Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.9 LAccepted-AOC B 12 VISHAKARMA JYOTI SUBHASH LANE MALAD E MUMBAI 400097 | MUMBAI SUBURBAN | MAHARASHTRA | 400097 | L1 | Accepted-AOC ACCEPTED BEING LOWEST | |
| 2 | L2₹1.1 Cr+₹24.7 L (27.4%)Rejected-Finance 1ST FLOOR SIDDHI PUJA BUSINESS SQUARE SONY PAITHANI CHOWK NASHIK MAHARASHTRA INDIA PIN 422 002 | NASHIK | MAHARASHTRA | 422002 | L2 | Rejected-Finance Rejected not being L1 | |
| 3 | L3₹1.3 Cr+₹42.4 L (47.2%)Rejected-Finance 201 CHAURANG HEIGHTS CHS PLOT NO 117 SECTOR 13 KHARGHAR NAVI MUMBAI 410210 | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410210 | L3 | Rejected-Finance Rejected not being L1 | |
| 4 | L4₹1.4 Cr+₹47.5 L (52.9%)Rejected-Finance | L4 | Rejected-Finance Rejected not being L1 | |
| 5 | L5₹1.5 Cr+₹59.7 L (66.4%)Rejected-Finance 116 RUNWAL DIAMOND OPP PALACE ORCHARD N I B M UNDRI ROAD MOHAMADWADI PUNE 411 060 | PUNE | PUNE | MAHARASHTRA | 411060 | L5 | Rejected-Finance Rejected not being L1 |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
4 Feb 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COL VIKAS KESARWANI
CWE AF LOHEGAON
RETROFITTING AND STRUCTURAL DEFECT REPAIRS OF CONSTRUCTION OF DEFFICIENT MARRIED ACCN FOR NCs (E) AND DSC PERSONNEL AT RISK AND COST OF DEFAULTING CONTRACTOR AT AF STATION MUMBAI
2022_MES_570984_1
82634/E8
Open Tender
Civil Works
Item Rate
180 days
GE AF THANE
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
GE AF THANE
₹2.1 L
Yes
10 Mar 2023
26 Dec 2022
11 Feb 2023
26 Dec 2022
4 Feb 2023
30 Jan 2023
Amount
Removal of damaged concrete along with loose damaged and cracked concrete/cover concrete at all specified locations up to beyond the corroded steel reinforcements to a depth of10mm minimum behind the reinforcement by chipping/hacking with chisel and hammer or by mechanical means like chisel hammer,pneumatic chippers including high pressure water jetting to chipped concrete and reinforcement and removal and disposal of debris alongwith other debris outside MOD land including all plant and machineries. Note : Rates quoted for all items should include all necessary scaffolding , staging etc complete all as specified and as directed. During execution proper propping by steel props to be given to avoid distress in structure. For exterior columns (columns on the edges of building) working height will be upto 14 mtrs. The quoted rates must be inclusive of all such provisions. HSE Guidelines : Recommended to wear tightfitting,dust-resistant goggles and mask during breaking and surface grinding works etc.
M & L for Cleaning as directed & specified all rust/ scales/corrosion from reinforcement bars using rust remover Reebaklens RR- Rust remover, cleaning and etching agent supplied in 1/2, 1 and 5 Litre containers, having Specific Gravity 1.16 - 1.22 @ 25°C. Reebaklens RR cleaning agent is a combination of acid based material, corrosion inhibitors and dispersing agents and is supplied as a clear green solution.Application of Reebaklens RR with brush for complete wetting of rusted metal surface and allowed to react it for 16-24 hours followed by cleaning the surface with wire brush and washing surface with fresh water as required to exposed reinforcement bars complete as specified. Note : Rates quoted for all items should include all necessary scaffolding , staging etc complete all as specified and as directed. During execution proper propping by steel props to be given to avoid distress in structure. For exterior columns (columns on the edges of building) working height will be upto 14 mtrs. The quoted rates must be inclusive of all such provisions. HSE Guidelines : Recommended to wear tight-fitting, dust-resistant, chemical splash goggles if airborne dust is generated, Wear protective gloves. Wear appropriate clothing to prevent any possibility of skin contact.
M & L for Providing & applying inhibition coats/system to exposed reinforcement bars after drying & also new bars after cleaning & removing scales and rust completely as specified. Nitozinc Primer- Two component epoxy zincrich primer supplied in 1 and 5 Litre pack, two component system based on metallic zinc and epoxy resin which on mixing gives a grey coloured liquid. An Anti corrosive coat contents Active 'Zinc-rich' system which combats corrosion by electro chemical means. having specific gravity of 1.75, Adhesive bond strength > 1.5 N/mm2 Solid content- 60 %, 40 microns DFT, Fully dry/Recoatable- 45 minutes to 1 hour.Typical application includes surface preparations by cleaning steel surface to a bright condition paying particular attention to the back of exposed steel bars, mixed two components slow speed heavy duty drill fitted with a paddle, applying unbroken coat with suitable brush and allow to dry, after 30 mins apply second coat to ensure complete cover to exposed steel/ rebar etc complete. Total Dry film thickness is 40 microns. HSE Guidelines : Nitozinc Primer and Nitofl or Sol should not come in contact with the skin and eyes, or be swallowed. Adequate ventilation should be ensured and inhalation of vapours should be avoided. suitable protective clothing, gloves and eye protection shall be worn. If working in confined areas, suitable respiratory protective equipment must be used. The use of barrier creams, provide additional skin protection. Incase of contact with skin, it shall be rinsed with plenty of water, then cleansed with soap and water. Note : Rates quoted for all items should include all necessary scaffolding , staging etc complete all as specified and as directed. During execution proper propping by steel props to be given to avoid distress in structure. For exterior columns (columns on the edges of building) working height will be upto 14 mtrs. The quoted rates must be inclusive of all such provisions.
M & L for Providing and executing injection/pressure grouting in cracks in the parent concrete by fixing PVC/Aluminium nipples at 150 mm to 200 mm distance or specified distances as per design and detailed specifications. Pressure grouting using low viscous epoxy grout Conbextra EP 10(M)- Moisture insensitive epoxy resin injection material supplied in 1.5 Litre pack which can grout gaps ranging from 0.25mm to 9mm, having mix density 1060 kg/m3,Compressive Strength(ASTM D695)-60/mm2, Tensile Strength(ASTM C 304-97)-20 N/mm2, Flexural strength(BS 6319 Part 4)-45 N/mm2. Pressure grouting shall be carry out after surface preparations includes fixing nipples and filling cracks with epoxy mortar one day before grouting, injecting low viscous grout mechanically about pressure 3.5 - 7.0 kg/cm² , removing nipple after grouting and sealing with epoxy mortar etc complete as directed by EIC. Payment shall be made on actual grout consumed and including necessary steel double scaffolding (upto 15 Meters Height from ground level) complete all as specified and as directed. HSE Guidelines : Conbextra EP10(M) : Contains resins which may cause sensitisation by skin contact. Avoid contact with skin and eyes and inhalation of vapour.Recommended to wear tight-fitting, dust-resistant, chemical splash goggles if airborne dust is generated, Wear protective gloves. Wear appropriate clothing to prevent any possibility of skin contact. Barrier creams provide additional skin protection. Keep away from sources of ignition - no smoking. Maintain ample ventilation. Note(i) : Drilling and all other arrangements for nipple fixing shall be deemed to be included in the quoted rate. Note (ii) : Note : Rates quoted for all items should include all necessary scaffolding , staging etc complete all as specified and as directed. During execution proper propping by steel props to be given to avoid distress in structure. For exterior columns (columns on the edges of building) working height will be upto 14 mtrs. The quoted rates must be inclusive of all such provisions.
M & L for CRS steel bars, Cutting, fabricating new reinforcement Fe500 and fixing with old existing reinforcement (using tack welding at suitable intervals) which was reduced to 20 % or more of its original diameter as provided in original structure and additional steels as directed by EIC to be fixed with chemical anchor grout Lokfix E55- Styrene free vinyl-ester resin based cartridge system for anchoring reinforcement supplied in 300 ml cartidge with a single mixer nozzle, application includes drilling hole close to old reinforcement bar with suitable drill as per dia of bar, cleaning the hole with wire brush and compressed air, putting Lokfix E55 with gun followed by placing rebar with slide rotational motion to avoid air void formation etc complete as directed by EIC.(i) for 8mm dia (min embedment depth 80mm) (ii) for 10mm dia (min embedment depth 90mm) (iii) for 12 mm dia ( min embedment depth 110 mm) (iv) for 16 mm dia ( min embedment depth 125 mm) . Note : Rates quoted for all items should include all necessary scaffolding , staging etc complete all as specified and as directed. During execution proper propping by steel props to be given to avoid distress in structure. For exterior columns (columns on the edges of building) working height will be upto 14 mtrs. The quoted rates must be inclusive of all such provisions. HSE Guidelines : Recommended to wear tight-fitting, dust-resistant, chemical splash goggles if airborne dust is generated, Wear protective gloves. Wear appropriate clothing to prevent any possibility of skin contact.
M & L for Drilling holes into existing concrete substrate for anchoring of new rebars with 10 mm dia shear connectors at 0.5 mtr c/c and fixing with chemical anchor Lokfix E55- Styrene free vinyl-ester resin based cartridge system for anchoring reinforcement supplied in 300 ml cartidge with a single mixer nozzle, shall be tested in accordanceEuropean approval to EAD-33087-00-0601 for use in post-installed rebar, which supersedes ETAG 001 TR 023 (rebar), LEED compliant VOC Level, Fire resistance <120mins, Seismic C1 testing as part of EAD 330499-00-0601 for specific fastening sizes etc. Typical application inclueds drilling hole 16 mm dia and 125 mm deep as per manufactures recommadation, cleaning the hole with wire brush and compressed air, putting Lokfix E55 with gun followed by placing shear connector with slide rotational motion to avoid air void formation etc complete as directed by EIC. Note : Rates quoted for all items should include all necessary scaffolding , staging etc complete all as specified and as directed. During execution proper propping by steel props to be given to avoid distress in structure. For exterior columns (columns on the edges of building) working height will be upto 14 mtrs. The quoted rates must be inclusive of all such provisions. HSE Guidelines : Recommended to wear tight-fitting, dust-resistant, chemical splash goggles if airborne dust is generated, Wear protective gloves. Wear appropriate clothing to prevent any possibility of skin contact.
M & L for Epoxy Bond Coat Providing and applying bond coat on the prepared surface to receive polymer modified mortar/polymer modified micro concrete, with two component epoxy based bonding coat Nitobond EP- Epoxy resin concrete bonding agent supplied in 1/2, 1 and 4 Litre packs, having specific gravity 1.15 to 1.2 gm/cc, Compressive strength(BS 6319 Pt.2)- 50 Mpa at 7 days, Flexural strength strength(BS 6319 Pt.3)- 35 Mpa at 7 days, Tensile strength (BS 6319 Pt.7)- 20 Mpa at 7 days, Shear Strength (BS 6319 Pt.4)- 10 Mpa at 7 days, having an over lay time of 6 hrs and 30 ̊C, High bond strenght High bond strength : Bond strength is more than the tensile strength of good quality concrete, Barrier coat : Acts as a ‘barrier coat’ to the migration of chloride ions from host concrete. Laying of reinstatement polymer modified mortar or micro concrete shall be completed within the overlay time of bonding coat. The bond coat act as a bonding coat between old and new concrete. Typical application includes cleaning all loose dust, dirt, grease from host concrete surface by suitable means, mixing both components of bond coat by heavy duty slow speed mixer until a uniform consistency, apply unbroken coat of Nitobond EP with stiff brush covering complete area of patch repair before placing mortar or micro concrete. Item rate is inclusive of materials all labour, tools and tackles, scaffolding and transportation etc. complete as per specification and as directed by Engg.-in-charge. Note : Rates quoted for all items should include all necessary scaffolding , staging etc complete all as specified and as directed. During execution proper propping by steel props to be given to avoid distress in structure. For exterior columns (columns on the edges of building) working height will be upto 14 mtrs. The quoted rates must be inclusive of all such provisions. HSE Guidelines : Recommended to wear tight-fitting, dust-resistant, chemical splash goggles if airborne dust is generated, Wear protective gloves. Wear appropriate clothing to prevent any possibility of skin contact. Barrier creams provide additional skin protection. Do not smoke during use. Maintaine ample ventilation. If contact wiith the resin occurs, wash immediately with a strong detergent or a resin removing cream. Eye contamination must be immediatelywashed with plenty of water and medical treatment sought.
M & L for Polymer modified Mortar-Patch repair (Up to Grade M45) Providing and laying Renderoc SP 40- shrinkage controlled polymer modified single component, alkaline resistant fibre reinforced, thixotropic, cementitious patch repair mortar supplied in 25 kg moisture resistant bag when mixed with clean water at w:p ratio 0.18, achieves compressive strength (BS 1881 Pt.116) -> 20 Mpa at 1 day & > 45 Mpa at 28 days, Tensile Strength(BS 6319 Pt.7) > 2.5 Mpa at 28 Days, Flexural Strength(BS 6319 Pt.3)>7 Mpa at 28 days, Drying shrinkage to ASTM C 157-93, 28 days < 1000 microstrain. Typical application inclues mixing entire bag with clean water about 4.25L to 4.5 L, mixed in suitable container with heavy duty slow speed mixer machine to achieve uniform lump free mortar consistency, placing and finishing the same with trowel carefully compacting the same around the rebars and finishing to bring it in line with existing concrete surface on the beams, slabs, piles etc., where the thickness of application is less than 50 mm in patches as per specification after applying bonding coat. Item rate is inclusive of materials all labour, tools and tackles, scaffolding and transportation etc. complete as per specification and as directed by Engg.-in-charge. Note : Rates quoted for all items should include all necessary scaffolding , staging etc complete all as specified and as directed. During execution proper propping by steel props to be given to avoid distress in structure. For exterior columns (columns on the edges of building) working height will be upto 14 mtrs. The quoted rates must be inclusive of all such provisions. HSE Guidelines : Recommended to wear tight-fitting, dust-resistant, chemical splash goggles and mask if airborne dust is generated, Wear protective gloves. Wear appropriate clothing to prevent any possibility of skin contact.
M & L for Polymer modified Micro-concrete (upto Grade M50) Providing and applying Renderoc RG- polymer modified micro-concrete supplied in 25 kg moisture resistant bag should possess following properties when mixed with clean water at w:p ratio 0.16, such as compressive strength (BS 4551-80)-50 Mpa at 28 Days, Tensile strength- 2 Mpa @ 28 Days, Flexural Strength(BS 4551-80)-5 Mpa at 28 Days, Young’s modulus-25 kN/mm2, Expansion characteristics (ASTM C827 - 1987)-Unrestrained expansion 1 to 4 %,Pressure to restrain Plastic Expansion-Approx. 0.004 N/mm2,Thermal Conductivity – 1.5 W/m ̊C, Fire rating (EN 1504 cl 5.5)- Class A1, Fresh wet density (Mixed density @27°C)- 2100 - 2200 kg/m3. Typical application inclued mixing whole bag with clean water about 4 litres, mixing in suitable container with heavy duty slow speed mixer machine to produce uniform, free flowing mix, pouring the same into the formwork using suitable arrangement or if required using pumping device for uniform flow of micro concrete. The side shuttering can be removed after 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate. Item rate is inclusive of materials all labour, tools and tackles, scaffolding and transportation etc. complete as per specification and as directed by Engg.-in-charge. Note : Rates quoted for all items should include all necessary scaffolding , staging etc complete all as specified and as directed. During execution proper propping by steel props to be given to avoid distress in structure. For exterior columns (columns on the edges of building) working height will be upto 14 mtrs. The quoted rates must be inclusive of all such provisions. HSE Guidelines : Recommended to wear tight-fitting, dust-resistant, chemical splash goggles and mask if airborne dust is generated, Wear protective gloves. Wear appropriate clothing to prevent any possibility of skin contact.
Demolition/Dismantling of brick work or stone/boulder built in lime mortar or cement mortar including all quoins, arches pillars etc but excluding ashlar facing dressed stone work & precast concrete articles for portion ordered to be dismantled/ demolished and removing debris outside MOD land. Pl note that such demolition/ dismantling is being carried out to expose column/beam faces for rehabilitation and as such demolition/dismantling only upto a distance of maximum 0.45m from beam/ column face shall be payable or actual demolition/ dismantling whichever is lower. Any further demolition/ dismantling shall be made good by the contractor at his own expense withourt further costs.
Material and labour for precast cement concrete (1:5:8) (one part cement, five part sand and eight aggregates ) (using 20mm graded stone aggregates) block masonry with solid blocks, exceeding 10 cm in width and setting in cement mortar (1:6) complete all as specified and as directed by Engr-in-Charge
M&L for 15 mm thick cement plaster on stone or concrete surfaces in CM 1:4 mixed with water proofing compound @ 3% by weight of cement. [Note:- WPC shall be measured and paid separately ]
Supply only water proofing compund
M&L for 10 mm thick cement plaster on Brick or concrete surfaces in CM 1:6.
Note for Ser Item No 1.00 to 14.00: 1) Quoted rates for all items to include material and labour for all necessary staging, scaffolding, support to existing structure to prevent any degradation in nearby beams, columns during and after dismantling or demolition till adequate strength has been gained by rehabilitated structure post rehabilitation as per the advice of authorized applicator of structural rehabilitation. 2) The work must be executed through specialist applicator which are already approved by the original manufacturer. The cost of Hiring specialist applicator must be included in the quoted rates by the tenderer. The details of specialist applicator along with its work experience of similar nature in last five (05) years shall be submitted by successful contractor to GE. Final approval of such specialist applicator shall be accorded by Accepting Officer after recommendation of GE. 3) The applicator should have experience of minimum five (05) years of doing similar nature of work. The specialist applicator must have successfully executed/completed at least one (01) work of 80% of estimated cost of work or two (02) works each of 50% of estimated cost of work or three (03) works each of 40% of estimated cost of work for similar nature of work in last three years to any central/state govt organization/PSUs/Public Listed companies. Copies of contracts/work orders and documentary evidence of successful execution/completion in support of past experience of similar nature of works with name, address & contact details of clients shall be submitted for approval of specialist applicator.
Note for Ser Item No 1.00 to 14.00 (Contd...): 4) The specification and procedure of retrofitting and rehabilitation is designed as per the chemicals/materials of Fosroc as per advice of IIT Bombay. If the contractor desires to execute the work by using any manufacturer other than Fosroc as per Appx of makes, then the contractor must submit the design and specifications of other manufacturer duly vetted by IIT Bombay to the GE at no extra cost to the govt. Decision of GE shall be final and binding for the approval of manufacturer. 5) Original manufacturer should provide checklist/SOP requirement sheet inspected by their application engineer in presence of GE and Contractor consisting of step-by-step process to be carried out for ensuring quality requirement, duly signed by all. After completion of work on site, contractor must submit the completion certificate from the approved manufacturer duly certifying that work has been completed under their supervision and through approved specialist applicator and all the standard procedure and specifications has been adhered to while executing the work.
M/s Mohd Altaf Hanif Qureshi
Modern Engineering Co
M/s Harjas Construction & Waterproofing Co
United Sales Corporation
M/s Shree Construction Co
DARSHAN CONSTRUCTION Co.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .