Tender Value
₹24.8 L
EMD Value
₹49,600
Closing Date
10 Oct 2026, 5:00 pm
Executive Engineer, RMC
RMC
Construction of PCC Road and RCC Drain from Ashrafi Mobile to Akhtar Imam near Joda Talab under ward No-09
2026_UDD_119275_2
335/eng 2026
Open Tender
Civil Works
Works
90 days
As per NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹49,600
28 Sept 2026
28 Sept 2026
12 Oct 2026
28 Sept 2026
10 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Labour for site clearence before and after the work etc. | 5 | Nos. | 326.85 | ₹1,634.25 |
| 2 | Dismantling Plain Cement or lime work including stacking seviceable materails in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I | 15.58 | m3 | 955.89 | ₹14,892.77 |
| 3 | Earth work in Excavation in foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth as obtained to a distance up to 50 mm including all lifts, leveling, ramming the foundation trenches removing roots of trees, all complete as per approved design , building as per specification & direction of E/I. | 83.18 | m3 | 151.82 | ₹12,628.39 |
| 4 | Providing ,supplying & spreading of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials , labour, royality and taxes all complete as per specification and direction of E/I (Mode of measurement compacted volume) | 7.79 | m3 | 347.85 | ₹2,709.75 |
| 5 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of Boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 13.08 | m3 | 1,756.4 | ₹22,973.71 |
| 6 | Reinforced cement concrete work in walls (any Thickness), including attached pilasters, buttresses, abutments, posts and structs etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) | 109.03 | m3 | 6,082.45 | ₹6,63,169.52 |
| 7 | Reinforced cement concrete work in beams, suspended floors, foors having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). | 15.58 | m3 | 6,308.87 | ₹98,292.19 |
| 8 | Providing Tor steel reinforcement of 8mm & 10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending, and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
8mm Dia. | 3.08 | M.T. | 83,314.02 | ₹2,56,607.18 |
| 9 | 10mm Dia. | 4.62 | M.T. | 82,096.54 | ₹3,79,286.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
Tendernotice_2.pdf
PDF • 1.74 MB
BOQ_161426.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .