Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance | L1 | Accepted-Finance First Lowest | |
| 2 | L2₹2.2 L+₹15,826.80 (7.58%)Accepted-Finance | L2 | Accepted-Finance Second Lowest | |
| 3 | L3₹2.6 L+₹54,339 (26.0%)Accepted-Finance | L3 | Accepted-Finance Third Lowest |
Tender Value
₹3.5 L
Closing Date
26 Aug 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Officer CAD Jammu
Project Officer CAD Jammu
Remodeling and Reconstruction of field channel at chak ram
2021_APD_134357_1
E-Nit No. 08 of 2021-22
Open Tender
Civil Works
Item Rate
90 days
Kathua
As per SBD or NIT
2 documents required · 2 mandatory
₹600
Project Officer CAD Jammu
Exempted
28 Aug 2021
13 Aug 2021
27 Aug 2021
17 Aug 2021
26 Aug 2021
17 Aug 2021
17 Aug 2021 - 20 Aug 2021
90 days
Amount
Dismantling concrete grouted stone pitching in aprons drains etc. including stacking of serviceable material and disposal of unserviceablematerial, stacking /disposal lead upto 100 meters
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Dumping stone excluding cost of stones.in Horizontal on level
Dumping stone including cost of stones.Stone Boulder 225 mm
Dumping stone including cost of stones.Stone Boulder 225 mm Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.40mm thick with 20 mm nominal size stone aggregate.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m
Carriage of material by Mech . Tpt (B) a) Cement from 15 Km
Carriage of material by Mech . Tpt (B) b) Bajri and sand from 20 Km
Carriage of material by Mech . Tpt (B) c) Stone from 15 Km
Carriage of material by HL (C) a) Cement from 100 mtr
Carriage of material by HL (C) b) Bajri and Sand from 100 mtr
Carriage of material by HL (C) b)Stone from 100 mtr
SANJEEV KUMAR SHARMA
M/S NARIAN DASS GOVT CONTRACTOR
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .