforced polyester tube Non-Contact High Voltage Detector S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 159300.00 Item- 11 Supply of digital megger S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 39187.80 Item- 12 Supply of hand driveen megger S No. Item Description of Item Unit Qty Rate Amount No
Supply/Material Total 32400.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .