Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SOLE₹10.8 LAccepted-AOC 0 NARA MEERUT ROAD MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | SOLE | Accepted-AOC - |
Tender Value
Refer Docs
Closing Date
12 Oct 2020, 3:00 pmClosed
DGM (C)
3rd floor, admin building, barauni refinery, begusarai - 851114, bihar
Root cause analysis of Failures and other problems being faced in M/S ISGEC make Boiler no-5.
2020_BR_124426_1
BCCM204702
Single
Mechanical Works
Works
45 days
Barauni Refinery
Please refer Tender documents.
5 documents required · 5 mandatory
Exempted
16 Nov 2020
28 Sept 2020
13 Oct 2020
28 Sept 2020
12 Oct 2020
6 Oct 2020
28 Sept 2020 - 5 Oct 2020
Amount
Study of root cause of Boiler-5 failure
1.Site visit to understand actual condition of the existing boiler and its auxiliaries. 2.Analysis of boiler performance data/ trends / log sheet readings. 3.Isgec engineer will collect all data required for feasibility study during last running conditions. 4.Required fine tuning will be recommended by Isgec engineer to understand the boiler performance while firing trial run operation, the same will be recorded. 5.Study about the water, steam, air & flue gas parameters during trial run of boiler and the same will be recorded. 6.Physical visual inspection and thickness survey of Complete Boiler components i.e. Boiler Drum, Raiser, water wall, mud drum, primary super heater tube, secondary super heater tubes, economizer, de-super heater, etc. under shutdown condition and any abnormalities, important dimensions will be recorded for further analysis. 7.Study of present burner management system, Soot blowing system LRSB & RSB) 8.If any relevant Drawing or Data is not available, physical measurement will be taken at Site. 9.Collection of boiler design, construction data, auxiliary equipment's data & operation data for feasibility study & analysis. 10.Inspection of the Duct & stack. 11.Based on the site visit & data collection as mentioned points the following work will be carried out. a.Performance calculation of existing boiler and areas of modification will be identified b.Flue gas/ water & steam temperature/ draft profile for analysis of variances. c.Pressure Parts modifications analysis & Circulation calculations is to be reviewed. d.Existing boiler interlocks & adequacy is to be reviewed. e.Adequacy of pressure parts items, auxiliaries will be reviewed & modification will be identified. f.Study of the existing structure and providing recommenation g.Preparation of study report.
To and fro charges from Delhi to Patna by Air (economy class) shall be reimursed as per actuals on submission of tickets and original boarding passes which shall be Invoiced upto maximum SOR amount. Boarding & loadging will be arranged at IOCL guest house.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_134520.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .