Loading…
Loading…
Tender Value
₹7.4 L
EMD Value
₹15,000
Closing Date
3 Aug 2026, 6:00 pmClosed
Head Administration For Indian Institute of Manage
INDIAN INSTITUTE OF MANAGEMENT LUCKNOW - NOIDA CAMPUS Plot No. B-1, Sector-62 Institutional Area Noida-201307 (U.P.)
REPLASTERING WORK OF BACK SIDE BOUNDARY WALL AT IIM LUCKNOW NOIDA CAMPUS
2026_IIML_916933_1
IIML-NC/ESTATE/TENDER/2026-27/ 09
Open Tender
Civil Works
Percentage
IIM Lucknow Noida Campus
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
Yes
IIM Lucknow Noida Campus
30 Jul 2026
11 Jul 2026
5 Aug 2026
11 Jul 2026
3 Aug 2026
11 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Replastering of Boundary wall ( back Side ) at IIM Lucknow Noida Campus | |||||
| 1.01 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
DSR 2023 Code: 15.56 | - | Sqm | 54.65 | - |
| 1.02 | 15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand) sqm
DSR 2023 Code: 15.56 | - | Sqm | 411.75 | - |
| 1.03 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect. SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer sqm
DSR 2023 Code: 13.5.1 | - | Sqm | 141.2 | - |
| 1.04 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | - | cum | 2,060.2 | - |
| 2CARRIAGE OF MATERIALS | |||||
| 2.01 | By Mechanical Transport including loading,unloading and stacking Lime, moorum, building rubbish 3km | - | cum | 219.03 | - |
| 3 | Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers. | - | per bag of 50kg cement used in the mix | 22.1 | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 1.40 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_963640.xls
BOQ • 0.24 MB
boundaryf.pdf
Tender Documents • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .