| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.2 LAccepted-AOC 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹83.2 L Quoted ₹70.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹85.8 LRejected-AOC | ₹85.8 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/s. KSR Enterprises L2 | PREETHI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | MS Plate 6 mm Thick IS 2062, Grade-B including loading, transportation & unloading per MT. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge. The materials will be supplied by TNPGCL if available at stores during execution of works) | 15 | MT | 92,400 ₹13.9 L | 84,000 ₹12.6 L |
| 2.00 | MS Channel: 100 X 50 MM including loading, transportation & unloading. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge. The materials will be supplied by TNPGCL if available at stores during execution of works) | 3 | MT | 77,000 ₹2.3 L | 70,000 ₹2.1 L |
| 3.00 | MS Channel: 125 X 65 mm including loading, transportation & unloading. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge. The materials will be supplied by TNPGCL if available at stores during execution of works) | 1.5 | MT | 77,000 ₹1.2 L | 70,000 ₹1.1 L |
| 4.00 | MS Channel: 200 X 75 mm including loading, transportation & unloading. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge. The materials will be supplied by TNPGCL if available at stores during execution of works) | 1.5 | MT | 77,000 ₹1.2 L | 70,000 ₹1.1 L |
| 5.00 | MS Angle: 75 X 75 X 8 MM including loading, transportation & unloading. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge. The materials will be supplied by TNPGCL if available at stores during execution of works) | 5 | MT | 64,300 ₹3.2 L | 58,500 ₹2.9 L |
| 6.00 | Metallic expansion bellow - Style I | 2 | Nos | 66,000 ₹1.3 L | 57,000 ₹1.1 L |
| 7.00 | Metallic expansion bellow - Style II | 3 | Nos | 93,100 ₹2.8 L | 80,500 ₹2.4 L |
| 8.00 | Metallic expansion bellow - Style VI | 2 | Nos | 1,14,400 ₹2.3 L | 98,800 ₹2.0 L |
| 9.00 | Charges for scaffolding, including scaffolding material consumable and T&P's | 420 | M² | 250 ₹1.1 L | 190 ₹79,800 |
| 10.00 | Complete dismantling of damaged portion of hot air duct. This work involves marking, cutting, Hot air duct, inspection doors, seal air duct joint & cold air duct joint leading & lifting as per direction of site Engineer, including cost of special electrodes the consumables, loading, transporting charges, Hire charges for crane, winch, T&P's, devoluting the retrieved scraps. | 20 | MT | 25,500 ₹5.1 L | 21,900 ₹4.4 L |
Tender Value
Refer Docs
EMD Value
₹84,100
Closing Date
3 Apr 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI Circle COH 25 26 MPM Dn Unit I Dismantling the existing worn out damaged hot air duct and fabrication supply of modular hot air duct from main Hot air bus duct to mill end erection testing and commissioning in Unit I Mill 1A 1B
2025_EB_533985_1
CE SE MI NCTPS I 268 24 25
Open Tender
Power/Energy Projects/Products
45 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹84,100
Yes
2 Apr 2026
21 Mar 2025
4 Apr 2025
21 Mar 2025
3 Apr 2025
21 Mar 2025
Amount
MS Plate 6 mm Thick IS 2062, Grade-B including loading, transportation & unloading per MT. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge. The materials will be supplied by TNPGCL if available at stores during execution of works)
MS Channel: 100 X 50 MM including loading, transportation & unloading. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge. The materials will be supplied by TNPGCL if available at stores during execution of works)
MS Channel: 125 X 65 mm including loading, transportation & unloading. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge. The materials will be supplied by TNPGCL if available at stores during execution of works)
MS Channel: 200 X 75 mm including loading, transportation & unloading. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge. The materials will be supplied by TNPGCL if available at stores during execution of works)
MS Angle: 75 X 75 X 8 MM including loading, transportation & unloading. (Supply to the NCTPS stores. The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charge. The materials will be supplied by TNPGCL if available at stores during execution of works)
Metallic expansion bellow - Style I
Metallic expansion bellow - Style II
Metallic expansion bellow - Style VI
Charges for scaffolding, including scaffolding material consumable and T&P's
Complete dismantling of damaged portion of hot air duct. This work involves marking, cutting, Hot air duct, inspection doors, seal air duct joint & cold air duct joint leading & lifting as per direction of site Engineer, including cost of special electrodes the consumables, loading, transporting charges, Hire charges for crane, winch, T&P's, devoluting the retrieved scraps.
Fabrication Hot Air Duct (From Main Hot air Bus to Mill End) above 9 Meter level as per standards and as per the direction of site in charge. Work involves fabrication of duct, venturi, Elbows, transition, bend duct with stiffener channel, corner angles as per drawing including cost of leading lifting, special electrodes, consumables, loading, transporting charges, Hire charges for crane, winch and T&P's.
Erection, testing and commissioning of the duct portion of the hot air duct with stiffeners, field joints and field flange joints, pipe supports with stiffeners; duct supports & arresting supports as per direction of engineer in charge including crane, winch charges consumables and T&P's.
Charges for leading, Lifting and Transportation of Iron and Steel materials from stores to site including hire charges.
Supporting and arresting the Hot Primary Air Ducts-Upstream and downstream of worn-out Expansion Bellow; cutting and removal of worn out Expansion Bellow; Gauging and edge preparation; leading, lifting and erection of new/ reconditioned Expansion Bellow in position; thorough welding and providing cover plate inside the Expansion Bellow with one side welding, including cutting and removal of the existing cover plate; drawl & devolution of materials including the cost of consumables, Special welding electrodes and hire charges for T&P’s.
Overhauling of Hot air damper including cost of consumables and T&P’s.
Charges for dismantling the worn out hot air gate cylinder, shaft aluminium disc, seals top & bottom flanges, renewal of the damaged parts and assembling the all the above to have pucca open/ close operation without assembly leaks, to withstand a pressure of 7kg/cm2 including cost of consumables and T&P’s.
Charges for dismantling and erection of the Hot Air Gate assembly position as per the site Engineer instruction including cost of consumables and T&P’s.
Charges for dismantling and erection of the Hot Air Damper assembly position as per the site Engineer instruction including cost of consumables and T&P’s.
Charges for dismantling, fabrication and re erection of Hanger Assembly above 9 Meter level and as per the direction of site in charge. work involves scaffolding, marking, assembling, complete welding and operation checking including cost of leading lifting, special electrodes, consumables, loading and transporting charges, Hire charges for crane, winch, T&P’s.
Charges for dismantling, fabrication and re erection of Air flow measurement points before venturi and after venturi at above 9 meter level, DP measurement point in mill inlet and additional instrumentation measurement points 5 Nos. as per the direction of site in charge. Work involves scaffolding, marking, assembling, complete welding and operation checking including cost of leading lifting, special electrodes, consumables, loading and transporting charges, Hire charges for T&P’s.
M/s. KSR Enterprises (BID ID -1282136)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_635644.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid