Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-Finance | ₹37.4 L | L1 | Accepted-Finance as per boq |
| 2 | L2₹41.6 L+₹4.2 L (11.3%)Accepted-Finance | ₹41.6 L+₹4.2 L (11.3%) | L2 | Accepted-Finance as per boq |
| 3 | L3₹44.9 L+₹7.5 L (20.1%)Accepted-Finance | ₹44.9 L+₹7.5 L (20.1%) | L3 | Accepted-Finance as per boq |
| 4 | L4₹47.5 L+₹10.1 L (27.1%)Accepted-Finance DHARGLOON MENDHAR | ₹47.5 L+₹10.1 L (27.1%) | L4 | Accepted-Finance as per boq |
| 5 | L5₹47.6 L+₹10.2 L (27.2%)Accepted-Finance | ₹47.6 L+₹10.2 L (27.2%) | L5 | Accepted-Finance as per boq |
Tender Value
₹60.3 L
EMD Value
₹1.2 L
Closing Date
30 Jul 2026, 6:00 pmClosed
Executive Engineer
JKPHC JAMMU
Construction of RCC Protection wall behind CISF barracks at District Jail Poonch ( C. No.03-B)
2026_DGPJK_316117_2
03 of PHC JAMMU DIV /2026-27 Dated 15-07-2026
Open Tender
Civil Works
Percentage
180 days
POONCH
REFER PQ TERMS AND CONDITIONS
3 documents required · 3 mandatory
₹3,000
Executive Engineer, JKPHC Division Jammu
₹1.2 L
Executive Engineer, JKPHC NARWAL JAMMU
6 Aug 2026
15 Jul 2026
31 Jul 2026
15 Jul 2026
30 Jul 2026
15 Jul 2026
15 Jul 2026 - 18 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 904.55 | cum | 191.95 | ₹1,73,628.37 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 904.55 | cum | 221.35 | ₹2,00,222.14 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 31.95 | cum | 5,202.9 | ₹1,66,232.66 |
| 4 | Providing and back filing of stone behind the retaining wall including all carriages and costs of material involved complete | 117.98 | cum | 1,000 | ₹1,17,980 |
| 5 | providing and fixing in position PCV 4" pipes as weep holes in the retaining wall ….complete job as directed by EIC | 191.52 | rft | 120 | ₹22,982.4 |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 159.11 | cum | 9,395.7 | ₹14,94,949.83 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)` | 99.01 | cum | 7,788.4 | ₹7,71,129.48 |
| 8Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 8.01 | Foundations, footings, bases of columns etc. for mass concrete. | 52.92 | sqm | 286.35 | ₹15,153.64 |
| 8.02 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 812.86 | sqm | 628.95 | ₹5,11,248.3 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_1029386.xls
BOQ • 0.30 MB
EXTENSIONNOTICE.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .