Tender Value
₹27.7 L
EMD Value
₹27,700
Closing Date
11 Aug 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, KARANJIA
Construction of F Type quarter at Rw Sub Division Karanjia in the District of Mayurbhanj for the year 2025-26-Building
2026_CERWI_138066_1
RWDKNJ-12/2026-27
Open Tender
Civil Works - Buildings
Percentage
120 days
Karanjia
RC, GSTIN, PAN, all Affidavits as per DTCN
2 documents required · 2 mandatory
₹6,000
₹27,700
Yes
5 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
5 Aug 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of the foundation including cost of all labour required for the work etc. complete with all other T &P required for the work and stacking the excavated materials away from the working area as directed by the Engineer-in-Charge including 1% Cess. | 86.76 | Cum | 282.89 | ₹24,543.54 |
| 2 | Supplying and filling foundation and plinth with sand well watered & rammed with cost, conveyance, royalty and taxes of all materials labour required for the work as per specification and direction of the Engineer-in-Charge including royalty of materials including 1% Cess. | 56.75 | Cum | 764.75 | ₹43,399.56 |
| 3 | Providing and laying P.C.C (1:3:6) with 40 mm size Hand broken hard granite metal of approved quality from approved quarry including hoisting lowering & laying concrete in layers not exceeding 9" thick to the required level including cost,conveyance & royalty of all materials with all taxes & compacting watering curing & all labour with T & P articles required for the work including 1% cess etc, complete as per specification and direction of the Engineer-in-charge. | 9.09 | Cum | 6,113.55 | ₹55,572.17 |
| 4 | R.C.C. M-25 having a minimum compressive strength(in work test) 200 Kg/cm.2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with I.S. 456 and I.S.516 using 20mm & down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering laying and compacting concrete, watering and curing for 28days centering, shuttering, finishing the exposed surfacs inculding ceiling, smooth, providing grooves beads where necessary and providing, required No of fan Hooks as directed including, cost, conveyance, royalities and taxes of all materials and cost, of all labour and T & P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-Charge but excluding the cost of M.S.Rods or Tor steel and binding wire and labour charges for bending, binding and tying grills.
a) Column Base
Ground Floor | 15.49 | Cum | 6,935.52 | ₹1,07,431.2 |
| 5 | b) Column & Beam (Res)
Ground Floor | 7.37 | Cum | 19,521.02 | ₹1,43,869.92 |
| 6 | First floor | 6.39 | Cum | 22,241.46 | ₹1,42,122.93 |
| 7 | 2nd floor | 2.39 | Cum | 25,499.73 | ₹61,059.1 |
| 8 | d) Plinth Band
Ground Floor | 5.72 | Cum | 6,935.52 | ₹39,671.17 |
| 9 | e) Lintel Band
First floor | 1.84 | Cum | 16,713.51 | ₹30,752.86 |
| 10 | 2nd floor | 0.57 | Cum | 18,866.09 | ₹10,748.95 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 13.55 MB
Tendernotice_1.pdf
PDF • 3.93 MB
BOQ_604857.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .