| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.9 LAccepted-AOC 44 AMAR NIWAS CIVIL LINES PRATAPGARH UTTAR PRADESH | PRATAPGARH | PRATAPGARH | UTTAR PRADESH | ₹67.9 L | L1 | Accepted-AOC BOND |
| 2 | L2₹69.4 LRejected-Finance NONE | ₹69.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹72.9 LRejected-Finance | ₹72.9 L | L3 | Rejected-Finance L3 |
| 4 | L4₹78.0 LRejected-Finance SENANI NAGAR BELHA PRATAPGARH | PRATAPGARH | PRATAPGARH | UTTAR PRADESH | ₹78.0 L | L4 | Rejected-Finance L4 |
Tender Value
₹1.2 Cr
EMD Value
₹8.2 L
Closing Date
23 Mar 2026, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Construction of Mishrapur taraul nahar ke pool se madhupur sampark with 300 mtr. CC marg in FY 2025-26 (with five years maintenance as per attached SOP) under RSN-5054 Yojna (2)
2026_CEALD_1126347_2
1011/93C-ETENDERING/PFC/2026 DT. 28.02.2026
Open Tender
Civil Works
365 days
PRATAPGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹8.2 L
Pratapgarh Circle, PWD, Pratapgarh
3 Jun 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
21 Mar 2026
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m and lead upto 30 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300-2 as per technical specification clause 301.5.but excluding GST
Construction of granular sub-base grading-I by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MORD specification clause 401.including labour cess, royality.but excluding GST
Providing, laying, spreading and compacting stone aggregates of 63-45 mm sizes to water bound macadam G-2 specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 80-100 KN in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density for Grading 2 as per MORD Specification No. 405.including labour cess, royality .but excluding GST
Providing, laying, spreading and compacting stone aggregates of 53.22.4 mm sizes to water bound macadam G-3 specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 80-100 KN in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density for Grading 3 as per MORD Specification No. 405(3).including labour cess, royality. but excluding GST
Brick edging on both sides of the road of first brick class M-150. 8 cm wide and 12 cm deep laid with mud mortar including labour & supply of bricks finished to required template and in proper alignment and also including dressing & ramming the excavated earth as directed by the engineer-in charge of the work including material, labour and T & P etc for Proper completion of the work.including labour cess, royality. but excluding GST
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.as per MORD Sepcification 502.including labour cess,.but excluding GST
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.as per MORD Sepcification 503.including cost of all material & labour cess,.but excluding GST
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 80-100 KN capacity, finished to required level and grades to followed by seal coat.as per MORD Sepcification 508.including cost of all material & labour cess.but excluding GST
Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .including cost of all materails labour etc as per MORD Sepcification 510.including cost of all material & labour cess, royality. but excluding GST
Earth work in making patries on either side of the road in ordinary soil. to be done in 20 cm layer including ramming and dressing the surface to required levels and true to the patri template with side slopes,excluding royality. (excluding hire roller chargess).including labour cess.but excluding GST
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved; curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501..including labour cess.but excluding GST
Construction of NP-3 hume pipe culvert
Earth work in excavation in foundation trenches or drains (not exccding 1.5 m. in width or 10sqm.on plan) includingg getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 30m.including labour cess.but excluding GST
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MORD specifiaction no.802, 803, 1202 i/c suppy of all materials, labour T&P etc. for proper completion of work as per direction of E/I including labour cess, royality.but excluding GST
Providing and laying 40 mm gauge brick ballast below pipe and in sides for proper completion of work as per direction of E/I.including labour cess, royality.but excluding GST
Providing and Laying Relnforced Cement Concrete hume Plpe NP3 350 mm dia as per design. Providing and Laying Relnforced Cement Concrete Plpe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement morter 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per clause 1106.including labour cess, royality.but excluding GST
Providing and Laying Relnforced Cement Concrete hume Plpe NP3 600 mm dia as per design . Providing and Laying Relnforced Cement Concrete Plpe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement morter 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per clause 1106.including labour cess, royality.but excluding GST
Class 150 Brick masonry work cement mortar 1:3 in foundation complete excluding pointing and plaster as per drawing and Technical specification for proper completion of work as per direction of E/I including cost of all materails labour etc.including labour cess, royality.but excluding GST
Pointing with cement mortar (1:4 ) on brick work in substructure as per Technical Specifications -600.including cost of all materails labour etc.including labour cess, royality.but excluding GST
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications for proper completion of work as per direction of E/I including cost of all materails labour etc .including labour cess, royality .but excluding GST
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_2100379.xls
BOQ • 0.31 MB
T2_2.pdf
Tender Documents • 5.55 MB