Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 LAccepted-AOC | L1 | Accepted-AOC Awarded being lowest bidder | |
| 2 | L2₹30.9 L+₹54,113 (1.78%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹41.6 L+₹11.2 L (36.9%)Rejected-AOC | L3 | Rejected-AOC Rejected | |
| 4 | L4₹45.6 L+₹15.2 L (50.0%)Rejected-AOC PLOT NO 4 SUDARSHAN ROW RESIDENCY GAWADE MALA PIPELINE ROAD SAVEDI AHMEDNAGAR 414003 | AHMEDNAGAR | AHMEDNAGAR | MAHARASHTRA | 414003 | L4 | Rejected-AOC Rejected | |
| 5 | L5₹50.9 L+₹20.5 L (67.4%)Rejected-AOC | L5 | Rejected-AOC Rejected |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
14 Aug 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer North Ahmednagar
Military Engineer Services Garrison Engineer North Nagar-Pathardi Road Opp Ahmednagar Fort Ahmednagar-414002
Repairs replacement and maintenance of certain items of external water supply in the area of AGE B/R I under GE (N) Ahmednagar
2020_MES_359845_1
8440 / E8
Open Tender
Miscellaneous Works
Item Rate
270 days
Ahmednagar
Class D a (ii)
8 documents required · 8 mandatory
₹500
Yes
Garrsion Engineer North Ahmednagar
₹70,000
Yes
5 Sept 2020
11 Jul 2020
17 Aug 2020
11 Jul 2020
14 Aug 2020
27 Jul 2020
60 days
Amount
Excavation in trenches n' exc 1.5 m wide and n' exc 1.5 m in depth and n' exc 10 Sq m on plan and getting out in Soft / loose soil etc complete all as specified and directed by Engineer-in-Charge
All as per serial item No 01 (here-in-before) but in Hard / dense soil
Returning, filling in excavated material (soil) including spreading, levelling, watering and well ramming in layers not exc 25 cm etc complete all as specified and directed by Engineer-in-Charge
Removing excavated material to a distance n' exc 50 m and depositing at a level n exc 1.5 m above the starting point etc complete all as specified and directed by Engineer-in-Charge
Taking up or down GI steel tubing and connections from trenches / walls / floors etc cleaning serviceable pipe for refixing 100 mm bore pipe etc complete all as specified and directed by Engineer-in-Charge
All as per item No 05 (here-in-before) but 80mm bore pipe
All as per serial item No 05 (here-in-before) but 50 mm bore pipe
All as per serial item No 05 (here-in-before) but 40 mm bore pipe
All as per serial item No 05 (here-in-before) but 25mm bore pipe
All as per serial item No 05 (here-in-before) but 20 mm bore pipe
All as per serial item No 05 (here-in-before) but 15 mm bore pipe NOTE for item Nos 05 to 11 : Earth work & excavation shall be measured and paid separately & Earth work & excavation shall be manual or with mechanical equipments such as pockland, JCB etc, (i) The contractor/his supervisor will report the office on 09.00 clock morning every day to collect the complaints from JE and will render the completion within 12 hours failing which 500 Rupees per day will be charged as an penalty & the same will be recovered from contractor. (ii). The contractor and his supervisor will provide the mobile number so that they can be communicated about the complaints, the SMS will be sent on those mobile and will be treated as an official complaints. The contractor will render the completion in writing to the department within 12 hours failing which 500 Rupees per day charged as penalty .
Supply and fix GI pipe, medium grade including necessary fittings such as sockets, elbows, tees, reducers, unions, nipples etc laid in trenches / floors or fixed to wall etc for the 100 bore pipe etc complete all a s specified and directed by Engineer-in-Charge.
All as per serial item No 12 (here-in-before) but 80 mm bore pipe
All as per serial item No 12 (here-in-before) but 50 mm bore pipe
All as per serial item No 12 (here-in-before) but 40 mm bore pipe
All as per serial item No 12 (here-in-before) but 25mm bore pipe
All as per serial item No 12 (here-in-before) but 20 mm bore pipe
All as per serial item No 12 (here-in-before) but 15 mm bore pipe
All as per serial item No 12 (here-in-before) but using old servicable pipe retrieved pipe from srl item No 5 (here-in-before) with new GI fittings.
All as per serial item No 13 (here-in-before) but using old retrieved pipe from srl item No 6 (here-in-before) with new GI fittings.
All as per serial item No 14 (here-in-before) but using old retrieved pipe from srl item No 7 (here-in-before) with new GI fittings.
All as per serial item No 15 (here-in-before) but using old retrieved pipe from srl item No 8 (here-in-before) with new GI fittings.
All as per serial item No 16 (here-in-before) but using old retrieved pipe from srl item No 9 (here-in-before) with new GI fittings.
All as per serial item No 17 (here-in-before) but using old retrieved pipe from srl item No 10 (here-in-before) with new GI fittings.
All as per serial item No 18 (here-in-before) but using old servicable pipe retrieved from srl item No 11 (here-in-before) with new GI fittings. NOTE for item Nos 12 to 25 : Earth work & excavation has already been considered under srl item Nos 5 to 11. (i) The contractor/his supervisor will report the office on 09.00 clock morning every day to collect the complaints from JE and will render the completion within 12 hours failing which 500 Rupees per day will be charged as an penalty & the same will be recovered from contractor. (ii). The contractor and his supervisor will provide the mobile number so that they can be communicated about the complaints, the SMS will be sent on those mobile and will be treated as an official complaints. The contractor will render the completion in writing to the department within 12 hours hours failing which 500 Rupees per day charged as penalty .
Taking down cast iron / ductile iron water mains with spigot and socket ends having lead / tyton joints including all fittings and burning out joints, removing lead for 80 bore of pipes etc complete all as specified and directed by Engineer-in-Charge
All as per serial item No 26 (here-in-before) but 100 mm bore pipe
All as per serial item No 26 (here-in-before) but 150 mm bore pipe
All as per serial item No 26 (here-in-before) but 200 mm bore pipe
All as per serial item No 26 (here-in-before) but 250 mm bore pipe
All as per serial item No 26 (here-in-before) but 300 mm bore pipe. NOTE for item Nos 26 to 31 : Earth work & excavation shall be measured and paid separately under relevant item of this BOQ (manual / by using pockland / JCB etc) (i) The contractor/his supervisor will report the office on 09.00 clock morning every day to collect the complaints from JE and will render the completion within 12 hours failing which 500 Rupees per day will be charged as an penalty & the same will be recovered from contractor. (ii). The contractor and his supervisor will provide the mobile number so that they can be communicated about the complaints, the SMS will be sent on those mobile and will be treated as an official complaints. The contractor will render the completion in writing to the department within 12 hours hours failing which 500 Rupees per day charged as penalty .
Supply and laying cast iron / ductile iron pipes with spigot and socket ends centrifugally cast, Class LA / K-9 , in any length, laid in trenches for 80 mm bore pipes etc complete all as specified and directed by Engineer-in-Charge. NOTE: Cost of Lead Joints and Tyton Joints is included in the quoted rate.
All as per serial item No 32 (here-in-before) but using old servicable pipe retrieved from srl item No 26 (here-in-before) with new tyton joints.
All as per serial item No 32 (here-in-before) but 100 mm bore pipe
All as per serial item No 34 (here-in-before) but using old servicable pipe retrievedfrom srl item No 27 (here-in-before) with new tyton joints.
All as per serial item No 32 (here-in-before) but 150 mm bore pipe
All as per serial item No 36 (here-in-before) but using old servicable pipe retrieved from srl item No 28 with new tyton joints.
All as per serial item No 32 (here-in-before) but 200 mm bore pipe
All as per serial item No 38 (here-in-before) but using old servicable pipe retrieved from srl item No 29 with new tyton joints.
All as per serial item No 32 (here-in-before) but 250 mm bore pipe
All as per serial item No 40 (here-in-before) but using old servicable pipe retrieved from srl item No 30 (here-in-before) with new tyton joints.
All as per serial item No 32 (here-in-before) but 300 mm bore pipe
All as per serial item No 42 (here-in-before) but using old unserviceable retrieved pipe from srl item No 31 (here-in-before) with new tyton joints. NOTE for items 32 to 43 : (i) Earth work & excavation has already been considered. (i)Earth work & excavation shall be measured and paid separately & Earth work & excavation shall be manual or with mechanical equipments such as pockland, JCB etc, (iii) The contractor/his supervisor will report the office on 09.00 clock morning every day to collect the complaints from JE and will render the completion within 12 hours failing which 500 Rupees per day will be charged as an penalty & the same will be recovered from contractor. (iv). The contractor and his supervisor will provide the mobile number so that they can be communicated about the complaints, the SMS will be sent on those mobile and will be treated as an official complaints. The contractor will render the completion in writing to the department within 12 hours hours failing which 500 Rupees per day charged as penalty .
Repairs/rectification of leakage of GI Pipe by replacing short piece length up to 0.50 m in wall/floors etc and excavation upto 1 cum as in trenches and including providing unions, reducers,nipples etc for 15 mm bore pipe and making necessary connections to make it functional etc complete all as specified and directed by Engineer-in-Charge
All as per serial item No 44 (here-in-before) but 20 mm bore pipe
All as per serial item No 44 (here-in-before) but 25 mm bore pipe
All as per serial item No 44 (here-in-before) but 40 mm bore pipe
All as per serial item No 44 (here-in-before) but 50 mm bore pipe
Material and labour for opening of unserviceable sluice valves, cleaning the serviceable parts, adjusting of moving parts , greasing , re-assembling of valve and fixing to the desired position with and including replacement of rubber gaskets, nuts ,bolts, washers and gland packing suitable for 80 mm bore valve etc complete all as specified and directed by Engineer-in-Charge
All as per serial item No 49 (here-in-before) but 100 mm bore pipe
All as per serial item No 49 (here-in-before) but 150 mm bore pipe
All as per serial item No 49 (here-in-before) but 200 mm bore pipe
All as per serial item No 49 (here-in-before) but 250 mm bore pipe
All as per serial item No 49 (here-in-before) but 300 mm bore pipe
Supply and fix in repairs cast iron sluice valve ,80 mm bore , Class PN1, ISI marked with stainless steel spindle, both ends flanged including rubber gasket, nuts, bolts and washers etc complete all as specified and directed by Engineer-in-Charge.
All as per serial item No 55 (here-in-before) but 100 mm bore pipe
All as per serial item No 55 (here-in-before) but 150 mm bore pipe
All as per serial item No 55 (here-in-before) but 200 mm bore pipe
All as per serial item No 55 (here-in-before) but 250 mm bore pipe
All as per serial item No 55 (here-in-before) but 300 mm bore pipe
Material and labour for run lead joints in old /new pipes / specials for 80 mm bore pipes etc complete all as specified and directed by Engineer-in-Charge
All as per serial item No 61 (here-in-before) but 100 mm bore pipe
All as per serial item No 61 (here-in-before) but 150 mm bore pipe
All as per serial item No 61 (here-in-before) but 200 mm bore pipe
All as per serial item No 61 (here-in-before) but 250 mm bore pipe
All as per serial item No 61 (here-in-before) but 300 mm bore pipe NOTE for items 61 to 66 : Earth work & excavation has already been considered.
Material and labour for Caulking lead joints including run lead for arresting the leakages for 80mm bore pipes etc complete all as specified and directed by Engineer-in-Charge
All as per serial item No 67 (here-in-before) but 100 mm bore pipe
All as per serial item No 67 (here-in-before) but 150 mm bore pipe
All as per serial item No 67 (here-in-before) but 200 mm bore pipe
All as per serial item No 67 (here-in-before) but 250 mm bore pipe
All as per serial item No 67 (here-in-before) but 300 mm bore pipe NOTE for items 67 to 72 : Earth work & excavation has already been considered. (v) The contractor/his supervisor will report the office on 09.00 clock morning every day to collect the complaints from JE and will render the completion within 12 hours failing which 500 Rupees per day will be charged as an penalty & the same will be recovered from contractor. (vi). The contractor and his supervisor will provide the mobile number so that they can be communicated about the complaints, the SMS will be sent on those mobile and will be treated as an official complaints. The contractor will render the completion in writing to the department within 12 hours hours failing which 500 Rupees per day charged as penalty .
Supply and fixing in repairs of graphite gland packing for sluice valve 80 mm bore etc complete all as specified and directed Engineer-in-Charge
All as per serial item No 73 (here-in-before) but 100 mm bore pipe
All as per serial item No 73 (here-in-before) but 150 mm bore pipe
All as per serial item No 73 (here-in-before) but 200 mm bore pipe
All as per serial item No 73 (here-in-before) but 250 mm bore pipe
All as per serial item No 73 (here-in-before) but 300 mm bore pipe. NOTE for items 73 to 78 : Glands packing shall be provided to the valve other than considered under srl item Nos 49 to 54
Supply and fixing in repairs mechanical joints, non extendable type with rings, nuts , bolts & washers etc for 80 mm bore CI / DI pipes etc complete all as specified and directed by Engineer-in-Charge
All as per serial item No 79 (here-in-before) but 100 mm bore pipe
All as per serial item No 79 (here-in-before) but 150 mm bore pipe
All as per serial item No 79 (here-in-before) but 200 mm bore pipe
All as per serial item No 79 (here-in-before) but 250 mm bore pipe
All as per serial item No 79 (here-in-before) but 300 mm bore pipe
Material and labour in repairs gun metal gate valve/brass stop valve, high pressure both ends screwed down with crunch or butterfly handle with suitable size sockets on both ends nipples, unions, etc suitable for up to 50 mm bore GI pipe etc complete all as specified and directed by Engineer-n-Charge.
All as per serial item No 85 (here-in-before) but 40 mm bore pipe
All as per serial item No 85 (here-in-before) but 25 mm bore pipe
All as per serial item No 85 (here-in-before) but 20 mm bore pipe
All as per serial item No 85 (here-in-before) but 15 mm bore pipe
Dismantaling old valve chamber & M & L for Construction of PCC solid block valve chamber including earth work described as under complete all as specified for the following internal size as under : (a) 100 mm thick hard core in foumdation (b) PCC in foundation (1:4:8) type D2 (using 40 mm graded stone aggergate) (c) 200 mm thick block masonary built in cement and sand mortar (1:6), (d) 15 mm thick internal and external plaster in cement and sand mortar (1:4), (e) 3mm thick MS sheet chamber cover and 50 x 50 x 6 mm thick angle iron frame including painting with two coats of synthetic enamel paint over one coat of red oxide primer on all exposed surfaces including locking arrangments.
1500 mm x 1200 mm x 1000 mm
1500 mm x 1100 mm x 1000 mm
1500 mm x 1000 mm x 1000 mm
Drilling and tapping cast iron / ductile iron water mains, in position, for branch connections of the internal dia 20 to 50 mm etc complete all as specified and directed by Engineer-in-Charge
Taking up or down PVC tubing and connections from trenches /walls/floors etc cleaning for 80mm bore pipe etc complete all as specified and directed by Engineer-in-Charge.
Taking up or down PVC tubing and connections from trenches /walls/floors etc cleaning for 100mm bore pipe etc complete all as specified and directed by Engineer-in-Charge
Taking up or down PVC tubing and connections from trenches /walls/floors etc cleaning for 150mm bore pipe etc complete all as specified and directed by Engineer-in-Charge
Supply and fix in repairs of PVC pipe of size 80 mm heavy duty, 4 kg / sqcm pressure of the following dia including necessary fittings etc complete all as specified and directed by Engineer-in-Charge:-
All as per Sl item No 98 (here-in-before) but for 100 mm
All as per Sl item No 98 above but for 150 mm NOTE for item Nos 95 to 97 : Earth work & excavation shall be measured and paid separately under relevant item of this BOQ
Supply & fixing in replacement of CI foot valves of size 80 mm etc complete all as specified and directed by Engineer-in-Charge
Material and labour for cast iron / ductile iron specials such as bends of any type, radius and angle, tapers any type, straight, bend, increasing, decreasing or double socket etc, tail pieces, single branch, "Y" junctions, double branch, cross (all sockets or socket and spigot) collars, caps and plugs etc suitable for CI / DI pipes class LA upto 300 mm more pipes etc complete all as specified and directed by Engineer-in-Charge
Cutting cast iron / ductile iron pipes in position for taking out branch connection by inserting new tee etc for 80 mm bore pipe etc complete all as specified and directed by Engineer-in-Charge
All as per Sl item No 103 (here-in-before) but for 100 mm
All as per Sl item No 103 (here-in-before) but for 150 mm
All as per Sl item No 103 (here-in-before) but for 200 mm
All as per Sl item No 103 (here-in-before) but for 250 mm
All as per Sl item No 103 (here-in-before) but for 300 mm
Dismantaling old valve chamber including masanary foundation concrete cover etc. complete, iM&L for block masonary in cement and sand mortar (1:6) including cement plaster in cement and sand mortar (1:4) and refixing MS cover including necessary earth work, of following sizes.
1500 mm x 1200 mm x 1000 mm
1500 mm x 1100 mm x 1000 mm
1500 mm x 1000 mm x 1000 mm
Supply & Fixing in repair /replacement including stainer for CI / DI pipe of size 80mm etc complete all as specified and directed by Engineer-in-Charge Make: Capstan/woltman/kirloskar
Supply & Fixing in repair /replacement including stainer for CI / DI pipe of size 100mm etc complete all as specified and directed by Engineer-in-Charge Make: Capstan/woltman/kirloskar
Supply & Fixing in repair /replacement including stainer for CI / DI pipe of size 150mm etc complete all as specified and directed by Engineer-in-Charge. Make: Capstan/woltman/kirloskar
Taking up or down PVC tubing and connections from trenches / walls / floors etc for 25 mm bore pipe etc complete all as specified and directed by Engineer-in-Charge.
All as per serial item No 116 (here-in-before) but 20 mm bore pipe
All as per serial item No 116 (here-in-before) but 15 mm bore pipe
Supply and fix PVC pipes,(LDPE) of pressre 6kgf/cm2 including necessary fittings such as sockets, elbows, tees, reducers, unions, nipples etc laid in trenches / walls / floors etc for the 25 bore pipe etc complete all as specified and directed by Engineer-in-Charge.
All as per serial item No 119 (here-in-before) but 20 mm bore pipe
All as per serial item No 119 (here-in-before) but 15 mm bore pipe
An amount of Rs 1,98,887.00 shall be deducted from BOQ on account of schedule of credit
L.T Associate
m/s shivam tools and equipment
Maruti Abhiyantriki
MS. G.A. CONSTRUCTION
OM SAI ASSOCIATES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .