| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAccepted-Finance | ₹30.9 L | L1 | Accepted-Finance Due to Lowest rates |
| 2 | L2₹31.4 LRejected-Finance | ₹31.4 L | L2 | Rejected-Finance Due to Higher Rates |
| 3 | L3₹36.0 LRejected-Finance | ₹36.0 L | L3 | Rejected-Finance Due to Higher Rates |
| 4 | L4₹37.0 LRejected-Finance | ₹37.0 L | L4 | Rejected-Finance Due to Higher Rates |
| 5 | L5₹37.5 LRejected-Finance E E NAGAR NIGAM GORAKHPUR | ₹37.5 L | L5 | Rejected-Finance Due to Higher Rates |
Tender Value
₹47.0 L
EMD Value
₹4.4 L
Closing Date
7 May 2026, 12:00 pmClosed
Superintending Engineer
39th Circle, PWD. Lucknow
Jawahar Bhawan (North Wing) ki bahari satah ka sudrdheekaran va rangai -putai ka karya.
2026_PWDBL_1144006_1
942/131(1)-39/2026, Dt. 23.04.2026
Open Tender
Civil Works - Buildings
90 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
Yes
₹4.4 L
Yes
Superintending Engineer, 39th Circle, PWD. Lucknow
11 May 2026
2 May 2026
7 May 2026
2 May 2026
7 May 2026
2 May 2026
2 May 2026 - 7 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete DSR 13.88 | 10,869.23 | sqm | 16 | ₹1,73,907.68 |
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. DSR 15.56 | 978.23 | sqm | 44 | ₹43,042.12 |
| 3 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) DAR- 13.4.1 | 978.23 | sqm | 290 | ₹2,83,686.7 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DAR 4.1.3 | 11.44 | cum | 6,410 | ₹73,330.4 |
| 5 | Steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. thermo-mechanically treated bars of grade fe-500D or more. DSR 5.22.6 | 1,347.06 | kg | 87 | ₹1,17,194.22 |
| 6 | P/A white cement based putty of average thickness 1 mm of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 13.80 | 10,869.23 | sqm | 126 | ₹13,69,522.98 |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture DAR 13.62.1 | 3,635 | sqm | 184 | ₹6,68,840 |
| 8 | Finishing wall with Premium Acrylic Smooth exterior Paint with Silicone Additives of required Shade New work. (Two or More Coats applied @1.43 ltr/10 sqm) Over and Including Priming Coat of Exterior Primer applied @ 2.20kg /10 sqm) (Apex Ultima, Weather Coat All guard asian, Berger. (Ch-15/DSR N0-13.47.1, ) | 10,869.23 | sqm | 139 | ₹15,10,822.97 |
| 9 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. DSR 14.27 | 1,630.38 | sqm | 275 | ₹4,48,354.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.90 MB
T21.pdf
Tender Documents • 1.14 MB
BOQ_2137277.xls
BOQ • 0.24 MB