Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.1 LAccepted-AOC 368 PHASE 4 SAS NAGAR MOHALI 160059 PB | MOHALI | SAS NAGAR | PUNJAB | 160059 | L1 | Accepted-AOC L1 QUOTED | |
| 2 | L2₹42.0 L+₹1.9 L (4.84%)Rejected-AOC 96 SECTOR 16 A CHANDIGARH 160015 | CHANDIGARH | CHANDIGARH | 160015 | L2 | Rejected-AOC L2 QUOTED | |
| 3 | L3₹42.8 L+₹2.7 L (6.74%)Rejected-AOC 901 GH 83 SECTOR 20 PANCHKULA 134116 | PANCHKULA | HARYANA | 134116 | L3 | Rejected-AOC L3 QUOTED | |
| 4 | L4₹45.0 L+₹4.9 L (12.3%)Rejected-AOC HM 324 PHASE IX SAS NAGAR MOHALI PB | L4 | Rejected-AOC L4 QUOTED |
| Sl No | Description | Qty | Unit | Anil Kumar Gupta L2 | HARISH SALES CORPORATION L3 | M/S MATLOOB AHMED L4 | Baba Engineers and Contractors L1 |
|---|---|---|---|---|---|---|---|
| .01Note :The unit rate quoted by the tenderer under Col No (13) of Sch `A’ (BOQ) unless specifically mentioned otherwise such as labour only/fixing only, for all items of works shall be deemed to be including cost of all materials, labour, tools and plants, testing and commissioning of work in position complete as required for entire completion of work. | |||||||
| 1.00 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in soft/loosec soil including removing excavated soil to a distance exceeding 250 metre but not exceeding 500 metre and depositing where directed at a level not exceeding 1.50 meter above the starting point , complete all as specified and directed by Engineer-in-Charge. | 318 | SQUARE METRE | 40 ₹12,720 Lowest | 50 ₹15,900 | 50 ₹15,900 | 200 ₹63,600 |
| 2.00 | Excavating in trenches in Hard/dense soil , not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out, complete all as specified and directed by Engrineer-in-Charge. | 88 | CUBIC METRE | 400 ₹35,200 | 300 ₹26,400 | 300 ₹26,400 | 250 ₹22,000 Lowest |
| 3.00 | Excavating in trenches in Hard/dense soil , not exceeding 1.5 m wide and exceeding 1.5 m but not exceeding 3.00 m depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out, complete all as specified and directed by Engrineer-in-Charge. | 2 | CUBIC METRE | 500 ₹1,000 | 600 ₹1,200 | 300 ₹600 Lowest | 450 ₹900 |
| 4.00 | Excavating over areas, not exceeding 1.5 m deep and getting out in soft/loosec soil , complete all as specified and directed by Engineer-in-Charge. | 46 | CUBIC METRE | 400 ₹18,400 | 300 ₹13,800 | 300 ₹13,800 | 200 ₹9,200 Lowest |
| 5.00 | Excavating over areas, exceeding 1.5 m but not exceeding 3.00 m deep and getting out in soft/loosec soil , complete all as specified and directed by Engineer-in-Charge. | 14 | CUBIC METRE | 500 ₹7,000 | 600 ₹8,400 | 200 ₹2,800 Lowest | 300 ₹4,200 |
| 6.00 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25cm thick each, excavated soil in trenches after the cables have been laid and tested, complete all as specified and directed by Engineer-in-Charge. | 91 | CUBIC METRE | 100 ₹9,100 | 90 ₹8,190 Lowest | 100 ₹9,100 | 200 ₹18,200 |
| 7.00 | Removing excavated soil to a distance not exceeding 50 metre and depositing where directed at a level not exceeding 1.50 meter above the starting point , complete all as specified and directed by Engineer-in-Charge. | 59 | CUBIC METRE | 100 ₹5,900 Lowest | 150 ₹8,850 | 200 ₹11,800 | 250 ₹14,750 |
| 8.00 | Treating the bottom and sides of excavation at the rate of 5 litres of emulsion per square metre of surface area , complete all as specified and directed by Engineer-in-Charge. | 155 | SQUARE METRE | 20 ₹3,100 Lowest | 120 ₹18,600 | 200 ₹31,000 | 100 ₹15,500 |
| 9.00 | Treating the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface (Area of the substructure in contact with backfill to be measured) , complete all as specified and directed by Engineer-in-Charge. | 73 | SQUARE METRE | 60 ₹4,380 Lowest | 150 ₹10,950 | 300 ₹21,900 | 120 ₹8,760 |
Tender Value
₹44.5 L
EMD Value
₹88,980
Closing Date
13 Jun 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF Chandigarh
GE AF Chandigarh, Air Force Station Chandigarh-160003
PROVN OF CAPITAL WORK AT AF STN CHANDIGARH UNDER GE (AF) CHANDIGRAH.
2025_MES_701855_2
GE(AF)/CHD/T-61/2024-25
Open Tender
Civil Works
Item Rate
183 days
Chandigarh
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE AF Chandigarh
₹88,980
Yes
25 Oct 2025
24 May 2025
20 Jun 2025
24 May 2025
13 Jun 2025
30 May 2025
24 May 2025 - 27 May 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .