Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹39.0 LSame as L1Rejected-Finance N A | NA | NA | 121004 | L2 | Rejected-Finance L2 | |
| 3 | L2₹39.0 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 4 | L2₹39.0 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹45.9 L
EMD Value
₹1.4 L
Closing Date
28 Feb 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Ward 25, Ambedkar Nagar, from street no. 04 A-253, street no. 09 from house no. 38, street no. 07 from house no. 09 and from Narendra Mohit Medical to T point, road improvement work by drain and interlocking tiles.
2026_DOLBU_1113580_47
107/Nirman/2025-26 Date 16.01.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,252
₹1.4 L
6 Jun 2026
9 Feb 2026
28 Feb 2026
9 Feb 2026
28 Feb 2026
9 Feb 2026
Demolishing reinforced cement concrete Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in -charge.
Demolishing Brick work in cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Earth Work in Embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkment to in 20 cm layers including remming and dressing the surface to required levels and slops also including 1.50 m lift and 30 m lead. The earth form cutting to be used in making in embekment or to be disposited and spoil banks with in 30 M. distance as directed by the engineer in charge etc all complete as per the direction of engineer in charge.
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
Deduct the cost of old interlocking tiles.
Disposal of refused material lead up to 8 km distance including loading un loading etc etc all completed as per the direction of engineer - in - charge.
S/L Concrete (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials,labour,tools, & plant etc all completed as per the direction of engineer - in - charge.
R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.
S/F M:S (tor steel or plain) in plain work such as R:C:C or R:B work including bending for proper shape as necessary including bending for proper complition of the work and including supply of all steel & wasteage, bend, hooks, and authorised overlappinf shall be measured etc all complete as per direction of engineer in charge.
S/S of 22.4-53mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge
Consoliadtion of stone ballast.
Construction of un-reinforced dowl jointed at expansion and construction join only plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 jmm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, approaches near to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using Curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause1501
S/L Brick Work (1:4) with m 150 brick, coarse sand & cement including all materials,labour,tools, & plant etc all completed as per the direction of engineer - in - charge.
S/L 12 mm thick plaster (1:3) with cement & coarse sand including all materials,labour,tools, & plant etc all completed as per the direction of engineer - in - charge.
S/L Cement Concrete (1:2:4) with 2 cm gauge stone grit coarse sand and cement including all materials,labour,tools, & plant etc all completed as per the direction of engineer - in - charge.
Deduction of old bricks bats.
Deduction of old bricks.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
T1-T2-T3.pdf
Additional Documents • 2.77 MB
BOQ_2062483.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .