Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹11 L
EMD Value
₹11,000
Closing Date
7 Nov 2025, 12:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Near Electricity Workshop Chilbila Pratapgarh
Shifting works of 11 KV, LT lines and transformers passing over the primary/upper primary schools under Electricity Distribution Division Kunda, Pratapgarh on semi turnkey basis including loading and unloading of material.
2025_PVVNV_1084389_1
47/EDCP/2025-26
Open Tender
Electrical Works
Lump-sum
90 days
E.E. EDD Kunda Pratapgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
S.E. EDC Pratapgarh
₹11,000
7 Nov 2025
21 Oct 2025
7 Nov 2025
21 Oct 2025
7 Nov 2025
21 Oct 2025
Supply of Materials
Stone Pad 300 X 300 X 75 mm.
Cross arms holding clamp
LT CLAMPS
Dead End Clamp For End & Turning
IPC Connector For DB
Mid Span Jointer
Eye Hook
PG clamp for ACSR Weasel
Bolts, Nuts and washers.
Suspention Clamp
Errection Work
Safe Loading, carriage from Store Center Chilbila Pratapgarh to work site (Distance 30-70 K.M.) and unloading, errection of 8.5 meter PCC Pole Single pole HT Line with complete fitting as per respo norms. (This work includes grouting and earthing of pole)
Stringing and Banding of HT/LT Line on 8.5 meter PCC Pole with ACSR weasel conductor and binding with insulator.
Stringing and Banding of HT/LT Line on 8.5 meter PCC Pole with ACSR DOG conductor and binding with insulator.
Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 30-70 K.M.) of L T ABC CABLE 1X16 sqmm.
Safe Loading, carriage from Store Center Chilbila Pratapgarh to Different work site (Distance 30-70 K.M.) of L T ABC CABLE (3X95+1X70) sqmm.
Laying & Hanging of L T ABC CABLE (3X120+1X95+1X16) sqmm.
Safe carriage of following capacity Transformers from Old Site To New Site and mounting at double pole with energization as per respo norms.
Old Recived back material
Safe carriage of received back material with proper stacking of old conductor in bundles and carriage to the store
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
SP_47.rar
Tender Documents • 0.75 MB
BOQ_1987090.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .