Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC | ₹20.2 L | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹20.2 L+₹206 (0.01%)Rejected-AOC II 234 SURIYANUR MALLIKUNDAM PO METTUR SALEM TAMIL NADU 636458 | SALEM | TAMIL NADU | 636458 | ₹20.2 L+₹206 (0.01%) | L2 | Rejected-AOC Highest Rate - Rejected |
| Sl No | Description | Qty | Unit | MCM AGENCY L1 | SRM & Co L2 |
|---|---|---|---|---|---|
| 1.00STRENGTHENING THE ROAD AT SEAVAPPAN KADU H/o DHINAPATTI Village panchayat at kolathur | |||||
| 2.00 | Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. | 464.4 | m2 | 6.3 ₹2,926 Lowest | 6.35 ₹2,949 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m | 387 | m2 | 23.3 ₹9,018 Lowest | 23.35 ₹9,037 |
| 4.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. | 52.24 | m3 | 341 ₹17,814 Lowest | 341.07 ₹17,818 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 145.12 | m3 | 2,692.2 ₹3,90,693 Lowest | 2,692.21 ₹3,90,694 |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,161 | m2 | 83.8 ₹97,292 Lowest | 83.84 ₹97,339 |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,161 | m2 | 19.3 ₹22,408 Lowest | 19.37 ₹22,489 |
| 8.00 | Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 29.02 | m3 | 11,270.3 ₹3,27,065 Lowest | 11,270.31 ₹3,27,065 Lowest |
| 9.00 | Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level,uniform and free from streaks and holes etc complete as per MORT&H specification No.803 | 80.8 | m2 | 890 ₹71,912 Lowest | 890 ₹71,912 Lowest |
| 10.00Provision for Retaining wall as per sub estimate @ Km 0/0 - 0/450 | |||||
Tender Value
Refer Docs
EMD Value
₹20,250
Closing Date
28 Nov 2025, 3:00 pmClosed
BDO BP KOLATHUR
BDO BP KOLATHUR, BDO OFFICE KOLATHUR
STRENGTHING THE ROAD AT SEAVAPPAN KADU H/O DHINNAPATTI VILLAGE PANCHAYAT IN KOLATHUR BLOCK
2025_RDTN_625814_1
1602/2025/A2
Open Tender
Civil Works - Roads
Item Wise
90 days
BDO OFFICE KOLATHUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,250
28 Nov 2025
22 Nov 2025
28 Nov 2025
22 Nov 2025
28 Nov 2025
22 Nov 2025
Amount
STRENGTHENING THE ROAD AT SEAVAPPAN KADU H/o DHINAPATTI Village panchayat at kolathur
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level,uniform and free from streaks and holes etc complete as per MORT&H specification No.803
Provision for Retaining wall as per sub estimate @ Km 0/0 - 0/450
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc..
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
provision for Wheepholes 110mm dia PVC Pipe
Provision for Hard bed @ 73m
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, etc complete per SS 20 B.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc..
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Provision for Bitumen pad
Provision for Hecta Metre Stone - Nos
Provision for Cautionary Sign board charges (60cm equilateral triangle)
Provision for Name Board including erection charges and painting
Provision for LWF 1 % (Type 17010)
Provision for Photographic charges
SRM & Co (BID ID -1519974)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
dhinnapatti.pdf
Tender Documents • 0.89 MB
Additional.pdf
Additional Documents • 0.42 MB
BOQ_748346.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .