Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹51.2 Cr Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III. | Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III. | L1 | - | |
| 2 | L2₹52.0 Cr+₹80.2 L (1.57%) Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III. | Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III. | L2 | - | |
| 3 | L3₹53.1 Cr+₹1.9 Cr (3.74%) Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III. | Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III. | L3 | - | |
| 4 | L4₹59.0 Cr+₹7.8 Cr (15.3%) Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III. | Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III. | L4 | - | |
| 5 | L5₹59.4 Cr+₹8.2 Cr (16.0%)Financial bid opened Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III. | Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III. | L5 | Financial bid opened |
| Sl No | Description | Qty | Unit | HARPAL SINGH L3 | L K BUILDERS L2 | M/S GUPTA CONSTRUCTION COMPANY, SURATGARH L5 | O P Kandoi and Co Pvt Ltd L6 | M/s J.P.G. Constructions Private Limited L4 | Kram Infracon Private Limited L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Conversion of border security fencing from phase-II/III to new design fence | - | - | -21.21 ₹53,11,49,396.22 | -22.86 ₹52,00,26,201.6 | -11.88 ₹59,40,46,005.77 | -6.66 ₹62,92,35,748.73 | -12.41 ₹59,04,73,100.83 | -24.05 ₹51,20,04,018.82 Lowest |
Tender Value
₹67.4 Cr
EMD Value
₹77.4 L
Closing Date
2 Apr 2024, 3:00 pmClosed
EE(C ), BFD-I, Siliguri
Satyendra Rajak
O/o The CE, IBBZ-I, CPWD, Matigara, Siliguri
Conversion of border security fencing from phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 436/10-S to 742/9-S (36.19 Km including intermediate BOPs, riverine structures like bridges, culverts including gaps in fences and length of existing old fences which are not in the scope of this works etc ) along Indo-Bangladesh Border in the district of Uttar Dinajpur, Darjeeling and Jalpaiguri West Bengal. (Package-II) in EPC Mode-III.
71254
13/NIT/CE/IBBZ-I/2023-24
OPEN
Civil Works - Others
NCB
20 months
Darjeeling, West Bengal
14 documents required · 14 mandatory
₹77.4 L
In the conference hall of Chief Engineer, IBBZ I, CPWD, Siliguri
2 Apr 2024
8 Mar 2024
2 Apr 2024
2 Apr 2024
14 Mar 2024
18 Mar 2024
stage.html
html • 0.08 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
NIT13%28Package-II%29BFD-I.pdf
document • 14.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .