Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.7 L+₹11,419.87 (2.50%)Admitted-Fee/PreQual/Technical/Finance R O BAGHJOGI LANKER RAINAWARI SRINAGAR | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹5.4 L+₹81,699.25 (17.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹5.6 L+₹1.1 L (23.5%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.0 L
EMD Value
₹18,030
Closing Date
21 Sept 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
BOUNDARY WALL OF GOVT MIDDLE SCHOOL HALAN BLOCK VERINAG
2026_RDPR_324543_13
ENIT108of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹18,030
25 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means hydraulic excavator over areas exceeding 30 cms & upto 5 m in depth 1.5m in width as well as 10 sqm. On plan, disposal of excavated earth upto 1 m, disposed earth to be levelled & neatly dressed( all kinds of soils) | 26.69 | Cum | 256.85 | ₹6,855.33 |
| 2 | P/L of stone soling of tightly hand packed including all carriages | 3.21 | Cum | 900 | ₹2,889 |
| 3 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | 2.86 | Cum | 5,202.4 | ₹14,878.86 |
| 4 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm NSA | 26.65 | Cum | 5,733.6 | ₹1,52,800.44 |
| 5 | Plumbs including all carriages | 6.66 | Cum | 900 | ₹5,994 |
| 6 | Form work for centering and shuttering including propping etc & removal of same | 150.37 | Sqm | 286.35 | ₹43,058.45 |
| 7 | Brick work with FPS bricks of class designation 75 in foundtion & plinth in cement mortar 1:6 (1 cement, 6 coarse sand) including extra for brick work from plinth to floor 1v | 28.48 | Cum | 7,571.55 | ₹2,15,637.74 |
| 8 | Extra for brick work rom plinth to floor 1v level | 28.48 | Cum | 1,455.65 | ₹41,456.91 |
| 9 | 15mm Cement Plaster on the rough side of single or half brick wall of mix 1:6(1 cement:6 fine sand). | 226.73 | Sqm | 286 | ₹64,844.78 |
| 10 | Cement ConcreteM20 1:2:4 (1 cement: 2 coarse sand: 4 graded stone agg) complete 50mm thick with 20mm n/s stone agg crushed coping | 21.8 | Sqm | 528 | ₹11,510.4 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1094894.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .