| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC 62 BALSAMAND ROAD HISAR 125001 | HISAR | HARYANA | 125001 | ₹3.0 Cr Quoted ₹3.1 Cr | L1 | Accepted-AOC ok |
| 2 | Rejected-Technical JUI ROAD VILLAGE DULHERI TEHSIL TOSHAM DISTT BHIWANI 127040 | BHIWANI | BHIWANI | HARYANA | 127040 | - | - | Rejected-Technical Work experience not Qualification Criteria |
| 3 | Rejected-Technical | - | - | Rejected-Technical Work experience not Qualification Criteria |
Tender Value
₹2.5 Cr
EMD Value
₹4.9 L
Closing Date
5 Apr 2023, 3:00 pmClosed
ARUN MUNJAL
CAD Division Rohtak
RD 15120-R Katwara Mr. Canal Based Micro Irrigation System with the help of construction of water tank, underground feeder line, HDPE pipeline and solar power integrated MI system in the available field which is situated nearest to the outlet
2023_HBC_270089_1
20239C9F51F5 F1A6 4642 B651 0D601E085F3C1602CAD
Open Tender
Civil Works
Works
500 days
KATWARA
3 documents required · 3 mandatory
₹15,000
₹4.9 L
Yes
MICAD Division, Rohtak
7 Jun 2023
31 Mar 2023
6 Apr 2023
31 Mar 2023
5 Apr 2023
31 Mar 2023
3 Apr 2023
Amount
Providing, laying, aligning, and jointing with butt fusion welding techniques (IS 7634 (Part 2) : 2012) at all level/ depths ISI marked PE pipe of PE-80 grade and PN - as per design for portable water supply as per IS 4984-2016 (amended up to date) in trenches in complete, including cost of PE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. a) PE80 PN6 pipe 140mm dia As Per Design 1411.59/-
Providing, laying, aligning, and jointing with butt fusion welding techniques (IS 7634 (Part 2) : 2012) at all level/ depths ISI marked PE pipe of PE-80 grade and PN - as per design for portable water supply as per IS 4984-2016 (amended up to date) in trenches in complete, including cost of PE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. b) PE80 PN6 pipe 160mm dia As Per Design 1831.92/-
Horizontal directional drilling with micro tunnelling methods, for pipe laying under pucca rasta /road crossing( Rates approved in TAC,MICADA Haryana meeting on 09.02.2022)
Supply and carriage of PVC 250 mm dia end cap
Providing and fixing Tank Type (Make of Metal) Fertilizer and Chemical Injector System confirming to IS 14483 (Part 3) of 2018 for demonstration and guiding the farmers regarding fertilization and chemicalisation of system. (rates include ventury with manifold 1.0`=1300 and 60 liter fertilizer tank= 4400 ) Rates approved vide memo No.MICADA/2021/3068-70 dated 07.06.2021
Providing, fixing,testing and commissioning of pressure gauge 2` dial with Glycerin filled to be fixed before and after filtration unit ( Rates approved in TAC,MICADA Haryana meeting on 09.02.2022)
Providing fixing of Header Assembly/Manifold 3` (loose) Rates approved vide memo No.MICADA/2021/3068-70 dated 07.06.2021
Supply Installation testing commissioning of Solar Photovoltaic Stand alone Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline silicon solar cells, necessary protections, earthling, mounted on Aluminum/GI structure of suitable strength. Note PV modules used must qualify to the latest edition of IEC PV module qualification test or equivalent BIS standards Mono Crystalline Silicon Solar cell Modules IEC 61215/IS14286. In addition, the modules must conform to IEC 61730 Part-1 requirements for construction and Part 2 – requirement for testing for safe qualification equivalent IS and be mounted on fixed Aluminum/GI specification. Inculding field-based electroluminescence (EL) study be performed after receiving the modules at site and after installation, Module Mounting Structure (MMS) design and drawing shall be duly vetted from govt. institute including third party inspection. Actual parameters/capacity will be finalized (N.S. Item ) 55000 plus 18%GST=64900/- (copy attached)
Construction of control room/regulation cum watch and ward hut as per approved design and drawing including water supply, Sanitary fittings, electric fittings, septic tank and other items as required etc (Roof covered area 20` X 20.75`) As per approved design and drawing.
Complete operation and watch and ward of the project 1 plus 3 year including operation of pump house, pipe line and accessories, electromechanical solar plants complete in all respect (per year per hactare).
Complete Maintenance of pump house, pipe line and accessories, electromechanical solar plants complete in all respect (36 months) @ 0.5% per year of total amount excluding earth work.
Bore well cum tube well:- Boring/drilling bore well of 200 mm diameter for casing, Supplying, assembling, lowering and fixing in vertical position in bore well, Unplasticised PVC medium well casing (CM) 200 mm dia pipe, uPVC medium well screen (RMS) pipes with ribs, conforming to IS: 12818, Including Supply, testing and lowering of ISI marked all welded stainless steel screen (SS304) cage Type V-wire Wound Screens in bore wells conforming to IS:8110, Providing. Lowering and fixing of 20 HP three Phase 50 Hz=3% rated motor frequency, 415V=3% rated motor voltage, 110mm dia UPVC Column pipe for delivery, with submersible Copper Cable 3 core 16 sqmm as required optional item where extra water available during any season.
Providing and fixing of 4`x5` Iron sheet board welded with 2` dia iron pipe having height of 5 feet anchored in concrete block 6`x6`x1.5` in ground duly painted and writing the site details.
Preparation and Implementation of wrabandi of the complete chak and identification of tranning needs of the farmers, preparation of trainning modules on various subjects concerning operation and maintenance of the MI systems, Solar array and pumping systems and cropping pattenrn etc. and providing necessary training to the farmers as per the identified needs Necessary training shall be provided to the wua members and the staff identified by the Engineer also for all activities involved in the OandM of the complete MI System including.
Construction of Desiting chamber including baffle walls to break the velocity of water to setteled down the heavier silt particles as per design and drawing Optinal item where heavy silt exists in water i.e Yammuna Water
Supply and Erection of Alfa Valve.
Supply and carriage of PVC pipe 10” dia for nakka for hodi Partition wall.
Galvanized steel wire helical wound and interwoven continuous mesh without knots or ties having opening size 7.5*7.5 cm and 3.15 mm dia wire, 2.2 meter height of mesh, with 2.8 meter ht of MS Angle 50*50*5 mm supports fixing at spacing of 3 meter centre to centre, supports with MS Flat 35*5 mm. Fencing supported with MS Angle 35*35*5 at bottom. The M.S Angle supports shall be anchored in cement concrete (1:3:6) blocks 45*45*60 cm additional barbed wire fencing shall be provided at the top of mesh, fencing including gate @ 2760/- per meter.
Hydrant assembly for Nakka in field, Rates including Tee, riser pipe, butterfly valve, Flange and labour for fixing butter fly valve should be as per IS 13095-2020 (Rates are as per analysis including HSR item 25.3.6) as per approved rate of 5843 per no.
Survey, Planning,design drawing and hydro-analysis of the complete piping system pumping units and solar plant to check adequency of the copmplete MI Infrasturcture and vetting. It form the Government insitute since estimated quantities are based on the tentative design parameter. (Calculation based on @ 1 % of total cost of estimate)
Supply and Installation of valve regulated solar batteries as per IS 16270:2014 (reaffirmed 2019) have autonomy time 15 days
Providing and fixing of three phase 50HZ plus 3% rated motor frequency, 415C = 3% rated motor voltage, with constant motor fluux control, (Sumersible motors shall conform to all the requirenments of IS 9283) Solar A.C. Agriculture Pumps along with Universal Solar Pump Controller (UPSC) all external part of motor used in open well submersible pump having casing os Alloy steel confirming to IS 3444 Including fixing PVC insulated polymer sheathed 3 crore flat type cabling in conduit, required from solar plant to solar pump through control room required to connect, including cost of and as per IS code 14220-2018 including third pary inspection. Average discharge 13LPS/Head 52 meter/ minimum output rating of 15 KW duly installed on the suitable foundation. (NS Item @ 57848 each for controller IP-54, HP 20, AC- Copy Attached). 57848x1.1(adding agency rofit)=63632.80x4=254531.20/- (for 80 HP) Actual pump set`s parameters will be finalized agter approval of design and drawing. Supplying, erection,testing and commisioning of motor pumping set for head 45.0m as per make: KSB/Kirloskar/CRI/Lubi/Crompton Grieve (NS Item)(HSR Item No. 20.122.13) @ Rs. 212534/- per 20 HP may very as per design requirenment for site. 4 Pumps 20 HP cost@212534x4=850136. Total cost HP = 1104667.20 i.e rate per HP= 14350 approved by HO
Providing, laying, aligning, and jointing with butt fusion welding techniques (IS 7634 (Part 2) : 2012) at all level/ depths ISI marked PE pipe of PE-80 grade and PN - as per design for portable water supply as per IS 4984-2016 (amended up to date) in trenches in complete, including cost of PE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. c) PE80 PN6 pipe 180mm dia As Per approved rate 1272/-
Bidder Name
Amount
Krishan Kumar contractor(GSTN-06AXBPK5232G1ZT)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .