Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.4 L
EMD Value
₹8,720
Closing Date
12 Oct 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer TLMD-II Pampore
TLMD-II Pampore
Dismantling of damaged tower foundation and laying of the same of (B) type foundation at tower location 295 of 132 KV Mirbazar Tethar Transmission line under the jurisdiction of TLMD-II Pampore
2020_PDD_105590_1
TLMD-II/18 of 2020
Open Tender
Electrical Works
Item Rate
15 days
132 KV Mirbazar Tethar Transmission Line
Please refer Tender documents.
4 documents required · 4 mandatory
₹300
Yes
Executive Engineer TLMD-II Pampore
₹8,720
Yes
13 Oct 2020
28 Sept 2020
13 Oct 2020
28 Sept 2020
12 Oct 2020
28 Sept 2020
180 days
Amount
Jungle clearance of land around tower area 20x20m
Excavation of foundation pits
15% hard/dense rock
35% hard/dense rock
50% hard dense rock
Disposal of excavated soil within 25mtrs
Bending, fixing and binding of reinforce.
Concreting of tower foundation.
Benching of uneven foundation area 40% hard/dense soil
60% hard/dense soil
Stub setting of tower foundations
Form work of steel shuttering.
Coping & curring of tower foundations
Back filling
Making of temporary path 2 mtr wide with average length 1kms per tower in hilly/semi hilly areas & 0.3 km per tower in plain, partially and F/S areas
Jungle clearance of 40% area
Surface dressing of 60% area
Making steps in 25% of path area in hilly and semi hilly area = 0.25x 500x2x0.3x0.2
50% dense / hard soil
50% disintregrated
Manaul carriage of constructional material at an average of 0.3 km
Sand (0.45 of concrete vol.)+5% wastage for plain and 10% for hilly & semi hilly terrains
Bajree (0.90 of concrete vol)+5% wastage for plain and 10% for hilly & semi hilly terrains
Back carriage of earth (disposed vide item 3 less by disintegrated/soft rock) for back filling 25 mtr lead.
Good earth 1.00 km lead
Water for curring @ 1.22 Kl of conc. volume + 1.5% for back filling +20% wastage (average lead 1 km)
Cement (average lead 1.0km)
Form boxes
T&P accessories
Steel for reinforcement
Cost of constructional material
Cement
Reinfrocement steel
Bajree
Good earth
Mechanical carriage average 20km lead
Bajree
Earth
Watch and ward of Material
Dismantling oif Existing Tower Foundation including disposal of dismantlled material upto a lead of 300 meters
CORE CONSTRUCTION
MOHD YOUSUF KUCHAY
stage.html
html • 0.02 MB
finance_201500.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .