| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹3.0 L+₹8,752 (3.01%)Rejected-Finance | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | S.PARVATHI L2 | HIGHFIVE ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling and clearing away and carefully stacking materials and useful for Brick / Stone Masonry in cement mortar walls under 3m height etc., complete complying with standard specification and as directed by the departmental officers | 1.5 | Cu.m | 1,000 ₹1,500 | 950 ₹1,425 Lowest |
| 2.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls for Doors & windows including removal of frames, hinges and fastenings etc., complete complying with standard specification.and as directed by the departmental officers | 4.92 | Sq.m | 280 ₹1,377.6 | 270 ₹1,328.4 Lowest |
| 3.00Brick work in Cement Mortar 1:6(one cement and six Msand) Brick work in following Cement Mortar using best quality II class table moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" with a class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification. Brickwork shall be done adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 3.01 | For Foundation and basement | 0.6 | Cu.m | 7,500 ₹4,500 | 7,000 ₹4,200 Lowest |
| 4.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers | 7.1 | Sq.m | 283 ₹2,009.3 | 270 ₹1,917 Lowest |
| 5.00 | Painting Old Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over the existing wall in all floors etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 95.6 | Sq.m | 280 ₹26,768 | 275 ₹26,290 Lowest |
| 6.00 | Painting old wood work with one coat of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 9.3 | Sq.m | 430 ₹3,999 | 401 ₹3,729.3 Lowest |
| 7.00Supplying and fabricating and fixing in position aluminium anodised door with door shutter partly top 2/3 galzed and partly bottom 1/3 panelled door and top with fixed ventilator and frame made out of box section 101.6x44.45x3.18mm thick at 2.319 kg\m door shutter made out of box section 47.1x44.45x2.5mm at 1.292 kg\m for vertical style and top, lock rail sections of size 50 x 44.45 x 2.50mm @ 1.292 Kg/m and bottom section 100.4x44.45x2.50mm at 1.974kg\m using clips of size 17.15x17.27x1.5mm at 0.176 kg\m and using "F (or) H" Section for fixing the aluminium grill with necessary metal screws, rubber beading, strike plate type handle of size 100x30x1.60mm at 0.988 kg\m on both sides tower bolts,lock, hinges, PVC felt and top 2/3 portion with 5.50 mm thick plain glass with aluminium grill 6mm thick including fixed portions and bottom 1/3 portion with one side prelaminated board (MDF) 12mm thick for panel portion with two floor springs, Two door stopper including cost of all materials labour power consumption required for fabrication drilling required for fabrication drilling holes in RCC columns floorslabs masonry wall wherever necessary with power drills to the required extent and make the same to original condition after fixing and as directed. All the aluminium sections are to be anodised with matt finish under electrically controlled condition in accordance with IS 1868-1962 for an average anodic flim thickness of 15 microns etc., complete. The materials should be got approved by the Executive Engineer before use on works. The rate shall be inclusive of all materials, labour for fixing transportation loading, unloading, and all other incidential charges. (Double leaves Door) | |||||
| 7.01 | Single Leaf | 30.6 | Sq.m | 4,500 ₹1,37,700 | 4,350 ₹1,33,110 Lowest |
| 8.00 | Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish of single leaf door with half panelled with 12mm thick both side laminated particle board at bottom and half glazed using 5.50mm thick Plain glass at top.The outer frame shall be with aluminium box section 101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section Vertical & Top rail: 50x44.45x2.50mm @ 1.292 kg/m ,Bottom rail: 100 x44.45 x 2.50mm@ 1.974 kg/m, Lock rail : 50x44.45x2.5mm @ 1.292 kg/m, Alu Clips: 17.15x17.27x1.50mm @ 0.176 kg/m,Alu. Handle: 100x30mm @ 0.988 Kg/m and necessary accessories such as aluminium clips, rubber beading, PVC felt, handle for a length of shutter (both sides), locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm - Each., aluminium tower bolt 200x12mm - 1No., aluminium Hydraulic door closer - 1No ., lock-1No., Door stopper with rubber bush including cost of materials labour charges and power consumption charges required for fabrication including chipping, dismantling and making hole to the required extent in RCC column, beams, masonry with power drill wherever necessary and redoing the damaged portion to the original condition after fixing etc., complete complying with standard specification and as directed by the deparmental officers. All the Alu. Section are to be anodised with matt finish under electricaly controlled conditions in accordance with IS 1868/1962 for an average anatic film thickness of 15 microns etc., complete.Aluminium sections,and furniture fittings shall be got approved by the Executive Engineer incharge. | 4.2 | Sq.m | 5,000 ₹21,000 | 4,800 ₹20,160 Lowest |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
16 Sept 2026, 3:00 pmClosed
EE PWD Kallakurichi
EE PWD Kallakurichi
Providing E-Seva Kendra Arrangements for Temporary Court building at Chinnasalem in Kallakurichi District
2026_PWD_699148_1
4TN6/26-27/F1/Dt.28.08.2026
Open Tender
Civil Works - Buildings
Lump-sum
Kallakurichi
Please refer tender
7 documents required · 7 mandatory
₹0
₹3,000
23 Sept 2026
31 Aug 2026
16 Sept 2026
1 Sept 2026
16 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and clearing away and carefully stacking materials and useful for Brick / Stone Masonry in cement mortar walls under 3m height etc., complete complying with standard specification and as directed by the departmental officers | 1.5 | Cu.m | - | - |
| 2 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls for Doors & windows including removal of frames, hinges and fastenings etc., complete complying with standard specification.and as directed by the departmental officers | 4.92 | Sq.m | - | - |
| 3Brick work in Cement Mortar 1:6(one cement and six Msand) Brick work in following Cement Mortar using best quality II class table moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" with a class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification. Brickwork shall be done adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 3.01 | For Foundation and basement | 0.6 | Cu.m | - | - |
| 4 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers | 7.1 | Sq.m | - | - |
| 5 | Painting Old Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over the existing wall in all floors etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 95.6 | Sq.m | - | - |
| 6 | Painting old wood work with one coat of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 9.3 | Sq.m | - | - |
| 7Supplying and fabricating and fixing in position aluminium anodised door with door shutter partly top 2/3 galzed and partly bottom 1/3 panelled door and top with fixed ventilator and frame made out of box section 101.6x44.45x3.18mm thick at 2.319 kg\m door shutter made out of box section 47.1x44.45x2.5mm at 1.292 kg\m for vertical style and top, lock rail sections of size 50 x 44.45 x 2.50mm @ 1.292 Kg/m and bottom section 100.4x44.45x2.50mm at 1.974kg\m using clips of size 17.15x17.27x1.5mm at 0.176 kg\m and using "F (or) H" Section for fixing the aluminium grill with necessary metal screws, rubber beading, strike plate type handle of size 100x30x1.60mm at 0.988 kg\m on both sides tower bolts,lock, hinges, PVC felt and top 2/3 portion with 5.50 mm thick plain glass with aluminium grill 6mm thick including fixed portions and bottom 1/3 portion with one side prelaminated board (MDF) 12mm thick for panel portion with two floor springs, Two door stopper including cost of all materials labour power consumption required for fabrication drilling required for fabrication drilling holes in RCC columns floorslabs masonry wall wherever necessary with power drills to the required extent and make the same to original condition after fixing and as directed. All the aluminium sections are to be anodised with matt finish under electrically controlled condition in accordance with IS 1868-1962 for an average anodic flim thickness of 15 microns etc., complete. The materials should be got approved by the Executive Engineer before use on works. The rate shall be inclusive of all materials, labour for fixing transportation loading, unloading, and all other incidential charges. (Double leaves Door) | |||||
| 7.01 | Single Leaf | 30.6 | Sq.m | - | - |
| 8 | Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish of single leaf door with half panelled with 12mm thick both side laminated particle board at bottom and half glazed using 5.50mm thick Plain glass at top.The outer frame shall be with aluminium box section 101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section Vertical & Top rail: 50x44.45x2.50mm @ 1.292 kg/m ,Bottom rail: 100 x44.45 x 2.50mm@ 1.974 kg/m, Lock rail : 50x44.45x2.5mm @ 1.292 kg/m, Alu Clips: 17.15x17.27x1.50mm @ 0.176 kg/m,Alu. Handle: 100x30mm @ 0.988 Kg/m and necessary accessories such as aluminium clips, rubber beading, PVC felt, handle for a length of shutter (both sides), locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm - Each., aluminium tower bolt 200x12mm - 1No., aluminium Hydraulic door closer - 1No ., lock-1No., Door stopper with rubber bush including cost of materials labour charges and power consumption charges required for fabrication including chipping, dismantling and making hole to the required extent in RCC column, beams, masonry with power drill wherever necessary and redoing the damaged portion to the original condition after fixing etc., complete complying with standard specification and as directed by the deparmental officers. All the Alu. Section are to be anodised with matt finish under electricaly controlled conditions in accordance with IS 1868/1962 for an average anatic film thickness of 15 microns etc., complete.Aluminium sections,and furniture fittings shall be got approved by the Executive Engineer incharge. | 4.2 | Sq.m | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_840464.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Tendercondiions.pdf
Tender Documents • 1.19 MB
BOQ_840464.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .