| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | ₹1.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 LRejected-Finance | ₹1.4 L | L2 | Rejected-Finance L2 HENCE REJECTED |
| 3 | L3₹1.4 LRejected-Finance | ₹1.4 L | L3 | Rejected-Finance L3 HENCE REJECTED |
Tender Value
₹1.3 L
EMD Value
₹2,700
Closing Date
12 Feb 2026, 1:55 pmClosed
Pradhan Gram Panchayat
Saray Gaon
Const of Drinking Water Scheme near Rahul Rai house at School Gaon, Duptin G.P, Block Development Office Mirik. Activity Code-111882222
2026_GTA_998305_2
08/PRA/DUP/15THFC/T /2025-2026
Open Tender
CIVIL WORKS
Percentage
School gaon Murmah
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,700
28 Aug 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
12 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.500 mm. | 1 | cum | 119.27 | ₹119.15 |
| 2 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. | - | sqm | 50 | - |
| 3 | Cost of stone boulder 150 mm size delivered ans stacked at site. | - | cum | 1,526.4 | - |
| 4 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. (b) River bazree. | - | cum | 6,370.8 | - |
| 5 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. (ii) River bazree. | 1 | cum | 7,238.4 | ₹7,231.16 |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. (a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel. other than SAIL/TATA/RINL/JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel | - | MT | 75,332.4 | - |
| 7 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. . | 1 | sqm | 334 | ₹333.67 |
| 8 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. (ii) with 1:4 cement mortar. (a) 20 mm.thick plaster. | 1 | sqm | 247.2 | ₹246.95 |
| 9 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. | 11.25 | sqm | 40.8 | ₹459 |
| 10 | Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion. | - | cum | 3,964.8 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
SBD.pdf
Tender Documents • 0.43 MB
BOQ_2444606.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].