Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
14 Aug 2026, 3:00 pm5d left
PROJECTS-REFINERY
Please refer tender document
2600027600-HD-09050
5100027600
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
₹10 L
24 Jul 2026
24 Jul 2026
14 Aug 2026
14 Aug 2026
24 Jul 2026 - 11 Aug 2026
31 Jul 2026
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Excavation Upto 1.5 | Excavation Upto 1.5 — Earthwork excavation below ground level for all types ofsoil (excluding soft and hard rock) for foundations,trenches, pavements, footings, and allied works, up to 1.5m depth, including removal of vegetation/debris, dressingof sides, leveling, grading, ramming of bottoms,dewatering, keeping surface dry, disposal or stacking ofsurplus excavated material within 100 m lead, and providingtemporary support to existing services such aswater/sewage/electric/underground cables, complete as perdirections (excluding shoring and strutting). | - | cubic meter |
| 2 | Excavation 1.5 - 3 m | Excavation 1.5 - 3 m — Earthwork excavation below ground level for all types ofsoil (excluding soft and hard rock) for foundations,trenches, pavements, footings, and allied works, up to 3.0m depth, including removal of vegetation/debris, dressingof sides, leveling, grading, ramming of bottoms,dewatering, keeping surface dry, disposal or stacking ofsurplus excavated material within 100 m lead, and providingtemporary support to existing services such aswater/sewage/electric/underground cables, complete as perdirections (excluding shoring and strutting). | - | cubic meter |
| 3 | Excavation beyond 3m | Excavation beyond 3m — Earthwork excavation below ground level for all types ofsoil (excluding soft and hard rock) for foundations,trenches, pavements, footings, and allied works, above/beyond 3.0m depth, including removal of vegetation/debris,dressing of sides, leveling, grading, ramming of bottoms,dewatering, keeping surface dry, disposal or stacking ofsurplus excavated material within 100 m lead, and providingtemporary support to existing services such aswater/sewage/electric/underground cables, complete as perdirections (excluding shoring and strutting). | - | cubic meter |
| 4 | Mnual Excvtion 0-2m | Mnual Excvtion 0-2m — Earth work in EXCAVATION below ground level for all kindsof works inALL TYPES OF SOILS EXCEPT SOFT ROCK AND HARDROCK for a depth upto 2.0mincluding removal of vegetation,shrubs and debris, cutting anddressing of sides in slopes,levelling, grading and ramming ofbottoms, dewatering ofaccumulated water from any source and keeping thesurfacedry for subsequent works and disposal or stacking ofexcavatedmaterial within a lead of 100m, as directedincluding providingtemporary supports to existing servicelines like water pipes, sewagepipes, electric overhead andunderground cables etc. all complete, butexcluding shoringand shuttering. All Safety precautions related usageofINSULATED TOOLS, HAND GLOVES & GUM BOOTS to been ensured byagency,all include in the item. (Excavation is to be doneby Manual means ONLY) | - | cubic meter |
| 5 | Mnual Excvtion 2-4m | Mnual Excvtion 2-4m — Earth work in EXCAVATION below ground level for all kindsof works inALL TYPES OF SOILS EXCEPT SOFT ROCK AND HARDROCKfor a depth beyond 2.0mto 4.0m including removal ofvegetation, shrubs and debris, cutting anddressing of sidesin slopes, levelling,grading and ramming ofbottoms,dewatering of accumulated water from any source andkeeping the surfacedry for subsequent works and disposal orstacking of excavated materialwithin a lead of 100m, asdirected including providing temporarysupports to existingservice lines like water pipes, sewage pipes,electric overhead and underground cables etc. all complete, butexcludingshoring and shuttering.All Safety precautions related usageofINSULATED TOOLS, HAND GLOVES & GUM BOOTS to be ensured byagency, allinclude in the item. (Excavation is to be doneby Manual means only) | - | cubic meter |
| 6 | B/F after Execution | B/F after Execution — Backfilling/filling with available excavated soil intrenches, plinths, foundations, pits, and allied works, inlayers not exceeding 15 cm thickness, includingre- excavating deposited soil, breaking clods, spreading,watering, manual or mechanical ramming/compaction toachieve 90% maximum dry density, dressing, and trimming,with disposal within 100 m lead, complete as perEngineer-in-Charge directions. | - | cubic meter |
| 7 | T/D of Earth | T/D of Earth — Transportation of surplus excavated earth, debris, silt, ormud from the work site beyond the initial lead of 100 m,including re-excavation of previously deposited material,loading, conveying by tractor trolley/truck, unloading, anddisposal Inside the Refinery premises at locationsapproved by the Municipal Corporation, including levelingand dressing of the area from where material is removed,complete in all respects as per the directions of theEngineer-in-Charge. | - | cubic meter |
| 8 | T/D Outside Plant Bo | T/D Outside Plant Bo — Transportation of surplus excavated earth, debris, silt, ormud from the work site beyond the initial lead of 100 m,including re-excavation of previously deposited material,loading, conveying by tractor trolley/truck, unloading, anddisposal outside the Refinery premises at locationsapproved by the Municipal Corporation, including levelingand dressing of the area from where material is removed,complete in all respects as per the directions of theEngineer-in-Charge. | - | cubic meter |
| 9 | PCC M20 | PCC M20 — Supplying and laying Plain Cement Concrete in theproportion 1:1.5:3 (1 part cement : 1.5 parts fineaggregate : 3 parts hard blue granite machine-crushed metalof 20 mm nominal size) in foundations, footings, plinthbeams, pavements, and allied works up to plinth level,including mixing, placing, compacting, finishing, andcuring, complete, excluding formwork (shuttering) andreinforcement, using Portland Slag Cement conforming to IS:455, and concrete work executed in accordance with IS: 456,as per specifications and directions of theEngineer-in-Charge. | - | cubic meter |
| 10 | M35 SCC - RMC Grade | M35 SCC - RMC Grade — """Providing and laying REINFORCED CEMENT CONCRETE all depthsbelow and above plinth level OF M-35 GRADE in SELFCOMPACTING REINFORCED CONCRETE with 20 mm and down sizegraded crushed stone aggregates/ gravel in foundations,rafts, beams, slabs, pile caps, retaining walls, dykewalls, jambs, counterforts, buttresses, pedestals, pipesleepers, columns, suspended floors, staircases, landings,steps, brackets etc., including equipment/ machinefoundations & pedestals viz. compressors, ID & FD fans,pumps, generators, crushers, mills, trenches, culverts,manholes, pipe encasement, catchpits, drains, pits, etc.,(including single pour concreting as specified on thedrawing), applying cement wash on concrete surface(wherever no other surface application is specified),providing pockets, openings, recesses, chamfering, etc.,wherever required, vibrating, tamping, curing and renderingif required to give a smooth and even surface also includesAdmiture cost etc. (EXCLUDING THE COST OF REINFORCEMENT,SHUTTERING) for all depths below and above plinth level inany shape, position thickness etc. all complete asspecified, shown and directed. All materials, includingcement, are supplied by the contractor.Boom placer forconcreting shall be used to ensure faster execution of theproject.""" | - | cubic meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2600027600-HD-09050.pdf
TENDER_DOCUMENT • 19.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].