Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹12.0 L+₹56,652.50 (4.96%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹12.5 L+₹1.1 L (9.49%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹12.5 L+₹1.1 L (9.59%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹14.5 L+₹3.0 L (26.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sri Prakash Shukla L3 | M/S DEVENDRA RAI L1 | M/S RAMESH RAI L5 | SANJAY THAKUR CONTRACTOR L4 | dhananjay tiwari L2 | abhijit enter prises L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SILT CLEARANCE OF MADHURIYA DY KM 0.000 TO KM 15.200. | |||||||||
| 1.01 | Silt clearance/trench digging including lift upto 1.5m and lead upto 30m, including cost of driver/assistant driver, POL, maintencance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction.by hydraulic excavator equivalent capacity 25.00 cum / hours | 27,746 | Cum | 41 ₹11,37,586 | 38 ₹10,54,348 Lowest | 48 ₹13,31,808 | 41.04 ₹11,38,695.84 | 39 ₹10,82,094 | 52 ₹14,42,792 |
| 2.00SCRAPING OF BED, INNER SIDE SLOPE OF MADHURIYA MR KM 15.200 TO KM 20.715 | |||||||||
| 2.01 | Bed, inner side slope scraping of channel including desilting etc complete. | 38,542 | Sqm | 2.9 ₹1,11,771.8 | 2.25 ₹86,719.5 Lowest | 2.95 ₹1,13,698.9 | 2.9 ₹1,11,771.8 | 3 ₹1,15,626 | 3.6 ₹1,38,751.2 |
Tender Value
₹16.4 L
EMD Value
₹33,000
Closing Date
9 Oct 2026, 12:00 pmClosed
Executive Engineer
Irrigation Division-2, Kushinagar
Silt clearance of Madhuriya Dy. from km 0.000 to km 15.200, along with scrapping work from km 15.200 to km 20.715
2026_UPIDC_1191373_27
06/EE/ID2K/Tender/2026-27
Open Tender
Civil Works - Canal
Item Rate
Irrigation Division-2, Kushinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹33,000
Yes
17 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SILT CLEARANCE OF MADHURIYA DY KM 0.000 TO KM 15.200. | |||||
| 1.01 | Silt clearance/trench digging including lift upto 1.5m and lead upto 30m, including cost of driver/assistant driver, POL, maintencance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction.by hydraulic excavator equivalent capacity 25.00 cum / hours | 27,746 | Cum | - | - |
| 2SCRAPING OF BED, INNER SIDE SLOPE OF MADHURIYA MR KM 15.200 TO KM 20.715 | |||||
| 2.01 | Bed, inner side slope scraping of channel including desilting etc complete. | 38,542 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
NIT1434.pdf
Tender Documents • 1.30 MB
BOQ_2247360.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .