Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.9 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹70.7 L+₹2.9 L (4.21%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹70.7 L
EMD Value
₹71,000
Closing Date
3 May 2023, 3:00 pmClosed
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Periodic Renewal of 2 Rural Roads in Pallipettai and Vilangadu Panchayats in Acharapakkam Block of Chengalpattu District Having PKG No.10
2023_RDTN_301577_1
Rc.No.1380.2023.A9 Dated 05.04.2023
Open Tender
Civil Works - Roads
Item Rate
90 days
Acharapakkam Block
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹71,000
O/o The Project Director DRDA Chengalpattu
22 Jun 2023
12 Apr 2023
3 May 2023
12 Apr 2023
3 May 2023
12 Apr 2023
21 Apr 2023
Amount
Part I:Periodic Renewal of Existing BT road - NH45 to Pallipettai Road (km - 0/0-1/00) Construction cost: Rs.20.00 Lakh Maintenance cost:Rs.3.60 Lakh
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying
Providing and laying tack coat over WMM surface using 3.00kgs. of emusion for 10 sqm.area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MOST specification
Providing and laying Bitumenus Concrete 25mm thick using using 0.24cum of 13.2mm, 0.76 cum of 11.20mm , 6.7,6,5.6&4.75 mm 0.66 cum and 2.36 mm 0.34 cum of metal for mixing of Bitumen per 1 cum including cost and conveyance to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete PAVER FINISHER
Filling with US Gravel for side berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free form streaks and holes etc complete as per MORT&H specification no.803
Supplying and fixing of KM stone of size 1.65 x 0.45 x 0.15m
Supplying and fixing of HM stone of size 0.75x 0.23x 0.10m
Providing and construction of Speed Breaker using bituminous concrete as per the standard sepcifications
CC pavement at ch 0/900-1/000
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
Part II:Periodic Renewal of Existing BT road - A.A road to Kottakayapakkam Road (km - 0/0-2/00) Construction cost: Rs.39.85 Lakh Maintenance cost:Rs.7.20 Lakh
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying
Providing and laying tack coat over WMM surface using 3.00kgs. of emusion for 10 sqm.area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MOST specification
Providing and laying Bitumenus Concrete 25mm thick using using 0.24cum of 13.2mm, 0.76 cum of 11.20mm , 6.7,6,5.6&4.75 mm 0.66 cum and 2.36 mm 0.34 cum of metal for mixing of Bitumen per 1 cum including cost and conveyance to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete PAVER FINISHER
Filling with US Gravel for side berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free form streaks and holes etc complete as per MORT&H specification no.803
Supplying and fixing of KM stone of size 1.65 x 0.45 x 0.15m
Supplying and fixing of HM stone of size 0.75x 0.23x 0.10m
Providing and construction of Speed Breaker using bituminous concrete as per the standard sepcifications
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
DEEPAM CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .