| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹6.3 L (2.07%)Admitted-Finance | ₹3.1 Cr+₹6.3 L (2.07%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹9.0 L (2.99%)Admitted-Finance | ₹3.1 Cr+₹9.0 L (2.99%) | L3 | Admitted-Finance |
| 4 | L4₹3.2 Cr+₹18.0 L (5.93%)Admitted-Finance | ₹3.2 Cr+₹18.0 L (5.93%) | L4 | Admitted-Finance |
| 5 | L5₹3.2 Cr+₹20.7 L (6.83%)Admitted-Finance | ₹3.2 Cr+₹20.7 L (6.83%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s.BASUDEV CONSTRUCTION L12 | SINGO ENGINEERING INDIA PRIVATE LIMITED L13 | Pramod Kumar Nayak L11 | Aakar Infra Engineers PVT Ltd L14 | M/S.Parikshita Chuli and Sons L8 | Bidyadhar Swain L5 | M/S CHINMAYA RANJAN PARIDA L2 | SUBRAT KUMAR BEHURA L9 | M/S Kailash Chandra Samal L10 | M/S ULASH CHANDRA BISWAL L4 | M/s. Magu Charan Nayak L1 | CHITTA RANJAN SWAIN L7 | NIRANJAN SAHOO L3 | Rabindra Nath Das L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Empty bore of 450mm dia up to 18Mtr. depth from GL including supply of rig, tripod & other accessories which are required for boring & ascertaining the soil strata up-to18Mtr. depth, in every 1.00 m depth, the strata of soil to be collected for SBC test & submission of test report to the Office with supply of all labour, materials,safety arrangements for labours, T&P, taxes excluding GST all complete as per the direction of Engineer-in-charge. | 3 | Each No. | 21,600 ₹64,800 | 10,258 ₹30,774 | 2,500 ₹7,500 | 4,800 ₹14,400 | 2,000 ₹6,000 | 1,300 ₹3,900 Lowest | 1,348 ₹4,044 | 1,300 ₹3,900 Lowest | 8,000 ₹24,000 | 30,000 ₹90,000 | 8,123 ₹24,369 | 5,000 ₹15,000 | 1,348 ₹4,044 | 10,000 ₹30,000 |
| 2.00 | Providing 450mm dia double under reamed M-20 grade (Bored Compaction) pile of 15m length from cut off level including welding of cages, boring through all strata from existing ground level with removal of obstruction if any, using bentonite, including necessary MS cones as required ,fabricating the MS cone out of 2.5mm/3.15mm thick MS plate, erecting & providing required reinforcement 6nos of 16mm dia longitudinal bar , 10mm dia. master ring@ 1.20mc/c & 8mm dia ring @ 0.2m c/c properly welded to the main bars and disposing the bored earth out from the work site, including supply of all labour, materials, fabrication, taxes, tollage, royalties, safety arrangements for labours, T&P etc. complete exlcuding GST and as per direction of Engineer in charge. NB : (a) Excluding cost of steel & labour for bending & binding. (b) Payment shall be made from cut off level. (c) Any excess or less length beyond the specification length in this item the rate shall be paid propertionately to the rate quoted for this perticular item. | 154 | Each No. | 13,734 ₹21,15,036 | 13,588.9 ₹20,92,690.6 | 24,000 ₹36,96,000 | 32,000 ₹49,28,000 | 17,000 ₹26,18,000 | 13,600 ₹20,94,400 | 23,500 ₹36,19,000 | 23,000 ₹35,42,000 | 18,000 ₹27,72,000 | 17,000 ₹26,18,000 | 13,123 ₹20,20,942 Lowest | 20,000 ₹30,80,000 | 19,900 ₹30,64,600 | 17,900 ₹27,56,600 |
| 3.00 | Conducting Initial load test as per IS-2911(Part-IV) for testing of pile including Kantiledge of required load & supply of all testing equipments including cost & construction of required length of pile as specifiec in Sl. No. 02 & test pile cap & dismentaling the kantiledge after completion of the test & submit the test report as per IS-2911(Part-IV) with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge . NB: Applied load is 2.50 times of the design load, i.e 25.00 Tons. | 3 | Each No. | 95,000 ₹2,85,000 | 53,517.5 ₹1,60,552.5 | 30,000 ₹90,000 | 40,000 ₹1,20,000 | 30,000 ₹90,000 | 12,400 ₹37,200 Lowest | 12,445 ₹37,335 | 28,000 ₹84,000 | 25,000 ₹75,000 | 30,000 ₹90,000 | 18,000 ₹54,000 | 40,000 ₹1,20,000 | 12,445 ₹37,335 | 20,000 ₹60,000 |
| 4.00 | Routine load test for the working piles including kantiledge of required load as per IS-2911(Part-IV) for testing of pile & supply of all testing equipments including cost & constructing of test pile cap & dismantling the same after completion of the test as specified in Sl. No. 02 & test pile cap & dismantling the same after completion of the test & submit the test report as per IS-2911(Part-IV) with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge . (NB: Applied load is 1.50 times of the design load, i.e 25.00 Tons.) | 3 | Each No. | 70,000 ₹2,10,000 | 20,069.5 ₹60,208.5 | 18,000 ₹54,000 | 50,000 ₹1,50,000 | 15,000 ₹45,000 | 6,000 ₹18,000 Lowest | 6,000 ₹18,000 Lowest | 15,000 ₹45,000 | 15,000 ₹45,000 | 30,000 ₹90,000 | 13,000 ₹39,000 | 20,000 ₹60,000 | 10,000 ₹30,000 | 20,000 ₹60,000 |
| 5.00 | Earth work excavation in all kinds of soil from the existing ground level in foundation trenches & levelling, ramming as per requirement etc with all leads and lift disposing and spreading the excavated material within a lead of 5 km at locations as directed with supply of all barricading to the work site with cost & supply of all materials, labour, safety arrangements for labours, T&P, royalties, tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge. | 732 | Each Cum | 95 ₹69,540 | 252.3 ₹1,84,683.6 | 80 ₹58,560 | 120 ₹87,840 | 97.53 ₹71,391.96 | 97 ₹71,004 | 97 ₹71,004 | 90 ₹65,880 | 80 ₹58,560 | 180 ₹1,31,760 | 43 ₹31,476 Lowest | 80 ₹58,560 | 75 ₹54,900 | 75 ₹54,900 |
| 6.00 | Cutting pile head up to cut off level including disposing of the dismantled material out of work site to near by dumping area with supply of all materials, barricading the work site with cost & supply of all materials, labour, safety arrangements for labours, T&P, royalties, tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge. | 154 | Each No. | 600 ₹92,400 | 1,080.66 ₹1,66,421.64 | 100 ₹15,400 | 500 ₹77,000 | 100 ₹15,400 | 50 ₹7,700 | 30 ₹4,620 Lowest | 100 ₹15,400 | 200 ₹30,800 | 300 ₹46,200 | 470 ₹72,380 | 100 ₹15,400 | 50 ₹7,700 | 50 ₹7,700 |
| 7.00 | Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 hard granite graded chips of 40mm & below size Crusher Broken) for PCC including form works made of ply/steel shutters, hoisting, laying over compacted surface, finished smooth to the exposed surface, to proper level & gradient, barricading the work site ,curing, water charges,all testing charges with submission of reports etc. with cost & supply of all materials, labour, safety arrangements for labours, T&P, royalties, tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge. | 244.5 | Each Cum | 4,050 ₹9,90,225 | 7,500 ₹18,33,750 | 3,600 ₹8,80,200 | 5,000 ₹12,22,500 | 3,400 ₹8,31,300 | 3,600 ₹8,80,200 | 3,000 ₹7,33,500 Lowest | 3,100 ₹7,57,950 | 3,600 ₹8,80,200 | 4,200 ₹10,26,900 | 3,123 ₹7,63,573.5 | 3,000 ₹7,33,500 Lowest | 3,500 ₹8,55,750 | 3,100 ₹7,57,950 |
| 8.00 | Filling of sand (saline sand) to the required level including transportation within a lead of 5 Km. (avg.) by private trucks with covering at the top to prevent spillage/blowing of sand including loading at one end and unloading at other end (work site), spreading in layers, leveling, cosolidating/compacting in suitable layers with cost of water & supply of all materials, labour, T&P, operation expenses, all POL, cost of water, to proper level & gradient, barricading the work site, safety arrangements for labours, T&P, royalties, tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge.
(N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity.) | 1,453 | Each Cum | 260 ₹3,77,780 | 219.65 ₹3,19,151.45 | 220 ₹3,19,660 | 900 ₹13,07,700 | 140.6 ₹2,04,291.8 | 140 ₹2,03,420 | 110 ₹1,59,830 | 140 ₹2,03,420 | 140 ₹2,03,420 | 300 ₹4,35,900 | 93 ₹1,35,129 Lowest | 200 ₹2,90,600 | 120 ₹1,74,360 | 140 ₹2,03,420 |
| 9.00M20 grade mix design concrete using black hard granite chips (Crusher Broken) of approved quality for construction of RCC pile cap, tie beam, column, roof beam, lintel, chajja & roof slab etc including, hoisting, laying, consolidating with vibrator, curing, maintaining proper level & slope, finished smooth to the exposed surface etc. complete at any height & any levels with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges,all testing charges with submission of reports, all transportation charges, all taxes excluding GST ,but excluding the cost of binding wire, cost of steel, labour charges for bending/binding of steel & cost of form work complete as directed by the Engineer in charge. | |||||||||||||||||
| 9.01 | In foundation & plinth | 225 | Each Cum | 5,500 ₹12,37,500 | 7,000 ₹15,75,000 | 4,800 ₹10,80,000 | 6,500 ₹14,62,500 | 4,590 ₹10,32,750 | 5,200 ₹11,70,000 | 4,000 ₹9,00,000 Lowest | 5,200 ₹11,70,000 | 4,800 ₹10,80,000 | 4,500 ₹10,12,500 | 4,123 ₹9,27,675 | 5,000 ₹11,25,000 | 4,280 ₹9,63,000 | 4,000 ₹9,00,000 Lowest |
Tender Value
₹3.4 Cr
EMD Value
₹6.9 L
Closing Date
7 Dec 2020, 5:00 pmClosed
S K SETHY,EE,BCD,PPT
S K SETHY,EE,BCD,PPT
Construction of New cyclone shelter cum Players Hostel at Gopabandhu stadium
2020_MoS_597668_1
CE/BC/ACCTS-44/2020
Open Tender
Civil Works
Works
330 days
Paradip
Refer Tender Document and e-TCN
3 documents required · 3 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹6.9 L
Yes
12 May 2021
18 Nov 2020
9 Dec 2020
18 Nov 2020
7 Dec 2020
18 Nov 2020
Amount
Empty bore of 450mm dia up to 18Mtr. depth from GL including supply of rig, tripod & other accessories which are required for boring & ascertaining the soil strata up-to18Mtr. depth, in every 1.00 m depth, the strata of soil to be collected for SBC test & submission of test report to the Office with supply of all labour, materials,safety arrangements for labours, T&P, taxes excluding GST all complete as per the direction of Engineer-in-charge.
Providing 450mm dia double under reamed M-20 grade (Bored Compaction) pile of 15m length from cut off level including welding of cages, boring through all strata from existing ground level with removal of obstruction if any, using bentonite, including necessary MS cones as required ,fabricating the MS cone out of 2.5mm/3.15mm thick MS plate, erecting & providing required reinforcement 6nos of 16mm dia longitudinal bar , 10mm dia. master ring@ 1.20mc/c & 8mm dia ring @ 0.2m c/c properly welded to the main bars and disposing the bored earth out from the work site, including supply of all labour, materials, fabrication, taxes, tollage, royalties, safety arrangements for labours, T&P etc. complete exlcuding GST and as per direction of Engineer in charge. NB : (a) Excluding cost of steel & labour for bending & binding. (b) Payment shall be made from cut off level. (c) Any excess or less length beyond the specification length in this item the rate shall be paid propertionately to the rate quoted for this perticular item.
Conducting Initial load test as per IS-2911(Part-IV) for testing of pile including Kantiledge of required load & supply of all testing equipments including cost & construction of required length of pile as specifiec in Sl. No. 02 & test pile cap & dismentaling the kantiledge after completion of the test & submit the test report as per IS-2911(Part-IV) with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge . NB: Applied load is 2.50 times of the design load, i.e 25.00 Tons.
Routine load test for the working piles including kantiledge of required load as per IS-2911(Part-IV) for testing of pile & supply of all testing equipments including cost & constructing of test pile cap & dismantling the same after completion of the test as specified in Sl. No. 02 & test pile cap & dismantling the same after completion of the test & submit the test report as per IS-2911(Part-IV) with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge . (NB: Applied load is 1.50 times of the design load, i.e 25.00 Tons.)
Earth work excavation in all kinds of soil from the existing ground level in foundation trenches & levelling, ramming as per requirement etc with all leads and lift disposing and spreading the excavated material within a lead of 5 km at locations as directed with supply of all barricading to the work site with cost & supply of all materials, labour, safety arrangements for labours, T&P, royalties, tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge.
Cutting pile head up to cut off level including disposing of the dismantled material out of work site to near by dumping area with supply of all materials, barricading the work site with cost & supply of all materials, labour, safety arrangements for labours, T&P, royalties, tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge.
Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 hard granite graded chips of 40mm & below size Crusher Broken) for PCC including form works made of ply/steel shutters, hoisting, laying over compacted surface, finished smooth to the exposed surface, to proper level & gradient, barricading the work site ,curing, water charges,all testing charges with submission of reports etc. with cost & supply of all materials, labour, safety arrangements for labours, T&P, royalties, tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge.
Filling of sand (saline sand) to the required level including transportation within a lead of 5 Km. (avg.) by private trucks with covering at the top to prevent spillage/blowing of sand including loading at one end and unloading at other end (work site), spreading in layers, leveling, cosolidating/compacting in suitable layers with cost of water & supply of all materials, labour, T&P, operation expenses, all POL, cost of water, to proper level & gradient, barricading the work site, safety arrangements for labours, T&P, royalties, tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge. (N.B:- 10% voids shall be deducted from the measured quantity of sand after compaction to arrive at the payable quantity.)
M20 grade mix design concrete using black hard granite chips (Crusher Broken) of approved quality for construction of RCC pile cap, tie beam, column, roof beam, lintel, chajja & roof slab etc including, hoisting, laying, consolidating with vibrator, curing, maintaining proper level & slope, finished smooth to the exposed surface etc. complete at any height & any levels with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges,all testing charges with submission of reports, all transportation charges, all taxes excluding GST ,but excluding the cost of binding wire, cost of steel, labour charges for bending/binding of steel & cost of form work complete as directed by the Engineer in charge.
In foundation & plinth
In Superstructure at ground floor
In Superstructure at first floor
In Superstructure at second floor
Supply of Fe-500 steel confirming to I.S. Specifications of SAIL/TATA/VIZAG/JINDAL PANTHER brands including cutting, straightening, bending, binding & placing the grills in position for RCC works including cost of binding wire of 18 to 20 gauge & febricating of steel at any height & any levels with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge. (N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid.)
Providing rigid, smooth, leak proof, centering & shuttering with formworks made out of new ply/ Steel shutters/across span/props/movable couplers as required for walls, providing openings on walls, chipping & coaltaring after each use of shuttering materials, dismantling the same after stripping off period including supply of all materials, labour, T&P, tollage, royalties,taxes excluding GST, etc. all complete as directed by the Engineer in charge.
In foundation & plinth
Ground floor column & beam
Ground floor lintel
Ground floor chajja & roof slab
First floor column & beam
First floor lintel
First floor chajja & roof slab
Second floor column & beam
Second floor lintel
Second floor chajja & roof slab
Brick work in KB bricks in cement mortar (1:6) in F&P & superstructure using K.B. Bricks having crushing strength between 75 Kg/Cm² to 99Kg/Cm² at any height & any levels with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges,all testing charges with submission of reports, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
In foundation & plinth
Ground floor super structure
First floor super structure
Second floor super structure
Back filling with ⅔ qty. of excavated soil in foundation trenches & levelling, ramming, cosolidating/compacting as per requirement etc. & lifting of excavated material within a lead within 5 km with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, compacting, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Cement plaster of following proportions over brick and concrete surface as reqiured and finished smooth to the exposed surface, rounding the corner at any height & any levels with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
In foundation & plinth upto plinth, 12mm thick with CM(1:6)
Ground floor inside upto roof slab, 12mm thick with CM(1:6)
Ground floor inside ceiling, 12mm thick with CM(1:4)
First floor inside upto roof slab, 12mm thick with CM(1:6)
First floor inside ceiling, 12mm thick with CM(1:4)
Second floor inside upto roof slab, 12mm thick with CM(1:6)
Second floor inside ceiling, 12mm thick with CM(1:4)
Outside plastering, 16mm thick with CM(1:6)
Outside plastering, 12mm thick with CM(1:4) GF
Outside plastering, 12mm thick with CM(1:4) 1st F
Outside plastering, 12mm thick with CM(1:4) 2nd F
Providing 40mm thick AS flooring, CC(1:2:4) using CB chips with out cement punning including finishing smooth to the exposed surface including, mixing , hoisting, laying, consolidating , curing, maintaining proper level & slope, etc complete at any levels with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Neat cement punning any height & any levels with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying, fitting & fixing of WPC door and window frames of required size as per requirment with clamping/anchore bolt to the wall/RCC column, required staging, scaffolding at any levels with cost of loading, unloading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying fitting and fixing of 32mm thick WPC door/ window shutters charges at any levels with cost including loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying, fitting, fixing dressed seasoned salwood frames/ choukath for door /window /ventilator etc coaltaring two coats to wall side face of frame, fixing to position with required nos of W.I clamps of size 250mmx40mmx4mm size, grouting with C.C (1:2:4) including cutting grooves in walls & fixing to proper position & making good the damage including cutting grooves in choukaths and jointing with adhesive solution any height at any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying, fitting, fixing in wooden frames 32mm thick panel shutters for doors with all aluminium fittings, wooden hinged cleats, sand blocks, cutting grooves in chaukath, mending good the damages any height at any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying, fitting, fixing fully glazed sliding/fixed aluminum window & ventilator shutters & frame with aluminum section of size and thickness as per approved design fixing with 5.5mm. thick plain/frosted/colored glass, panes providing rubber beading, aluminum U channels, angle, clips, required nos. of handles, tower bolts, hooks as per I.S.I. specification, etc. all finished any height at any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Providing & supplying, fitting, fixing MS grill with flat & square bar of approved quality, size & design as per requirment at site including fabrication, making hole in brick pillar for fixing of gate with CC(1:2:4) to proper position including removing & refixing the gate any height at any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying, fitting, fixing abrasion resistant full body vitrified tile of size 605mm. x 605mm x 8.00 mm double charge, of approved quality, shade laying over a base course of CM(1:1) 20mm. thick and cement slurry including cutting to size, filling the joints with tile grouts of adequate shade laid to proper slope & level cleaning the top surface at any height & any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying, fitting, fixing of 8.0mm thick ceramic glazed tile of approved quality, size(300mm x 450mm), shade, over wall fixing over a 20mm base course of C.M(1:4) and cement slurry including cutting to size filling the joints with tile grout , fixed to proper level etc. all wastages, mending good the damages at any height & any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying, fitting, fixing of 18mm thick flame finish granite stone slab saw cut,mirror polished premoulded ,machine cut for walls & floors of required size approved shade colour Z-black & texture laid over base of 20mm thick with CM(1:4) and cement slurry including , jointing the joints with white cement and pigments laid to proper slope and level cleaning the top surface at any height & any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Weather coat two coats to exterior wall surface with approved weather coat of approved colour & shade with one coat of wall putty & one coat of primer by the use of brush to give an even surface to the satisfaction at any height & any levels with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Painting with two coats of distemper with approved colour & shade over one coat of primer including filling the holes with required materials to give an even shade & preparing the surface with sand papering, cleaning the wall including cost of brush at any height & any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Enamel painting two coats to wood/iron work of approved quality & shed over a coat of primer after scrapping, sand preparing & cleaning the surface & filling the joints & holes with putty(boiled or raw) where found necessary before paint at any height & any levels with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying, fitting and fixing the following brass materials/fittings of approved quality approved quality & size with polished body (of ISI mark & specification) including loading & unloading charges, with supply of screw/nails any height at any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Hydraulic door closer (Godrej)
Mortise lock 04 levers (Godrej)
300mm long decorative brass handle
250mm long brass tower bolt
Aluminium door Stopper(100mm)
Aluminium hinges(100mm x 63mm)
Aluminium hinges(75mm x 50mm)
150mm long aluminium handle
100mm long aluminium handle
150mm long aluminium tower bolt
Supplying, fabricating and fixing of stainless steel of 304 grade in hand railing using 50mm. dia of 2mm. thick circular pipe with fabricating of 2 mm thick circular pipe with newel posts of 75mm Øx 900 mm height balustrade of size 32mm. dia x 2mm thick @ 0.90mtr. C/C and pipe bracing of size 32mm. dia. x 2mm thick in 3 rows at stair case and other required places as per approved design & specification, muffing, polishing, etc. any height at any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding,all testing charges with submission of reports, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Providing fitting, fixing of 25mm thick chequered tile size(300mm x 300mm) of approved quality, , thickness over 20mm base course of C.M(1:3) and cement slurry including cutting to size filling the joints with white cement and colour pigment fixed to proper level etc. including all wastages at any height & any levels with cost including cost of loading & un-loading & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying of all materials, labour, T&P including all taxes tollage, royalities & constructing of Manhole Chamber, earth work excavation in all kinds of soil backfilling the same after work done, with CC(1:3:6) using 40mm & down CB metal of approved qty. over the bed of 0.25M thick, KB Brick having crushing strength not less than 75Kg/Cm² to 99Kg/Cm², RCC cover slab with CC(1:2:4) using 20mm & down CB chips of approved qty. including bending, binding of Tor steel with bindig wire 18 to 20 gauge & centering/shuttering, Cement plastering(1:3) of 12mm thick to outside & inside & neat cement punning to the inside surface wall & flooring as per the approved specification & design . Size(1200 x1200 x 900)mm with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying of all materials, labour, T&P including all taxes tollage, royalities & constructing of Grease Chamber, earth work excavation in all kinds of soil backfilling the same after work done, with CC(1:3:6) using 40mm & down CB metal of approved qty. over the bed of 0.25M thick, KB Brick having crushing strength not less than 75Kg/Cm² to 99Kg/Cm², RCC cover slab with CC(1:2:4) using 20mm & down CB chips of approved qty. including bending, binding of Tor steel with bindig wire 18 to 20 gauge & centering/shuttering, Cement plastering(1:3) of 12mm thick to outside & inside & neat cement punning to the inside surface wall & flooring as per the approved specification & design . Size(600 x 450 x 1200)mm with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying of all materials, labour, T&P including all taxes tollage, royalities & constructing of Grease Chamber, earth work excavation in all kinds of soil backfilling the same after work done, with CC(1:3:6) using 40mm & down CB metal of approved qty. over the bed of 0.25M thick, KB Brick having crushing strength not less than 75Kg/Cm² to 99Kg/Cm², RCC cover slab with CC(1:2:4) using 20mm & down CB chips of approved qty. including bending, binding of Tor steel with bindig wire 18 to 20 gauge & centering/shuttering, Cement plastering(1:3) of 12mm thick to outside & inside & neat cement punning to the inside surface wall & flooring as per the approved specification & design . Size(600 x 450 x 1200)mm with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Providing rigid, smooth, leak proof, centering & shuttering with formworks made out of new ply/ Steel shutters for walls, providing openings on walls, chipping & coaltaring after each use of shuttering materials, dismantling the same after stripping off period including supply of all materials, labour, T&P, tollage, royalties,taxes excluding GST, etc. all complete as directed by the Engineer in charge.
20mm dia Pipe
25mm dia Pipe
15mm dia Pipe
40mm dia Pipe
50mm dia Pipe
15mm dia Socket
20mm dia Socket
25mm dia Socket
40mm dia Socket
50mm dia Socket
20mm x 15mm Tee
25mm x 20mm Tee
25mm X 15mm Tee
50mm X 25mm Tee
50mm dia Union
40 mm dia Union
25mm dia Union
20mm dia Union
15mm dia Union
15mm dia Elbow
20mm dia Elbow
25mm dia Elbow
40mm dia Elbow
50mm dia Elbow
20mm x 15mm Elbow
25mm x 20mm Elbow
40mm x 25mm Elbow
50mm x 25mm Elbow
15mm dia Tee
20mm dia Tee
25mm dia Tee
40mm dia Tee
50mm dia Tee
20mm x 15mm Tee
15mm, 20mm & 25 dia Plug
20mm x 15mm brass FTA
20mm x 15mm brass MTA
20mm brass FTA
20mm brass MTA
40mm G.M.F.W.V(H/D)
50mm G.M.F.W.V(H/D)
25mm G.M.F.W.V(H/D)
20mm G.M.F.W.V(H/D)
15mm G.M.F.W.V(H/D)
Porcelin Commode with cover (P-Trap/S-Trap)
Long flush bend
20mm dia CP concealed stopcock (H/D)
10 lit. capacity low level Cistern
Porcelin wash basin with pedestal
Basin bracket
15mm dia CP angular stop cock (H/D)
15mm dia CP pillarcock (H/D)
100mm dia CP Grating
150mm dia CP Grating
15mm dia CP long body bibcock
15mm dia CP short body bibcock
15mm dia CP two way bibcock
CP over head Shower with shortarm
15mm dia CP 600mm long flexible Connection pipe
32mm CP Waste full thread 80mm long
32mm PVC Waste Pipe for basin
32mm PVC Waste Pipe for urinal
White glazed earthenware Standing Urinal of size 590mm x 400mm
White glazed earthenware Squating Urinal 450mm x 350 mm
Health feaucet
CP Shelf (20" x 5")
Mirror(600mm x 450mm)-5mm thick,with back board and brass mirror screws
CP Towel Ring
Towel Rail
Soap dish holder
CP Extension piece
M-Seal plumber
White cement
200mm PVC Pipe with all fittings
150mm PVC Pipe with all fittings
110mm PVC Pipe
75mm PVC Pipe
110mm PVC door bend
110mm PVC P-Trap
110mm Plain bend
110mm H/R bend
110mm dia offset
75mm PVC door bend
75mm/100mm PVC plain bend
75mm PVC plain bend
75mm dia S/J with door
75mm dia D/J with door
75mm dia Y Junction
110mm dia socket
110mm dia S/J with door
110mm dia D/J with door
110mm 45° bend
110mm dia Cowl
75mm dia Cowl
PVC clamp of all size with nail attached
U-PVC Paste (Each 100 gm)
Stain less kitchen sink( 24" x 18" x 8")
Supplying all materials, labour, T&P for cutting holes through brick & Rcc work including good to the same cement mortar(1:4) & leak proof to the damaged portion for taking C-PVC pipes & fittings at any height & any levels with cost & supply of all materials, labour, safety arrangements for labours, T&P, tollage, royalties, staging, scaffolding, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Brick Work
RCC work
Dewatering the deposited water form work site F&P area using diesel pump at any height & any levels with cost & supply of all materials, labour, fuel cost & operator cost, safety arrangements for labours, T&P, tollage, royalties all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
40mm thick graded concrete with C.C(1:2:4) by using CBG chips of 12mm and down grade of approved quality in superstructure adding 2% W.P.C (plastocrete plus) by weight of cement including mixing, hoisting, laying, consolidating, laying to proper slope and level, finishing smooth to the exposed surface with supply of all labours,materials ,T&P, royalties, tollage, transportation, all testing charges with submission of reports, safety arrangements for labours, Port entry fee all taxes excluding GST etc. all complete as per the direction of Engineer-in-charge.
M/S CHINMAYA RANJAN PARIDA
NIRANJAN SAHOO
M/S ULASH CHANDRA BISWAL
Bidyadhar Swain
Rabindra Nath Das
CHITTA RANJAN SWAIN
M/S.Parikshita Chuli and Sons
SUBRAT KUMAR BEHURA
M/S Kailash Chandra Samal
Pramod Kumar Nayak
M/s.BASUDEV CONSTRUCTION
SINGO ENGINEERING INDIA PRIVATE LIMITED
Aakar Infra Engineers PVT Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
corrr-3.pdf
Additional Documents • 0.30 MB
BOQ_627961.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .