| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.6 LAccepted-AOC | ₹27.6 L | L1 | Accepted-AOC LER |
| 2 | L2₹27.6 LRejected-Finance | ₹27.6 L | L2 | Rejected-Finance ABOVE RATE QUOTED |
| Sl No | Description | Qty | Unit | G K Constructions L2 | SESHA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Part I : Rejuvenation of Aayakuttai with Desilting construction of inlet and Bathing Ghat Lining Wall @ Madalambadi Panchayat. | |||||
| 1.01 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan | 90 | Cu.m | 44 ₹3,960 | 44 ₹3,960 |
| 1.02 | Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc. | 3,111.6 | Cu.m | 52 ₹1.6 L | 52 ₹1.6 L |
| 1.03Provision for Bathing Ghat | |||||
| 1.04 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 6.08 | Cu.m | 224 ₹1,361.92 | 224 ₹1,361.92 |
| 1.05 | C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. | 3.21 | Cu.m | 5,029 ₹16,143.09 | 5,029 ₹16,143.09 |
| 1.06 | C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete | 6.78 | Cu.m | 5,357 ₹36,320.46 | 5,357 ₹36,320.46 |
| 1.07 | Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete | 30.9 | Sq.m | 476 ₹14,708.40 | 476 ₹14,708.40 |
| 1.08Provision for In let | |||||
| 1.09 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 17.7 | Cu.m | 224 ₹3,964.80 | 224 ₹3,964.80 |
Tender Value
₹27.9 L
EMD Value
₹28,000
Closing Date
7 Aug 2023, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (V.PT) THURINJAPURAM
BLOCK DEVELOPMENT OFFICE THURINJAPURAM
Providing Infrastructure Development works to AGAMT 2023-24 Village Panchayat at Madalambadi Panchayat of 05.08.2023 Thurinjapuram Block in Package No. TPRM/2023-24/19 Tiruvannamalai District.
2023_RDTN_344564_2
Roc.No. 2845/2023/A13-1 DT22.06.2023_19
Open Tender
Civil Works
180 days
THURINJAPURAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹28,000
4 Mar 2026
31 Jul 2023
7 Aug 2023
31 Jul 2023
7 Aug 2023
31 Jul 2023
Amount
Part I : Rejuvenation of Aayakuttai with Desilting construction of inlet and Bathing Ghat Lining Wall @ Madalambadi Panchayat.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Provision for Bathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for In let
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Plain Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Baby Pond Lining wall
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Provision for Name Board
Part II : Providing CC Pavement in Pachaiyappan Nagar @ Madalambadi Panchayat (150m)
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, conso
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened
Plain Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Provision for Bitumen Pad (12mm thick) including cost & conveyance etc,.
Provision for name board charges
Part III : Providing CC Pavement in Anganwadi Street @ Madalambadi Panchayat (100.50m)
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, conso
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened
Plain Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Provision for Bitumen Pad (12mm thick) including cost & conveyance etc,.
Provision for name board charges
Part IV : Construction of Threshing Floor in Aandakulam @ Madalambadi Panchayat. (15mX15m)
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Cement Concrete 1:3:6 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plance surfaces in all floors with all cross bracings using mild steel of size 90cm. X 60 cm. and 10 gauge stiffened, welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joist of size 10cm. x 6.5 cm. dia spaced about 90 cm. center to center and supported by casuarinas props of 10 cm. to 13 cm. dia spaced at 75 cm. center to center etc., complete coplying with standard specification ans as directed for the following items.
Cement Concrete 1:2:4 mix using 20 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Providing name board including lettering
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G K Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid