Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance PALIKADAI PANANKTTAUR POST OMALUR TALUK SALEM DISTRICT 636455 | OMALUR | SALEM | TAMIL NADU | 636455 | Admitted-Finance |
Tender Value
₹13.2 L
EMD Value
₹27,000
Closing Date
14 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer (BP)
Panamarathupatti
Salem Dt Panamarathupatti Block Construction of Public Distribution Shop in near Uthukulikadu Vinayakar kovil. H/O A.Kondalampatti - 6
2023_RDTN_393731_1
2647/2023/A5
Open Tender
Civil Works - Buildings
Item Wise
120 days
Panamarathupatti
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹27,000
24 Jan 2024
28 Nov 2023
14 Dec 2023
28 Nov 2023
14 Dec 2023
28 Nov 2023
Amount
Construction of Public Distribution Shop in near Uthukulikadu Vinayakar kovil. H/O A.Kondalampatti
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 A.
Cement Concrete 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete
Refilling with excavated earth in to foundation & basement complying with standard specifications including all labour charges etc. complete.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
RCC 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all charges etc., complete. Side Centering
Column Centering
Slab Centering
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications
Granolethic floor finish with cement concrete 1:2:4 mix using 10-12mm ISS chips including cost and conveyance of all materials and all labourcharges etc, complete.
Supplying and fixing of new Steel Rolling Shutterwith all accessories including etc., complete
Supplying and fixing of new Steel window (1.20x1.30m) with all accessories including etc., complete
Supplying and fixing of new Steel Ventilator with all accessories including etc., complete
Supplying and fixing of new Steel Countar with all accessories including etc., complete
Supplying and fixing of new Steel Door with all accessories including etc., complete
RCC Jolly
Labour charges for Fixing Steel Doors
Labour charges for Fixing Steel Windows
Distempering two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications
Exterior emulsion two coats using best freshly burnt shell lime in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete
Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PAS AND Co
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .