Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹26.4 L+₹20,667.78 (0.79%)Accepted-Finance | L2 | Accepted-Finance Acceted |
Tender Value
₹27.6 L
EMD Value
₹55,114
Closing Date
21 May 2026, 3:00 pmClosed
Executive Engineer (E)
O/o EE (E), HPED, PWD, Yamuna Western Bank, Lok Nayak Setu, ITO, New Delhi-02
RMO of E and M Service installed at 100 bedded LBS Hospital Khichripur Delhi SH SITC of various ceiling duct mounted Air Decontamination system at LBSH
2026_PWD_291233_3
06/EE(E)/HPED/PWD/2026-27
Open Tender
Electrical Works
Percentage
15 days
Lal Bahadur Shastri Hospital, Khichripur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹55,114
Yes
30 May 2026
15 May 2026
21 May 2026
15 May 2026
21 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, installation & commissioning of air conditioning duct mounted air decontamination unit workable on ACDM Technology (Air conditioning duct mounted) to destroy air borne microorganisms at virus organic all other air borne microorganism, having following features: ACDM improves air quality. Bring down the microbial count & the dust particle count, bring down the VOC, increase the efficiency of cooling coil & reduce power consumption can be incorporated into an existing AHU with following specifications:
a) 4 PCL Generators for reducing the particulate count.
b) 4 UVGI system for microbial load reduction.
c) 2 Nano TiO2 Filters for VOC and microbial load reduction.
d) Integrated monitoring panel should be provided.
e) Monitoring panel should be installed in the AHU room or control room.
f) Visual indicator should be there on the monitoring panel about status of UVGI working time.
g) Visual indicator of system working time should be displayed on the monitoring panel.
h) Each system should be capable of handling up to 5000 CFM air flow. The manufacture should be a quality manufacture having ISO 9001-2008, ISO 14001-2004, ISO 13485-2012, WHO GMP /GPP certifications. The product should be European CE or US FDA/EPA approved. | 1 | No. | 3,42,335 | ₹3,42,335 |
| 2 | SITC of ceiling mounted, Wall Mounted and Floor Mounted decontamination system with pre-filter, Oily Vapour Repellent, ESP Filter, anmicrobial coated Hepa filter, ac vated carbon filter, Tio2 Filter, Plasma ionizer and UV lights to destroy air borne microorganisms and improve air quality with Nine stage purifica on for 350 sq. ft area having airflow minimum 1650 m3 per hour and CADR(Clean Air delivery Rate) of minimum 1250 m3 per hour that keeps indoor air free from dust (PM 2.5 & PM 10), gases pollutant, smoke, Bad Odor forming compounds, Oily Vapours, allergens and air borne infectants. | 7 | Nos. | 3,44,767 | ₹24,13,369 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.07 MB
BOQ_386751.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .